-
1
-
-
0032074551
-
The impact of priority rule combinations on lateness and tardiness
-
Barman S (1998) The impact of priority rule combinations on lateness and tardiness. IIE Transactions 30:495-504
-
(1998)
IIE Transactions
, vol.30
, pp. 495-504
-
-
Barman, S.1
-
2
-
-
1942535802
-
A neural network approach to process assignment in multiprocessor systems based on the execution time
-
Chennai, India
-
Chandiramani V, Jayaseelan R, Nathan VSL, Priya KS (2004) A neural network approach to process assignment in multiprocessor systems based on the execution time. Proceedings of International Conference on Intelligent Sensing and Information Processing (ICISIP 2004), Chennai, India:332-335
-
(2004)
Proceedings of International Conference on Intelligent Sensing and Information Processing (ICISIP 2004)
, pp. 332-335
-
-
Chandiramani, V.1
Jayaseelan, R.2
Vsl, N.3
Priya, K.S.4
-
3
-
-
33846682959
-
A hybrid regulation system by evolving CBR with GA for a twin laser measuring system
-
DOI 10.1007/s00170-005-0286-4
-
Chang P-C, Chen LY (2006) A hybrid regulation system by evolving CBR with GA for a twin laser measuring system. International Journal of Advanced Manufacturing Technology, DOI 10.1007/s00170-005-0286-4
-
(2006)
International Journal of Advanced Manufacturing Technology
-
-
Chang, P.-C.1
Chen, L.Y.2
-
4
-
-
0037546939
-
A neural networks approach for due-date assignment in a wafer fabrication factory
-
1
-
Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55-61
-
(2003)
Int J Ind Eng
, vol.10
, pp. 55-61
-
-
Chang, P.-C.1
Hsieh, J.-C.2
-
5
-
-
67749133834
-
A case-based reasoning approach for due date assignment in a wafer fabrication factory
-
Vancouver, British Columbia, Canada
-
Chang P-C, Hsieh J-C, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, British Columbia, Canada
-
(2001)
Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001)
-
-
Chang, P.-C.1
Hsieh, J.-C.2
Liao, T.W.3
-
6
-
-
23044463387
-
Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
-
Chang P-C, Hsieh J-C, Liao TW (2005) Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. J Intell Manuf 16:549-557
-
(2005)
J Intell Manuf
, vol.16
, pp. 549-557
-
-
Chang, P.-C.1
Hsieh, J.-C.2
Liao, T.W.3
-
7
-
-
30344446393
-
Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory
-
Chang P-C, Liao TW (2006) Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6:198-206
-
(2006)
Appl Soft Comput
, vol.6
, pp. 198-206
-
-
Chang, P.-C.1
Liao, T.W.2
-
8
-
-
33750462377
-
A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry
-
DOI 10.1016/j.dss.2006.02.014
-
Chang P-C, Liu CH, Wang YW (2006) A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry. Decision Support Systems DOI 10.1016/j.dss.2006.02.014
-
(2006)
Decision Support Systems
-
-
Chang, P.-C.1
Ch, L.2
Wang, Y.W.3
-
9
-
-
15844419035
-
A fuzzy back propagation network for output time prediction in a wafer fab
-
Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2/3F:211-222
-
(2003)
Appl Soft Comput
, vol.23
, pp. 211-222
-
-
Chen, T.1
-
10
-
-
53549088386
-
A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation
-
Chen T (2006) A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. Int J Adv Manuf Technol (in press)
-
(2006)
Int J Adv Manuf Technol (In Press)
-
-
Chen, T.1
-
11
-
-
33750566327
-
A hybrid SOM-BPN approach to lot output time prediction in a wafer fab
-
DOI 10.1007/s11063-006-9027-4
-
Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Processing Letters DOI 10.1007/s11063-006-9027-4
-
(2006)
Neural Processing Letters
-
-
Chen, T.1
-
12
-
-
33750718776
-
A look-ahead fuzzy back propagation network for lot output time series prediction in a wafer fab
-
Chen T (2006) A look-ahead fuzzy back propagation network for lot output time series prediction in a wafer fab. Lect Notes in Comput Sci 4234:974-982
-
(2006)
Lect Notes in Comput Sci
, vol.4234
, pp. 974-982
-
-
Chen, T.1
-
13
-
-
43449121772
-
An intelligent hybrid system for wafer lot output time prediction
-
Chen T (2006) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Infor (in press)
-
(2006)
Adv Eng Infor (In Press)
-
-
Chen, T.1
-
14
-
-
0037118177
-
A survey of the state-of-the-art of common due date assignment and scheduling research
-
Gordon V, Proth J-M, Chu C (2002) A survey of the state-of-the-art of common due date assignment and scheduling research. Eur J Oper Res 139:1-25
-
(2002)
Eur J Oper Res
, vol.139
, pp. 1-25
-
-
Gordon, V.1
Proth, J.-M.2
Chu, C.3
-
15
-
-
2942642529
-
Due date assignment in wafer fabrication using artificial neural network
-
9-10
-
Hsu SY, Sha DY (2004) Due date assignment in wafer fabrication using artificial neural network. Int J Adv Manuf Technol 23(9-10):768-775
-
(2004)
Int J Adv Manuf Technol
, vol.23
, pp. 768-775
-
-
Hsu, S.Y.1
Sha, D.Y.2
-
17
-
-
0002197262
-
Distributed representation of fuzzy rules and its application to pattern classification
-
1
-
Ishibuchi H, Nozaki K, Tanaka H (1992) Distributed representation of fuzzy rules and its application to pattern classification. Fuzzy Sets Sys 52(1):21-32
-
(1992)
Fuzzy Sets Sys
, vol.52
, pp. 21-32
-
-
Ishibuchi, H.1
Nozaki, K.2
Tanaka, H.3
-
18
-
-
10844279814
-
SOM ensemble-based image segmentation
-
Jiang Y, Zhou ZH (2004) SOM ensemble-based image segmentation. Neural Process Let 20:171-178
-
(2004)
Neural Process Let
, vol.20
, pp. 171-178
-
-
Jiang, Y.1
Zhou, Z.H.2
-
20
-
-
0000861722
-
A proof of the queueing formula L = ë W
-
Little JDC (1961) A proof of the queueing formula L = ë W. Oper Res 9:383-387
-
(1961)
Oper Res
, vol.9
, pp. 383-387
-
-
Little, J.D.C.1
-
21
-
-
0036649442
-
Minimization of internal shrinkage in casting using synthesis of neural network
-
Tiwari MK, Roy D (2002) Minimization of internal shrinkage in casting using synthesis of neural network. Int J Smart Eng Syst Des 4:205-214
-
(2002)
Int J Smart Eng Syst des
, vol.4
, pp. 205-214
-
-
Tiwari, M.K.1
Roy, D.2
-
22
-
-
0026186620
-
Dynamic rules for due-date assignment
-
7
-
Vig MM, Dooley KJ (1991) Dynamic rules for due-date assignment. Int J Prod Res 29(7):1361-1377
-
(1991)
Int J Prod Res
, vol.29
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
23
-
-
0026943536
-
Generating fuzzy rules by learning from examples
-
6
-
Wang L-X, Mendel JM (1992) Generating fuzzy rules by learning from examples. IEEE Trans Syst, Man, Cybern 22(6):1414-1427
-
(1992)
IEEE Trans Syst, Man, Cybern
, vol.22
, pp. 1414-1427
-
-
Wang, L.-X.1
Mendel, J.M.2
|