메뉴 건너뛰기




Volumn 36, Issue 5-6, 2008, Pages 570-581

A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant

Author keywords

Allowance; Fuzzy back propagation network; Internal due date assignment; Self organization map; Wafer fab

Indexed keywords

BACKPROPAGATION; JOB ANALYSIS; SELF ORGANIZING MAPS; STRATEGIC PLANNING;

EID: 43449100389     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-006-0869-8     Document Type: Article
Times cited : (41)

References (23)
  • 1
    • 0032074551 scopus 로고    scopus 로고
    • The impact of priority rule combinations on lateness and tardiness
    • Barman S (1998) The impact of priority rule combinations on lateness and tardiness. IIE Transactions 30:495-504
    • (1998) IIE Transactions , vol.30 , pp. 495-504
    • Barman, S.1
  • 3
    • 33846682959 scopus 로고    scopus 로고
    • A hybrid regulation system by evolving CBR with GA for a twin laser measuring system
    • DOI 10.1007/s00170-005-0286-4
    • Chang P-C, Chen LY (2006) A hybrid regulation system by evolving CBR with GA for a twin laser measuring system. International Journal of Advanced Manufacturing Technology, DOI 10.1007/s00170-005-0286-4
    • (2006) International Journal of Advanced Manufacturing Technology
    • Chang, P.-C.1    Chen, L.Y.2
  • 4
    • 0037546939 scopus 로고    scopus 로고
    • A neural networks approach for due-date assignment in a wafer fabrication factory
    • 1
    • Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55-61
    • (2003) Int J Ind Eng , vol.10 , pp. 55-61
    • Chang, P.-C.1    Hsieh, J.-C.2
  • 6
    • 23044463387 scopus 로고    scopus 로고
    • Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
    • Chang P-C, Hsieh J-C, Liao TW (2005) Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. J Intell Manuf 16:549-557
    • (2005) J Intell Manuf , vol.16 , pp. 549-557
    • Chang, P.-C.1    Hsieh, J.-C.2    Liao, T.W.3
  • 7
    • 30344446393 scopus 로고    scopus 로고
    • Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory
    • Chang P-C, Liao TW (2006) Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6:198-206
    • (2006) Appl Soft Comput , vol.6 , pp. 198-206
    • Chang, P.-C.1    Liao, T.W.2
  • 8
    • 33750462377 scopus 로고    scopus 로고
    • A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry
    • DOI 10.1016/j.dss.2006.02.014
    • Chang P-C, Liu CH, Wang YW (2006) A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry. Decision Support Systems DOI 10.1016/j.dss.2006.02.014
    • (2006) Decision Support Systems
    • Chang, P.-C.1    Ch, L.2    Wang, Y.W.3
  • 9
    • 15844419035 scopus 로고    scopus 로고
    • A fuzzy back propagation network for output time prediction in a wafer fab
    • Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2/3F:211-222
    • (2003) Appl Soft Comput , vol.23 , pp. 211-222
    • Chen, T.1
  • 10
    • 53549088386 scopus 로고    scopus 로고
    • A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation
    • Chen T (2006) A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. Int J Adv Manuf Technol (in press)
    • (2006) Int J Adv Manuf Technol (In Press)
    • Chen, T.1
  • 11
    • 33750566327 scopus 로고    scopus 로고
    • A hybrid SOM-BPN approach to lot output time prediction in a wafer fab
    • DOI 10.1007/s11063-006-9027-4
    • Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Processing Letters DOI 10.1007/s11063-006-9027-4
    • (2006) Neural Processing Letters
    • Chen, T.1
  • 12
    • 33750718776 scopus 로고    scopus 로고
    • A look-ahead fuzzy back propagation network for lot output time series prediction in a wafer fab
    • Chen T (2006) A look-ahead fuzzy back propagation network for lot output time series prediction in a wafer fab. Lect Notes in Comput Sci 4234:974-982
    • (2006) Lect Notes in Comput Sci , vol.4234 , pp. 974-982
    • Chen, T.1
  • 13
    • 43449121772 scopus 로고    scopus 로고
    • An intelligent hybrid system for wafer lot output time prediction
    • Chen T (2006) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Infor (in press)
    • (2006) Adv Eng Infor (In Press)
    • Chen, T.1
  • 14
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • Gordon V, Proth J-M, Chu C (2002) A survey of the state-of-the-art of common due date assignment and scheduling research. Eur J Oper Res 139:1-25
    • (2002) Eur J Oper Res , vol.139 , pp. 1-25
    • Gordon, V.1    Proth, J.-M.2    Chu, C.3
  • 15
    • 2942642529 scopus 로고    scopus 로고
    • Due date assignment in wafer fabrication using artificial neural network
    • 9-10
    • Hsu SY, Sha DY (2004) Due date assignment in wafer fabrication using artificial neural network. Int J Adv Manuf Technol 23(9-10):768-775
    • (2004) Int J Adv Manuf Technol , vol.23 , pp. 768-775
    • Hsu, S.Y.1    Sha, D.Y.2
  • 17
    • 0002197262 scopus 로고
    • Distributed representation of fuzzy rules and its application to pattern classification
    • 1
    • Ishibuchi H, Nozaki K, Tanaka H (1992) Distributed representation of fuzzy rules and its application to pattern classification. Fuzzy Sets Sys 52(1):21-32
    • (1992) Fuzzy Sets Sys , vol.52 , pp. 21-32
    • Ishibuchi, H.1    Nozaki, K.2    Tanaka, H.3
  • 18
    • 10844279814 scopus 로고    scopus 로고
    • SOM ensemble-based image segmentation
    • Jiang Y, Zhou ZH (2004) SOM ensemble-based image segmentation. Neural Process Let 20:171-178
    • (2004) Neural Process Let , vol.20 , pp. 171-178
    • Jiang, Y.1    Zhou, Z.H.2
  • 20
    • 0000861722 scopus 로고
    • A proof of the queueing formula L = ë W
    • Little JDC (1961) A proof of the queueing formula L = ë W. Oper Res 9:383-387
    • (1961) Oper Res , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 21
    • 0036649442 scopus 로고    scopus 로고
    • Minimization of internal shrinkage in casting using synthesis of neural network
    • Tiwari MK, Roy D (2002) Minimization of internal shrinkage in casting using synthesis of neural network. Int J Smart Eng Syst Des 4:205-214
    • (2002) Int J Smart Eng Syst des , vol.4 , pp. 205-214
    • Tiwari, M.K.1    Roy, D.2
  • 22
    • 0026186620 scopus 로고
    • Dynamic rules for due-date assignment
    • 7
    • Vig MM, Dooley KJ (1991) Dynamic rules for due-date assignment. Int J Prod Res 29(7):1361-1377
    • (1991) Int J Prod Res , vol.29 , pp. 1361-1377
    • Vig, M.M.1    Dooley, K.J.2
  • 23
    • 0026943536 scopus 로고
    • Generating fuzzy rules by learning from examples
    • 6
    • Wang L-X, Mendel JM (1992) Generating fuzzy rules by learning from examples. IEEE Trans Syst, Man, Cybern 22(6):1414-1427
    • (1992) IEEE Trans Syst, Man, Cybern , vol.22 , pp. 1414-1427
    • Wang, L.-X.1    Mendel, J.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.