메뉴 건너뛰기




Volumn 132, Issue 2, 2006, Pages 206-214

Determinants of international architectural, engineering, and construction firms' project success in China

Author keywords

Business management; China; Construction management; Engineering firms; International factors

Indexed keywords

BUSINESS MANAGEMENT; CHINA; CONSTRUCTION MANAGEMENT; ENGINEERING FIRMS; INTERNATIONAL FACTORS;

EID: 30844439150     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:2(206)     Document Type: Review
Times cited : (45)

References (12)
  • 1
    • 84858522319 scopus 로고    scopus 로고
    • Building and Construction Authority (BCA). (2002). " Export digest.. " 〈 http://www.bca.gov.sg 〉 (Aug. 21, 2003).
    • (2002) Export Digest
  • 2
    • 0035280018 scopus 로고    scopus 로고
    • Design and build project success factors: Multivariate analysis
    • Chan, A. P. C., Ho, D. C. K., and Tam, C. M. (2001). " Design and build project success factors: Multivariate analysis.. " J. Constr. Eng. Manage., 127 (2), 93-100.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.2 , pp. 93-100
    • Chan, A.P.C.1    Ho, D.C.K.2    Tam, C.M.3
  • 3
    • 0033937449 scopus 로고    scopus 로고
    • What are the determinants of the location of foreign direct investment? the Chinese experience
    • Cheng, L. K., and Kwan, Y. K. (2000). " What are the determinants of the location of foreign direct investment? The Chinese experience.. " J. Int. Econ., 51 (2), 379-400.
    • (2000) J. Int. Econ. , vol.51 , Issue.2 , pp. 379-400
    • Cheng, L.K.1    Kwan, Y.K.2
  • 4
    • 1842648887 scopus 로고    scopus 로고
    • National Bureau Statistics, China Statistics Press, Beijing
    • China Statistical Yearbook. (2002). National bureau statistics, China Statistics Press, Beijing.
    • (2002) China Statistical Yearbook
  • 5
    • 15944380061 scopus 로고
    • Multinational contracting
    • K. P.Suavant and P.Mallampally, eds., Routledge, New York
    • Enderwick, P. (1993). " Multinational contracting.. " Transnational corporations in services, K. P. Suavant, and, P. Mallampally, eds., Routledge, New York, 186-203.
    • (1993) Transnational Corporations in Services , pp. 186-203
    • Enderwick, P.1
  • 6
    • 0035392728 scopus 로고    scopus 로고
    • Approaches for making risk-based Go/No-Go decision for international projects
    • Han, S. H., and Diekmann, J. E. (2001). " Approaches for making risk-based Go/No-Go decision for international projects.. " J. Constr. Eng. Manage., 127 (4), 300-308.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 300-308
    • Han, S.H.1    Diekmann, J.E.2
  • 7
    • 0030188163 scopus 로고    scopus 로고
    • Inter-city competition for foreign direct investment: Static and dynamic effects of China's incentive areas
    • Head, K., and Ries, J. (1996). " Inter-city competition for foreign direct investment: Static and dynamic effects of China's incentive areas.. " J. Urban Econ., 40 (1), 38-60.
    • (1996) J. Urban Econ. , vol.40 , Issue.1 , pp. 38-60
    • Head, K.1    Ries, J.2
  • 8
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of U.S. project delivery systems
    • Konchar, M., and Sanvido, V. (1998). " Comparison of U.S. project delivery systems.. " J. Constr. Eng. Manage., 124 (6), 435-444.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 10
    • 2142774401 scopus 로고    scopus 로고
    • Predicting performance of design-build and design-bid-build projects
    • Ling, F. Y. Y., Chan, S. L., Chong, E., and Ee, L. P. (2004). " Predicting performance of design-build and design-bid-build projects.. " J. Constr. Eng. Manage., 130 (1), 75-83.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.1 , pp. 75-83
    • Ling, F.Y.Y.1    Chan, S.L.2    Chong, E.3    Ee, L.P.4
  • 11
    • 15944414773 scopus 로고    scopus 로고
    • Enablers that help foreign architectural, engineering, and construction firms win construction contracts in China
    • Ling, F. Y. Y., Ibbs, C. W., and Kumaraswamy, M. M. (2005). " Enablers that help foreign architectural, engineering, and construction firms win construction contracts in China.. " J. Manage. Eng., 21 (2), 63-69.
    • (2005) J. Manage. Eng. , vol.21 , Issue.2 , pp. 63-69
    • Ling, F.Y.Y.1    Ibbs, C.W.2    Kumaraswamy, M.M.3
  • 12
    • 0032208060 scopus 로고    scopus 로고
    • Model for public sector design-build project selection
    • Molenaar, K. R., and Songer, A. D. (1998). " Model for public sector design-build project selection.. " J. Constr. Eng. Manage., 124 (6), 467-479.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 467-479
    • Molenaar, K.R.1    Songer, A.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.