메뉴 건너뛰기




Volumn 50, Issue 1, 2012, Pages 5-22

A double-layered optimisation approach for the integrated due date assignment and scheduling problem

Author keywords

due date assignment; estimation of distribution; job shop scheduling problem; parameter perturbation method

Indexed keywords

COMPUTATIONAL EXPERIMENT; DUE DATES; DUE-DATE ASSIGNMENT; DUE-DATE QUOTATION; DUE-DATE SETTING; ESTIMATION OF DISTRIBUTION; JOB SHOP SCHEDULING PROBLEMS; LEADTIME; MAKE TO ORDER; MARKET COMPETITION; NEIGHBOURHOOD SEARCH; OPTIMISATION MODELS; OPTIMISATIONS; PARAMETER PERTURBATION; PRODUCTION SCHEDULING PROBLEMS; SCHEDULING PROBLEM; SHOP SCHEDULING;

EID: 84863280144     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.571440     Document Type: Article
Times cited : (12)

References (43)
  • 1
    • 27144483384 scopus 로고    scopus 로고
    • Improvement heuristic for the flow-shop scheduling problem: An adaptive-learning approach
    • DOI 10.1016/j.ejor.2004.06.039, PII S0377221705001463
    • Agarwal, A., Colak, S., and Eryarsoy, E., 2006. Improvement heuristic for the flow-shop scheduling problem: an adaptivelearning approach. European Journal of Operational Research, 169 (3), 801-815. (Pubitemid 41492017)
    • (2006) European Journal of Operational Research , vol.169 , Issue.3 , pp. 801-815
    • Agarwal, A.1    Colak, S.2    Eryarsoy, E.3
  • 2
    • 84985810576 scopus 로고
    • Due date assignment, job order release, and sequencing interaction in job shop scheduling
    • Ahmed, I. and Fisher, W.W., 1992. Due date assignment, job order release, and sequencing interaction in job shop scheduling. Decision Science, 23 (3), 633-647.
    • (1992) Decision Science , vol.23 , Issue.3 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 3
    • 35548991809 scopus 로고    scopus 로고
    • An estimation of distribution algorithm with intelligent local search for rule-based nurse rostering
    • DOI 10.1057/palgrave.jors.2602308, PII 2602308
    • Aickelin, U., Burke, E.K., and Li, J., 2007. An estimation of distribution algorithm with intelligent local search for rule-based nurse rostering. Journal of Operational Research Society, 58 (12), 1574-1585. (Pubitemid 350129146)
    • (2007) Journal of the Operational Research Society , vol.58 , Issue.12 , pp. 1574-1585
    • Aickelin, U.1    Burke, E.K.2    Li, J.3
  • 4
    • 34548254543 scopus 로고    scopus 로고
    • An estimation of distribution algorithm for nurse scheduling
    • Aickelin, U. and Li, J., 2007. An estimation of distribution algorithm for nurse scheduling. Annals of Operation Research, 155 (1), 289-309.
    • (2007) Annals of Operation Research , vol.155 , Issue.1 , pp. 289-309
    • Aickelin, U.1    Li, J.2
  • 5
    • 0040402369 scopus 로고
    • A graphical approach to production scheduling problems
    • Akers, S.B., 1956. A graphical approach to production scheduling problems. Operation Research, 4 (2), 244-245.
    • (1956) Operation Research , vol.4 , Issue.2 , pp. 244-245
    • Akers, S.B.1
  • 7
    • 35848966779 scopus 로고    scopus 로고
    • New approaches to due date assignment in job shops
    • DOI 10.1016/j.ejor.2007.02.020, PII S0377221707002421
    • Baykasoǧlu, A., Göçken, M., and Unutmaz, Z.D., 2008b. New approaches to due date assignment in job shops. European Journal of Operational Research, 187 (1), 31-45. (Pubitemid 350061089)
    • (2008) European Journal of Operational Research , vol.187 , Issue.1 , pp. 31-45
    • Baykasoglu, A.1    Gocken, M.2    Unutmaz, Z.D.3
  • 8
    • 0010651843 scopus 로고    scopus 로고
    • On the complexity of two machine job shop scheduling with regular objective functions
    • Brucker, P., Kravchenko, S.A., and Sotskov, Y.N., 1997. On the complexity of two machine job shop scheduling with regular objective functions. OR Spectrum, 19 (1), 5-10.
    • (1997) OR Spectrum , vol.19 , Issue.1 , pp. 5-10
    • Brucker, P.1    Kravchenko, S.A.2    Sotskov, Y.N.3
  • 9
    • 34249887362 scopus 로고    scopus 로고
    • Complexity of shop-scheduling problems with fixed number of jobs: A survey
    • DOI 10.1007/s00186-006-0127-8
    • Brucker, P., Sotskov, Y.N., and Werner, F., 2007. Complexity of shop-scheduling problems with fixed number of jobs: a survey. Mathematical Methods of Operations Research, 65 (3), 461-481. (Pubitemid 46868574)
    • (2007) Mathematical Methods of Operations Research , vol.65 , Issue.3 , pp. 461-481
    • Brucker, P.1    Sotskov, Yu.N.2    Werner, F.3
  • 10
    • 70449597987 scopus 로고    scopus 로고
    • Permutation flow shop scheduling with earliness and tardiness penalties
    • Chandra, P., Mehta, P., and Tirupati, D., 2009. Permutation flow shop scheduling with earliness and tardiness penalties. International Journal of Production Research, 47 (20), 5591-5610.
    • (2009) International Journal of Production Research , vol.47 , Issue.20 , pp. 5591-5610
    • Chandra, P.1    Mehta, P.2    Tirupati, D.3
  • 11
    • 23044463387 scopus 로고    scopus 로고
    • Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
    • DOI 10.1007/s10845-005-1663-4
    • Chang, P.C., Nieh, J.C., and Liao, T.W., 2005. Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. Journal of Intelligent Manufacturing, 16 (4-5), 549-557. (Pubitemid 41067724)
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.4-5 , pp. 549-557
    • Chang, P.-C.1    Hieh, J.-C.2    Liao, T.W.3
  • 12
    • 43449100389 scopus 로고    scopus 로고
    • A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant
    • DOI 10.1007/s00170-006-0869-8
    • Chen, T., Jeang, A., and Wang, Y.C., 2008. A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant. International Journal of Advanced Manufacturing Technology, 36 (5-6), 570-581. (Pubitemid 351665146)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.5-6 , pp. 570-581
    • Chen, T.1    Jeang, A.2    Wang, Y.-C.3
  • 14
    • 0041732089 scopus 로고    scopus 로고
    • A case-based expert support system for due-date assignment in a wafer fabrication factory
    • Chiu, C., Chang, P.C., and Chiu, N.H., 2003. A case-based expert support system for due-date assignment in a wafer fabrication factory. Journal of Intelligent Manufacturing, 14 (3-4), 287-296.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.3-4 , pp. 287-296
    • Chiu, C.1    Chang, P.C.2    Chiu, N.H.3
  • 15
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • Conway, R.W., 1965. Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16 (4), 228-237.
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.4 , pp. 228-237
    • Conway, R.W.1
  • 16
    • 37049003027 scopus 로고    scopus 로고
    • A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem
    • DOI 10.1016/j.cor.2006.12.019, PII S0305054806003194
    • Essafi, I., Mati, Y., and Dauzère-Pérès, S., 2008. A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem. Computers & Operations Research, 35 (8), 2599-2616. (Pubitemid 350245426)
    • (2008) Computers and Operations Research , vol.35 , Issue.8 , pp. 2599-2616
    • Essafi, I.1    Mati, Y.2    Dauzere-Peres, S.3
  • 17
    • 34848914836 scopus 로고    scopus 로고
    • Multiple machine JIT scheduling: A tabu search approach
    • DOI 10.1080/00207540600871228, PII 770289026
    • Finke, D.A., Medeiros, D.J., and Traband, M.T., 2007. Multiple machine JIT scheduling: a tabu search approach. International Journal of Production Research, 45 (21), 4899-4915. (Pubitemid 47507492)
    • (2007) International Journal of Production Research , vol.45 , Issue.21 , pp. 4899-4915
    • Finke, D.A.1    Medeiros, D.J.2    Traband, M.T.3
  • 18
    • 0036507457 scopus 로고    scopus 로고
    • Due date assignment and scheduling: SLK, TWK and other due date assignment models
    • DOI 10.1080/09537280110069621
    • Gordon, V., Proth, J., and Chu, C., 2002. Due date assignment and scheduling: SLK, TWK and other due date assignment models. Production Planning and Control, 13 (2), 117-132. (Pubitemid 34586389)
    • (2002) Production Planning and Control , vol.13 , Issue.2 , pp. 117-132
    • Gordon, V.S.1    Proth, J.-M.2    Chu, C.3
  • 19
    • 0024131340 scopus 로고
    • How to more effectively accept and refuse orders
    • Guerrero, H.H. and Kern, G., 1988. How to more effectively accept and refuse orders. Production and Inventory Management, 29 (4), 59-63.
    • (1988) Production and Inventory Management , vol.29 , Issue.4 , pp. 59-63
    • Guerrero, H.H.1    Kern, G.2
  • 20
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R., 1989. A survey of priority rule-based scheduling. OR Spectrum, 11 (1), 3-16.
    • (1989) OR Spectrum , vol.11 , Issue.1 , pp. 3-16
    • Haupt, R.1
  • 21
    • 34249761849 scopus 로고
    • Learning Bayesian networks: The combination of knowledge and statistical data
    • Heckerman, D., Geiger, D., and Chickering, D.M., 1995. Learning Bayesian networks: the combination of knowledge and statistical data. Machine Learning, 20 (3), 197-243.
    • (1995) Machine Learning , vol.20 , Issue.3 , pp. 197-243
    • Heckerman, D.1    Geiger, D.2    Chickering, D.M.3
  • 22
    • 3943054030 scopus 로고    scopus 로고
    • Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
    • Hino, C.M., Ronconi, C.P., and Mendes, A.B., 2005. Minimizing earliness and tardiness penalties in a single-machine problem with a common due date. European Journal of Operational Research, 160 (1), 190-201.
    • (2005) European Journal of Operational Research , vol.160 , Issue.1 , pp. 190-201
    • Hino, C.M.1    Ronconi, C.P.2    Mendes, A.B.3
  • 23
    • 1942472554 scopus 로고    scopus 로고
    • Due date assignment using artificial neural networks under different shop floor control strategies
    • Hsu, S.Y. and Sha, D.Y., 2004. Due date assignment using artificial neural networks under different shop floor control strategies. International Journal of Production Research, 42 (9), 1727-1745.
    • (2004) International Journal of Production Research , vol.42 , Issue.9 , pp. 1727-1745
    • Hsu, S.Y.1    Sha, D.Y.2
  • 24
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • Jain, A.S. and Meeran, S., 1999. Deterministic job-shop scheduling: past, present and future. European Journal of Operational Research, 113 (2), 390-434.
    • (1999) European Journal of Operational Research , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 25
    • 60349125187 scopus 로고    scopus 로고
    • An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems
    • Jarboui, B., Eddaly, M., and Siarry, P., 2009. An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems. Computers & Operations Research, 36 (9), 2638-2646.
    • (2009) Computers & Operations Research , vol.36 , Issue.9 , pp. 2638-2646
    • Jarboui, B.1    Eddaly, M.2    Siarry, P.3
  • 28
    • 77957077792 scopus 로고
    • A 'pseudopolynomial' algorithm for sequencing jobs to minimize total tardiness
    • Lawler, E.L., 1977. A 'pseudopolynomial' algorithm for sequencing jobs to minimize total tardiness. Annals of Discrete Mathematics, 1, 331-342.
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 331-342
    • Lawler, E.L.1
  • 29
    • 34147109210 scopus 로고    scopus 로고
    • Simultaneous optimization of classical objectives in JIT scheduling
    • DOI 10.1016/j.ejor.2006.07.019, PII S037722170600796X
    • Lebacque, V., Jost, V., and Brauner, N., 2007. Simultaneous optimization of classical objectives in JIT scheduling. European Journal of Operational Research, 182 (1), 29-39. (Pubitemid 46561153)
    • (2007) European Journal of Operational Research , vol.182 , Issue.1 , pp. 29-39
    • Lebacque, V.1    Jost, V.2    Brauner, N.3
  • 31
    • 14844362583 scopus 로고    scopus 로고
    • Scalability and performance of computational structures for real-time order promising
    • DOI 10.1007/s10845-005-4821-9
    • Lucas, A.J. and Moses, S.A., 2005. Scalability and performance of computational structures for real-time order promising. Journal of Intelligent Manufacturing, 16 (1), 5-20. (Pubitemid 40356752)
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.1 , pp. 5-20
    • Lucas, A.J.1    Moses, S.A.2
  • 32
    • 0000006895 scopus 로고    scopus 로고
    • Demand management: The evaluation of price and due date negotiation strategies using simulation
    • Moodie, D.R., 1999. Demand management: the evaluation of price and due date negotiation strategies using simulation. Productions and Operations Management, 8 (2), 151-162.
    • (1999) Productions and Operations Management , vol.8 , Issue.2 , pp. 151-162
    • Moodie, D.R.1
  • 33
    • 0033096959 scopus 로고    scopus 로고
    • Due date demand management: Negotiating the trade-off between price and delivery
    • Moodie, D.R. and Bobrowski, P.M., 1999. Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37 (5), 997-1021.
    • (1999) International Journal of Production Research , vol.37 , Issue.5 , pp. 997-1021
    • Moodie, D.R.1    Bobrowski, P.M.2
  • 34
    • 0036180213 scopus 로고    scopus 로고
    • A survey of optimization by building and using probabilistic models
    • DOI 10.1023/A:1013500812258
    • Pelikan, M., Goldberg, D.E., and Lobo, F.G., 2002. A survey of optimization by building and using probabilistic models. Computational Optimization and Applications, 21 (1), 5-20. (Pubitemid 34172679)
    • (2002) Computational Optimization and Applications , vol.21 , Issue.1 , pp. 5-20
    • Pelikan, M.1    Goldberg, D.E.2    Lobo, F.G.3
  • 35
    • 0021468849 scopus 로고
    • Framework for the study of due date management in job shop
    • Ragartz, G.L. and Mabert, V.A., 1984. Framework for the study of due date management in job shop. Production Research, 22 (4), 685-695.
    • (1984) Production Research , vol.22 , Issue.4 , pp. 685-695
    • Ragartz, G.L.1    Mabert, V.A.2
  • 36
    • 56549109952 scopus 로고    scopus 로고
    • Order acceptance using genetic algorithms
    • Rom, W.O. and Slotnick, S.A., 2009. Order acceptance using genetic algorithms. Computers & Operations Research, 36 (6), 1758-1767.
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 1758-1767
    • Rom, W.O.1    Slotnick, S.A.2
  • 37
    • 2942642529 scopus 로고    scopus 로고
    • Due-date assignment in wafer fabrication using artificial neural networks
    • Sha, D.Y. and Hsu, S.Y., 2004. Due-date assignment in wafer fabrication using artificial neural networks. International Journal of Advanced Manufacturing Technology, 23 (9-10), 768-775.
    • (2004) International Journal of Advanced Manufacturing Technology , vol.23 , Issue.9-10 , pp. 768-775
    • Sha, D.Y.1    Hsu, S.Y.2
  • 38
    • 33745167345 scopus 로고    scopus 로고
    • Development and evaluation of a tree-indexing approach to improve case-based reasoning: Illustrated using the due date assignment problem
    • DOI 10.1080/00207540500168238, PII K65612503214
    • Sha, D.Y. and Liu, C.H., 2006. Development and evaluation of a tree-indexing approach to improve case-based reasoning: illustrated using the due date assignment problem. International Journal of Production Research, 44 (15), 3033-3049. (Pubitemid 43898332)
    • (2006) International Journal of Production Research , vol.44 , Issue.15 , pp. 3033-3049
    • Sha, D.Y.1    Liu, C.-H.2
  • 39
    • 70350102524 scopus 로고    scopus 로고
    • Solving flow shop scheduling problems with probabilistic model-building genetic algorithms using edge histograms
    • Singapore
    • Tsutsui, S. and Miki, M., 2002. Solving flow shop scheduling problems with probabilistic model-building genetic algorithms using edge histograms. In: Proceedings of the 4th Asia-Pacific Conference on Simulated Evolution and Learning, Singapore, 465-471.
    • (2002) Proceedings of the 4th Asia-Pacific Conference on Simulated Evolution and Learning , pp. 465-471
    • Tsutsui, S.1    Miki, M.2
  • 41
    • 77955669762 scopus 로고    scopus 로고
    • A competitive progression perspective of JIT systems: Evidence from early US implementations
    • White, R.E., Ojha, D., and Kuo, C.C., 2010. A competitive progression perspective of JIT systems: evidence from early US implementations. International Journal of Production Research, 48 (20), 6103-6124.
    • (2010) International Journal of Production Research , vol.48 , Issue.20 , pp. 6103-6124
    • White, R.E.1    Ojha, D.2    Kuo, C.C.3
  • 42
    • 34250219585 scopus 로고    scopus 로고
    • A very fast TS/SA algorithm for the job shop scheduling problem
    • DOI 10.1016/j.cor.2006.02.024, PII S0305054806000670
    • Zhang, C.Y., et al., 2008. A very fast TS/SA algorithm for the job shop scheduling problem. Computers & Operations Research, 35 (1), 282-294. (Pubitemid 46899361)
    • (2008) Computers and Operations Research , vol.35 , Issue.1 , pp. 282-294
    • Zhang, C.Y.1    Li, P.2    Rao, Y.3    Guan, Z.4
  • 43
    • 70449637498 scopus 로고    scopus 로고
    • Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems
    • Zhou, R., Nee, A.Y.C., and Lee, H.P., 2009. Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems. International Journal of Production Research, 47 (11), 2903-2920.
    • (2009) International Journal of Production Research , vol.47 , Issue.11 , pp. 2903-2920
    • Zhou, R.1    Nee, A.Y.C.2    Lee, H.P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.