-
1
-
-
27144483384
-
Improvement heuristic for the flow-shop scheduling problem: An adaptive-learning approach
-
DOI 10.1016/j.ejor.2004.06.039, PII S0377221705001463
-
Agarwal, A., Colak, S., and Eryarsoy, E., 2006. Improvement heuristic for the flow-shop scheduling problem: an adaptivelearning approach. European Journal of Operational Research, 169 (3), 801-815. (Pubitemid 41492017)
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 801-815
-
-
Agarwal, A.1
Colak, S.2
Eryarsoy, E.3
-
2
-
-
84985810576
-
Due date assignment, job order release, and sequencing interaction in job shop scheduling
-
Ahmed, I. and Fisher, W.W., 1992. Due date assignment, job order release, and sequencing interaction in job shop scheduling. Decision Science, 23 (3), 633-647.
-
(1992)
Decision Science
, vol.23
, Issue.3
, pp. 633-647
-
-
Ahmed, I.1
Fisher, W.W.2
-
3
-
-
35548991809
-
An estimation of distribution algorithm with intelligent local search for rule-based nurse rostering
-
DOI 10.1057/palgrave.jors.2602308, PII 2602308
-
Aickelin, U., Burke, E.K., and Li, J., 2007. An estimation of distribution algorithm with intelligent local search for rule-based nurse rostering. Journal of Operational Research Society, 58 (12), 1574-1585. (Pubitemid 350129146)
-
(2007)
Journal of the Operational Research Society
, vol.58
, Issue.12
, pp. 1574-1585
-
-
Aickelin, U.1
Burke, E.K.2
Li, J.3
-
4
-
-
34548254543
-
An estimation of distribution algorithm for nurse scheduling
-
Aickelin, U. and Li, J., 2007. An estimation of distribution algorithm for nurse scheduling. Annals of Operation Research, 155 (1), 289-309.
-
(2007)
Annals of Operation Research
, vol.155
, Issue.1
, pp. 289-309
-
-
Aickelin, U.1
Li, J.2
-
5
-
-
0040402369
-
A graphical approach to production scheduling problems
-
Akers, S.B., 1956. A graphical approach to production scheduling problems. Operation Research, 4 (2), 244-245.
-
(1956)
Operation Research
, vol.4
, Issue.2
, pp. 244-245
-
-
Akers, S.B.1
-
6
-
-
40749129898
-
Due date assignment using ADRES and simulated annealing
-
DOI 10.1504/IJISE.2008.017421
-
Baykasoǧlu, A., Göçken, M., and Unutmaz, Z.D., 2008a. Due date assignment using ADRES and simulated annealing. International Journal of Industrial Systems Engineering, 3 (3), 277-297. (Pubitemid 351385702)
-
(2008)
International Journal of Industrial and Systems Engineering
, vol.3
, Issue.3
, pp. 277-297
-
-
Baykasoglu, A.1
Gocken, M.2
Zeynep, U.D.3
-
7
-
-
35848966779
-
New approaches to due date assignment in job shops
-
DOI 10.1016/j.ejor.2007.02.020, PII S0377221707002421
-
Baykasoǧlu, A., Göçken, M., and Unutmaz, Z.D., 2008b. New approaches to due date assignment in job shops. European Journal of Operational Research, 187 (1), 31-45. (Pubitemid 350061089)
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.1
, pp. 31-45
-
-
Baykasoglu, A.1
Gocken, M.2
Unutmaz, Z.D.3
-
8
-
-
0010651843
-
On the complexity of two machine job shop scheduling with regular objective functions
-
Brucker, P., Kravchenko, S.A., and Sotskov, Y.N., 1997. On the complexity of two machine job shop scheduling with regular objective functions. OR Spectrum, 19 (1), 5-10.
-
(1997)
OR Spectrum
, vol.19
, Issue.1
, pp. 5-10
-
-
Brucker, P.1
Kravchenko, S.A.2
Sotskov, Y.N.3
-
9
-
-
34249887362
-
Complexity of shop-scheduling problems with fixed number of jobs: A survey
-
DOI 10.1007/s00186-006-0127-8
-
Brucker, P., Sotskov, Y.N., and Werner, F., 2007. Complexity of shop-scheduling problems with fixed number of jobs: a survey. Mathematical Methods of Operations Research, 65 (3), 461-481. (Pubitemid 46868574)
-
(2007)
Mathematical Methods of Operations Research
, vol.65
, Issue.3
, pp. 461-481
-
-
Brucker, P.1
Sotskov, Yu.N.2
Werner, F.3
-
10
-
-
70449597987
-
Permutation flow shop scheduling with earliness and tardiness penalties
-
Chandra, P., Mehta, P., and Tirupati, D., 2009. Permutation flow shop scheduling with earliness and tardiness penalties. International Journal of Production Research, 47 (20), 5591-5610.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.20
, pp. 5591-5610
-
-
Chandra, P.1
Mehta, P.2
Tirupati, D.3
-
11
-
-
23044463387
-
Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
-
DOI 10.1007/s10845-005-1663-4
-
Chang, P.C., Nieh, J.C., and Liao, T.W., 2005. Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. Journal of Intelligent Manufacturing, 16 (4-5), 549-557. (Pubitemid 41067724)
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.4-5
, pp. 549-557
-
-
Chang, P.-C.1
Hieh, J.-C.2
Liao, T.W.3
-
12
-
-
43449100389
-
A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant
-
DOI 10.1007/s00170-006-0869-8
-
Chen, T., Jeang, A., and Wang, Y.C., 2008. A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant. International Journal of Advanced Manufacturing Technology, 36 (5-6), 570-581. (Pubitemid 351665146)
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.36
, Issue.5-6
, pp. 570-581
-
-
Chen, T.1
Jeang, A.2
Wang, Y.-C.3
-
13
-
-
0003846047
-
-
Technical report MSR-TR-94-17 Microsoft Research, Redmond, Wirginia
-
Chickering, D.M., Geiger, D., and Heckerman, D., 1994. Learning Bayesian networks is NP-hard. Technical report MSR-TR- 94-17, Microsoft Research, Redmond, Wirginia.
-
(1994)
Learning Bayesian Networks Is NP-hard
-
-
Chickering, D.M.1
Geiger, D.2
Heckerman, D.3
-
14
-
-
0041732089
-
A case-based expert support system for due-date assignment in a wafer fabrication factory
-
Chiu, C., Chang, P.C., and Chiu, N.H., 2003. A case-based expert support system for due-date assignment in a wafer fabrication factory. Journal of Intelligent Manufacturing, 14 (3-4), 287-296.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.3-4
, pp. 287-296
-
-
Chiu, C.1
Chang, P.C.2
Chiu, N.H.3
-
15
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
Conway, R.W., 1965. Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16 (4), 228-237.
-
(1965)
Journal of Industrial Engineering
, vol.16
, Issue.4
, pp. 228-237
-
-
Conway, R.W.1
-
16
-
-
37049003027
-
A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem
-
DOI 10.1016/j.cor.2006.12.019, PII S0305054806003194
-
Essafi, I., Mati, Y., and Dauzère-Pérès, S., 2008. A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem. Computers & Operations Research, 35 (8), 2599-2616. (Pubitemid 350245426)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.8
, pp. 2599-2616
-
-
Essafi, I.1
Mati, Y.2
Dauzere-Peres, S.3
-
17
-
-
34848914836
-
Multiple machine JIT scheduling: A tabu search approach
-
DOI 10.1080/00207540600871228, PII 770289026
-
Finke, D.A., Medeiros, D.J., and Traband, M.T., 2007. Multiple machine JIT scheduling: a tabu search approach. International Journal of Production Research, 45 (21), 4899-4915. (Pubitemid 47507492)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.21
, pp. 4899-4915
-
-
Finke, D.A.1
Medeiros, D.J.2
Traband, M.T.3
-
18
-
-
0036507457
-
Due date assignment and scheduling: SLK, TWK and other due date assignment models
-
DOI 10.1080/09537280110069621
-
Gordon, V., Proth, J., and Chu, C., 2002. Due date assignment and scheduling: SLK, TWK and other due date assignment models. Production Planning and Control, 13 (2), 117-132. (Pubitemid 34586389)
-
(2002)
Production Planning and Control
, vol.13
, Issue.2
, pp. 117-132
-
-
Gordon, V.S.1
Proth, J.-M.2
Chu, C.3
-
19
-
-
0024131340
-
How to more effectively accept and refuse orders
-
Guerrero, H.H. and Kern, G., 1988. How to more effectively accept and refuse orders. Production and Inventory Management, 29 (4), 59-63.
-
(1988)
Production and Inventory Management
, vol.29
, Issue.4
, pp. 59-63
-
-
Guerrero, H.H.1
Kern, G.2
-
20
-
-
34249973653
-
A survey of priority rule-based scheduling
-
Haupt, R., 1989. A survey of priority rule-based scheduling. OR Spectrum, 11 (1), 3-16.
-
(1989)
OR Spectrum
, vol.11
, Issue.1
, pp. 3-16
-
-
Haupt, R.1
-
21
-
-
34249761849
-
Learning Bayesian networks: The combination of knowledge and statistical data
-
Heckerman, D., Geiger, D., and Chickering, D.M., 1995. Learning Bayesian networks: the combination of knowledge and statistical data. Machine Learning, 20 (3), 197-243.
-
(1995)
Machine Learning
, vol.20
, Issue.3
, pp. 197-243
-
-
Heckerman, D.1
Geiger, D.2
Chickering, D.M.3
-
22
-
-
3943054030
-
Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
-
Hino, C.M., Ronconi, C.P., and Mendes, A.B., 2005. Minimizing earliness and tardiness penalties in a single-machine problem with a common due date. European Journal of Operational Research, 160 (1), 190-201.
-
(2005)
European Journal of Operational Research
, vol.160
, Issue.1
, pp. 190-201
-
-
Hino, C.M.1
Ronconi, C.P.2
Mendes, A.B.3
-
23
-
-
1942472554
-
Due date assignment using artificial neural networks under different shop floor control strategies
-
Hsu, S.Y. and Sha, D.Y., 2004. Due date assignment using artificial neural networks under different shop floor control strategies. International Journal of Production Research, 42 (9), 1727-1745.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.9
, pp. 1727-1745
-
-
Hsu, S.Y.1
Sha, D.Y.2
-
24
-
-
0033102020
-
Deterministic job-shop scheduling: Past, present and future
-
Jain, A.S. and Meeran, S., 1999. Deterministic job-shop scheduling: past, present and future. European Journal of Operational Research, 113 (2), 390-434.
-
(1999)
European Journal of Operational Research
, vol.113
, Issue.2
, pp. 390-434
-
-
Jain, A.S.1
Meeran, S.2
-
25
-
-
60349125187
-
An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems
-
Jarboui, B., Eddaly, M., and Siarry, P., 2009. An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems. Computers & Operations Research, 36 (9), 2638-2646.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.9
, pp. 2638-2646
-
-
Jarboui, B.1
Eddaly, M.2
Siarry, P.3
-
26
-
-
33847363196
-
Literature review of JIT-KANBAN system
-
DOI 10.1007/s00170-005-0340-2
-
Kumar, C.S. and Panneerselvam, R., 2007. Literature review of JIT-KANBAN system. International Journal of Advanced Manufacturing Technology, 32 (3-4), 393-408. (Pubitemid 46331772)
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.32
, Issue.3-4
, pp. 393-408
-
-
Kumar, C.S.1
Panneerselvam, R.2
-
28
-
-
77957077792
-
A 'pseudopolynomial' algorithm for sequencing jobs to minimize total tardiness
-
Lawler, E.L., 1977. A 'pseudopolynomial' algorithm for sequencing jobs to minimize total tardiness. Annals of Discrete Mathematics, 1, 331-342.
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 331-342
-
-
Lawler, E.L.1
-
29
-
-
34147109210
-
Simultaneous optimization of classical objectives in JIT scheduling
-
DOI 10.1016/j.ejor.2006.07.019, PII S037722170600796X
-
Lebacque, V., Jost, V., and Brauner, N., 2007. Simultaneous optimization of classical objectives in JIT scheduling. European Journal of Operational Research, 182 (1), 29-39. (Pubitemid 46561153)
-
(2007)
European Journal of Operational Research
, vol.182
, Issue.1
, pp. 29-39
-
-
Lebacque, V.1
Jost, V.2
Brauner, N.3
-
30
-
-
77951139709
-
Complexity of machine scheduling problems
-
Lenstra, J.K., Kan, A.H.G.R., and Brucker, P., 1977. Complexity of machine scheduling problems. Annals of Discrete Mathematics, 1, 343-362.
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 343-362
-
-
Lenstra, J.K.1
Kan, A.H.G.R.2
Brucker, P.3
-
31
-
-
14844362583
-
Scalability and performance of computational structures for real-time order promising
-
DOI 10.1007/s10845-005-4821-9
-
Lucas, A.J. and Moses, S.A., 2005. Scalability and performance of computational structures for real-time order promising. Journal of Intelligent Manufacturing, 16 (1), 5-20. (Pubitemid 40356752)
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.1
, pp. 5-20
-
-
Lucas, A.J.1
Moses, S.A.2
-
32
-
-
0000006895
-
Demand management: The evaluation of price and due date negotiation strategies using simulation
-
Moodie, D.R., 1999. Demand management: the evaluation of price and due date negotiation strategies using simulation. Productions and Operations Management, 8 (2), 151-162.
-
(1999)
Productions and Operations Management
, vol.8
, Issue.2
, pp. 151-162
-
-
Moodie, D.R.1
-
33
-
-
0033096959
-
Due date demand management: Negotiating the trade-off between price and delivery
-
Moodie, D.R. and Bobrowski, P.M., 1999. Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37 (5), 997-1021.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.5
, pp. 997-1021
-
-
Moodie, D.R.1
Bobrowski, P.M.2
-
34
-
-
0036180213
-
A survey of optimization by building and using probabilistic models
-
DOI 10.1023/A:1013500812258
-
Pelikan, M., Goldberg, D.E., and Lobo, F.G., 2002. A survey of optimization by building and using probabilistic models. Computational Optimization and Applications, 21 (1), 5-20. (Pubitemid 34172679)
-
(2002)
Computational Optimization and Applications
, vol.21
, Issue.1
, pp. 5-20
-
-
Pelikan, M.1
Goldberg, D.E.2
Lobo, F.G.3
-
35
-
-
0021468849
-
Framework for the study of due date management in job shop
-
Ragartz, G.L. and Mabert, V.A., 1984. Framework for the study of due date management in job shop. Production Research, 22 (4), 685-695.
-
(1984)
Production Research
, vol.22
, Issue.4
, pp. 685-695
-
-
Ragartz, G.L.1
Mabert, V.A.2
-
36
-
-
56549109952
-
Order acceptance using genetic algorithms
-
Rom, W.O. and Slotnick, S.A., 2009. Order acceptance using genetic algorithms. Computers & Operations Research, 36 (6), 1758-1767.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.6
, pp. 1758-1767
-
-
Rom, W.O.1
Slotnick, S.A.2
-
37
-
-
2942642529
-
Due-date assignment in wafer fabrication using artificial neural networks
-
Sha, D.Y. and Hsu, S.Y., 2004. Due-date assignment in wafer fabrication using artificial neural networks. International Journal of Advanced Manufacturing Technology, 23 (9-10), 768-775.
-
(2004)
International Journal of Advanced Manufacturing Technology
, vol.23
, Issue.9-10
, pp. 768-775
-
-
Sha, D.Y.1
Hsu, S.Y.2
-
38
-
-
33745167345
-
Development and evaluation of a tree-indexing approach to improve case-based reasoning: Illustrated using the due date assignment problem
-
DOI 10.1080/00207540500168238, PII K65612503214
-
Sha, D.Y. and Liu, C.H., 2006. Development and evaluation of a tree-indexing approach to improve case-based reasoning: illustrated using the due date assignment problem. International Journal of Production Research, 44 (15), 3033-3049. (Pubitemid 43898332)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.15
, pp. 3033-3049
-
-
Sha, D.Y.1
Liu, C.-H.2
-
39
-
-
70350102524
-
Solving flow shop scheduling problems with probabilistic model-building genetic algorithms using edge histograms
-
Singapore
-
Tsutsui, S. and Miki, M., 2002. Solving flow shop scheduling problems with probabilistic model-building genetic algorithms using edge histograms. In: Proceedings of the 4th Asia-Pacific Conference on Simulated Evolution and Learning, Singapore, 465-471.
-
(2002)
Proceedings of the 4th Asia-Pacific Conference on Simulated Evolution and Learning
, pp. 465-471
-
-
Tsutsui, S.1
Miki, M.2
-
40
-
-
0026186620
-
Dynamic rules for due date assignment
-
Vig, M.M. and Dooley, K.J., 1991. Dynamic rules for due date assignment. International Journal of Production Research, 29 (7), 1361-1377.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
41
-
-
77955669762
-
A competitive progression perspective of JIT systems: Evidence from early US implementations
-
White, R.E., Ojha, D., and Kuo, C.C., 2010. A competitive progression perspective of JIT systems: evidence from early US implementations. International Journal of Production Research, 48 (20), 6103-6124.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.20
, pp. 6103-6124
-
-
White, R.E.1
Ojha, D.2
Kuo, C.C.3
-
42
-
-
34250219585
-
A very fast TS/SA algorithm for the job shop scheduling problem
-
DOI 10.1016/j.cor.2006.02.024, PII S0305054806000670
-
Zhang, C.Y., et al., 2008. A very fast TS/SA algorithm for the job shop scheduling problem. Computers & Operations Research, 35 (1), 282-294. (Pubitemid 46899361)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.1
, pp. 282-294
-
-
Zhang, C.Y.1
Li, P.2
Rao, Y.3
Guan, Z.4
-
43
-
-
70449637498
-
Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems
-
Zhou, R., Nee, A.Y.C., and Lee, H.P., 2009. Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems. International Journal of Production Research, 47 (11), 2903-2920.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.11
, pp. 2903-2920
-
-
Zhou, R.1
Nee, A.Y.C.2
Lee, H.P.3
|