메뉴 건너뛰기




Volumn 8, Issue 2, 1999, Pages 151-162

Demand management: The evaluation of price and due date negotiation strategies using simulation

Author keywords

Demand management; Due dates

Indexed keywords


EID: 0000006895     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.1999.tb00367.x     Document Type: Article
Times cited : (29)

References (19)
  • 2
    • 0011788714 scopus 로고
    • Network dispatching by the shortest-operation discipline
    • _ AND _ (1962), "Network Dispatching by the Shortest-Operation Discipline," Operations Research, 10, 1, 51-73.
    • (1962) Operations Research , vol.10 , Issue.1 , pp. 51-73
  • 4
    • 0000464243 scopus 로고
    • Grouping observations in digital simulation
    • FISHMAN, G. S. (1978), "Grouping Observations in Digital Simulation," Management Science, 24, 5, 510-521.
    • (1978) Management Science , vol.24 , Issue.5 , pp. 510-521
    • Fishman, G.S.1
  • 5
    • 0004239346 scopus 로고
    • An empirical analysis of job shop dispatch rule selection
    • GREEN, G. I. AND L. B. APPEL (1981), "An Empirical Analysis of Job Shop Dispatch Rule Selection," Journal of Operations Management, 1, 4, 197-203.
    • (1981) Journal of Operations Management , vol.1 , Issue.4 , pp. 197-203
    • Green, G.I.1    Appel, L.B.2
  • 6
    • 0000870914 scopus 로고
    • A review of scheduling in smaller manufacturing companies in the UK
    • HALSALL, D. N., A. P. MUHLEMANN, AND D. H. R. PRICE (1990), "A Review of Scheduling in Smaller Manufacturing Companies in the UK," Production Planning and Control, 5, 5, 485-493.
    • (1990) Production Planning and Control , vol.5 , Issue.5 , pp. 485-493
    • Halsall, D.N.1    Muhlemann, A.P.2    Price, D.H.R.3
  • 8
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • _, I. P. TATSIOPOULOS, AND L. C. HENDRY (1989), "A Structural Methodology for Managing Manufacturing Lead Times in Make-to-Order Companies," European Journal of Operational Research, 40, 196-209.
    • (1989) European Journal of Operational Research , vol.40 , pp. 196-209
    • Tatsiopoulos, I.P.1    Hendry, L.C.2
  • 10
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • MCKAY, K. N., F. R. SAFAYENI, AND J. A. BUZACOTT (1988), "Job-Shop Scheduling Theory: What is Relevant?," Interfaces, 18, 4, 84-90.
    • (1988) Interfaces , vol.18 , Issue.4 , pp. 84-90
    • Mckay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 11
    • 0004259310 scopus 로고
    • Belknip Press of Harvard University Press, Cambridge, MA
    • RAIFFA, H. (1982), The Art and Science of Negotiation, Belknip Press of Harvard University Press, Cambridge, MA.
    • (1982) The Art and Science of Negotiation
    • Raiffa, H.1
  • 12
    • 0002436155 scopus 로고
    • On-line simulation for real-time scheduling of manufacturing systems
    • ROGERS, P. AND M. T. FLANAGAN (1991), "On-line Simulation for Real-time Scheduling of Manufacturing Systems," Industrial Engineering, 23, 12, 37-40.
    • (1991) Industrial Engineering , vol.23 , Issue.12 , pp. 37-40
    • Rogers, P.1    Flanagan, M.T.2
  • 14
    • 0030386130 scopus 로고    scopus 로고
    • Integrating the planning and scheduling systems in a job shop
    • SALEGNA, G. (1996), "Integrating the Planning and Scheduling Systems in a Job Shop," Production and Inventory Management Journal, 37, 4, 1-7.
    • (1996) Production and Inventory Management Journal , vol.37 , Issue.4 , pp. 1-7
    • Salegna, G.1
  • 17
  • 19
    • 0029260612 scopus 로고
    • A survey of U.S. Manufacturing practices in make-to-order machine shops
    • WISNER, J. D. AND S. P. SIFERD (1995), "A Survey of U.S. Manufacturing Practices in Make-to-Order Machine Shops," Production and Inventory Management Journal, 36, 1, 1-7.
    • (1995) Production and Inventory Management Journal , vol.36 , Issue.1 , pp. 1-7
    • Wisner, J.D.1    Siferd, S.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.