메뉴 건너뛰기




Volumn 138, Issue 5, 2012, Pages 585-593

Design error costs in construction projects

Author keywords

Construction costs; Design; Errors; Procurement

Indexed keywords

ACTUAL COST; BUILDING INFORMATION MODELLING; CONSTRUCTION COSTS; CONSTRUCTION PROJECTS; CONTRACT VALUES; DESIGN ERRORS; DIRECT AND INDIRECT COSTS; GOVERNMENT REPORTS; LOSS OF LIFE; PROCUREMENT; PROCUREMENT METHODS; PROJECT PERFORMANCE; QUESTIONNAIRE SURVEYS;

EID: 84862065021     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000454     Document Type: Article
Times cited : (105)

References (37)
  • 1
    • 0037985358 scopus 로고    scopus 로고
    • Representing causal mechanism of defective designs: A system approach considering human errors
    • DOI 10.1080/0144619032000056135
    • Andi, A., and Minato, T. (2003 a). Representing causal mechanism of defective designs: A system approach considering human errors.. Constr. Manage. Econ. 0144-6193, 21 (3), 297-305. 10.1080/0144619032000056135 (Pubitemid 36650333)
    • (2003) Construction Management and Economics , vol.21 , Issue.3 , pp. 297-305
    • Andi, A.1    Minato, T.2
  • 2
    • 0141988807 scopus 로고    scopus 로고
    • Design documents quality in the Japanese construction industry: Factors influencing and impacts on construction process
    • DOI 10.1016/S0263-7863(02)00083-2
    • Andi, A., and Minato, T. (2003 b). Design documents in the Japanese construction industry: Factors influencing and impacts on construction process.. Int. J. Proj. Manage. IPMAEL 0263-7863, 21 (7), 537-546. 10.1016/S0263-7863(02) 00083-2 (Pubitemid 37257103)
    • (2003) International Journal of Project Management , vol.21 , Issue.7 , pp. 537-546
    • Andi, A.1    Minato, T.2
  • 3
    • 1842842998 scopus 로고    scopus 로고
    • Representing causal mechanism of defective designs: Exploration through case studies
    • DOI 10.1080/0144619042000201385
    • Andi, A., and Minato, T. (2004). Representing causal mechanism of defective designs: Exploration through case studies.. Constr. Manage. Econ. 0144-6193, 22 (2), 183-192. 10.1080/0144619042000201385 (Pubitemid 38485475)
    • (2004) Construction Management and Economics , vol.22 , Issue.2 , pp. 183-192
    • Andi, A.1    Minato, T.2
  • 4
    • 65249138727 scopus 로고    scopus 로고
    • Assessment of building failures in Nigeria: Lagos and Ibadan case study
    • AJSTCA 1607-9949
    • Ayininuola, G. M., and Olalusi, O. O. (2004). Assessment of building failures in Nigeria: Lagos and Ibadan case study.. African J. Sci. Tech. (AJST), 5 (1), 73-78 AJSTCA 1607-9949.
    • (2004) African J. Sci. Tech. (AJST) , vol.5 , Issue.1 , pp. 73-78
    • Ayininuola, G.M.1    Olalusi, O.O.2
  • 5
    • 0001326664 scopus 로고    scopus 로고
    • The cost of quality failures in major civil engineering projects
    • IJQMEZ 0265-671X. 10.1108/02656710010298544
    • Barber, P., Sheath, D., Tomkins, C., and Graves, A. (2000). The cost of quality failures in major civil engineering projects.. Int. J. Qual. Reliab. Manage., 17 (4/5), 479-492 IJQMEZ 0265-671X. 10.1108/02656710010298544
    • (2000) Int. J. Qual. Reliab. Manage. , vol.17 , Issue.4-5 , pp. 479-492
    • Barber, P.1    Sheath, D.2    Tomkins, C.3    Graves, A.4
  • 7
    • 0026837054 scopus 로고
    • Causes of quality deviations in design and construction
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1992)118:1(34)
    • Burati, J. L., and Farrington, J. J. (1992). Causes of quality deviations in design and construction.. J. Constr. Eng. Manage. JCEMD4 0733-9364, 118 (1), 34-49. 10.1061/(ASCE)0733-9364(1992)118:1(34)
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 34-49
    • Burati, J.L.1    Farrington, J.J.2
  • 8
    • 0035341601 scopus 로고    scopus 로고
    • Error and distributed cognition in design
    • DOI 10.1016/S0142-694X(00)00028-4
    • Busby, J. S. (2001). Error and distributed cognition in design.. Des. Stud. DSSTD5 1872-6909, 22 (3), 233-254. 10.1016/S0142-694X(00)00028-4 (Pubitemid 32265317)
    • (2001) Design Studies , vol.22 , Issue.3 , pp. 233-254
    • Busby, J.S.1
  • 9
    • 33746627742 scopus 로고    scopus 로고
    • Are construction disputes inevitable?
    • DOI 10.1109/TEM.2006.877445
    • Cheung, S. O., and Yiu, T. W. (2006). Are construction disputes inevitable? IEEE Trans. Eng. Manage. IEEMA4 0018-9391, 53 (3), 456-470. 10.1109/TEM.2006.877445 (Pubitemid 44149432)
    • (2006) IEEE Transactions on Engineering Management , vol.53 , Issue.3 , pp. 456-470
    • Cheung, S.O.1    Yiu, T.W.2
  • 10
    • 4143074659 scopus 로고
    • Implementation of ISO 9000 in construction
    • Standards Australia, Sydney, Australia
    • Cusack, D. (1992). Implementation of ISO 9000 in construction.. ISO 9000 Forum Symp., Standards Australia, Sydney, Australia.
    • (1992) ISO 9000 Forum Symp.
    • Cusack, D.1
  • 11
    • 75649112314 scopus 로고    scopus 로고
    • Charrettes as a method for engaging industry in best practices research
    • JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000079
    • Edward-Gibson, G., and Whittington, D. A. (2010). Charrettes as a method for engaging industry in best practices research.. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (1), 66-75. 10.1061/(ASCE)CO.1943-7862.0000079
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.1 , pp. 66-75
    • Edward-Gibson, G.1    Whittington, D.A.2
  • 13
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction: A study of seven building projects
    • AUCOES 0926-5805 10.1016/S0926-5805(98)00114-9
    • Josephson, P.-E., and Hammarlund, P. E. (1999). The causes and costs of defects in construction: A study of seven building projects.. Autom. Constr., 8 (6), 681-687. AUCOES 0926-5805 10.1016/S0926-5805(98)00114-9
    • (1999) Autom. Constr. , vol.8 , Issue.6 , pp. 681-687
    • Josephson, P.-E.1    Hammarlund, P.E.2
  • 14
    • 4143067931 scopus 로고    scopus 로고
    • Illustrative benchmarking rework and rework costs in Swedish construction industry
    • DOI 10.1061/(ASCE)0742-597X(2002)18:2(76)
    • Josephson, P.-E., Larsson, B., and Li, H. (2002). Illustrative benchmarking of rework and rework costs in swedish construction industry.. J. Manage. Eng. JMENEA 0742-597X, 18 (2), 76-83. 10.1061/(ASCE)0742-597X(2002)18: 2(76) (Pubitemid 40329148)
    • (2002) Journal of Management in Engineering , vol.18 , Issue.2 , pp. 76-83
    • Josephson, P.-E.1    Larsson, B.2    Li, H.3
  • 15
    • 75649120802 scopus 로고    scopus 로고
    • Implementing observational research methods to study team performance in construction management
    • JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000080
    • Leicht, R. M., Hunter, S. T., Saluja, C., and Messner, J. I. (2010). Implementing observational research methods to study team performance in construction management.. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (1), 76-86. 10.1061/(ASCE)CO.1943-7862.0000080
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.1 , pp. 76-86
    • Leicht, R.M.1    Hunter, S.T.2    Saluja, C.3    Messner, J.I.4
  • 16
    • 77955216122 scopus 로고    scopus 로고
    • Design error classification, causation and prevention for constructed facilities
    • JPCFEV 0887-3828, 10.1061/(ASCE)CF.1943-5509.0000116
    • Lopez, R., Love, P. E. D., Edwards, D. J., and Davis, P. R. (2010). Design error classification, causation and prevention for constructed facilities.. J. Perform. Constr. Facil. JPCFEV 0887-3828, 24 (4), 399-408. 10.1061/(ASCE)CF.1943-5509.0000116
    • (2010) J. Perform. Constr. Facil. , vol.24 , Issue.4 , pp. 399-408
    • Lopez, R.1    Love, P.E.D.2    Edwards, D.J.3    Davis, P.R.4
  • 17
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
    • Love, P. E. D. (2002). Influence of project type and procurement method on rework costs in building construction projects.. J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (1), 18-29. 10.1061/(ASCE)0733-9364(2002)128:1(18) (Pubitemid 40264891)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 18
    • 79960713839 scopus 로고    scopus 로고
    • Causal discovery and inference of project disputes
    • IEEMA4 0018-9391, 10.1109/TEM.2010.2048907
    • Love, P. E. D., Cheung, S. O., Irani, Z, and Davis, P. R. (2011 a). Causal discovery and inference of project disputes.. IEEE Trans. Eng. Manage. IEEMA4 0018-9391, 58 (3), 400-411. 10.1109/TEM.2010.2048907
    • (2011) IEEE Trans. Eng. Manage. , vol.58 , Issue.3 , pp. 400-411
    • Love, P.E.D.1    Cheung, S.O.2    Irani, Z.3    Davis, P.R.4
  • 19
    • 55249103649 scopus 로고    scopus 로고
    • Uncertainty avoidance: Public sector clients and procurement selection
    • 0951-3558 10.1108/09513550810904550
    • Love, P. E. D., Davis, P., Baccarini, D., and Edwards, D. (2008). Uncertainty avoidance: Public sector clients and procurement selection.. Int. J. Public Sector Manage., 21 (7), 753-776. 0951-3558 10.1108/09513550810904550
    • (2008) Int. J. Public Sector Manage. , vol.21 , Issue.7 , pp. 753-776
    • Love, P.E.D.1    Davis, P.2    Baccarini, D.3    Edwards, D.4
  • 20
    • 27944504058 scopus 로고    scopus 로고
    • Forensic project management: The underlying causes of rework in construction projects
    • DOI 10.1080/10286600412331295955, PII XG0Y761JXKWEY0PP
    • Love, P. E. D., and Edwards, D. (2004). Forensic project management: The underlying causes of rework in construction projects.. Civ. Environ. Eng. Syst., 21 (3), 207-228 1028-6608. 10.1080/10286600412331295955 (Pubitemid 44121663)
    • (2004) Civil Engineering and Environmental Systems , vol.21 , Issue.3 , pp. 207-228
    • Love, P.1    Edwards, D.J.2
  • 21
    • 80054926367 scopus 로고    scopus 로고
    • Design error reduction: Toward the effective utilization of building information modelling
    • REEDEC 1435-6066, 10.1007/s00163-011-0105-x
    • Love, P. E. D., Edwards, D. J., Han, S., and Goh, Y. M. (2011 b). Design error reduction: Toward the effective utilization of building information modelling.. Res. Eng. Des. REEDEC 1435-6066, 22 (3), 173-187. 10.1007/s00163-011-0105-x
    • (2011) Res. Eng. Des. , vol.22 , Issue.3 , pp. 173-187
    • Love, P.E.D.1    Edwards, D.J.2    Han, S.3    Goh, Y.M.4
  • 22
    • 84867839822 scopus 로고    scopus 로고
    • Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns
    • 10.1109/TEM.2011.2163628 IEEMA4 0018-9391 (in press)
    • Love, P. E. D, Edwards, D. J., and Irani, Z. (2011 c). Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns.. IEEE Trans. Eng. Manage., 10.1109/TEM.2011.2163628 IEEMA4 0018-9391 (in press).
    • (2011) IEEE Trans. Eng. Manage.
    • Love, P.E.1    Edwards, D.J.2    Irani, Z.3
  • 23
    • 68349117209 scopus 로고    scopus 로고
    • Project pathogens: The anatomy of omission errors in construction and engineering projects
    • IEEMA4 0018-9391. 10.1109/TEM.2008.927774
    • Love, P. E. D., Edwards, D. J., Irani, Z., and Walker, D. H. T. (2009). Project pathogens: The anatomy of omission errors in construction and engineering projects.. IEEE Transact. Eng. Manage., 56 (3), 425-435 IEEMA4 0018-9391. 10.1109/TEM.2008.927774
    • (2009) IEEE Transact. Eng. Manage. , vol.56 , Issue.3 , pp. 425-435
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3    Walker, D.H.T.4
  • 24
    • 0042131539 scopus 로고    scopus 로고
    • Project management quality cost information system for the construction industry
    • IMANDC 0378-7206 10.1016/S0378-7206(02)00094-0
    • Love, P. E. D., and Irani, Z. (2003). Project management quality cost information system for the construction industry.. Inf. Manage., 40 (7), 649-661. IMANDC 0378-7206 10.1016/S0378-7206(02)00094-0
    • (2003) Inf. Manage. , vol.40 , Issue.7 , pp. 649-661
    • Love, P.E.D.1    Irani, Z.2
  • 25
    • 14744282966 scopus 로고    scopus 로고
    • Role of error-recovery process in projects
    • DOI 10.1061/(ASCE)0742-597X(2004)20:2(70)
    • Love, P. E. D., and Josephson, P.-E. (2004). Role of the error-recovery process in projects.. J. Manage. Eng. JMENEA 0742-597X, 20 (2), 70-79. 10.1061/(ASCE)0742-597X(2004)20:2(70) (Pubitemid 40329304)
    • (2004) Journal of Management in Engineering , vol.20 , Issue.2 , pp. 70-79
    • Love, P.E.D.1    Josephson, P.-E.2
  • 26
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • 0144-6193, 10.1080/01446190050024897
    • Love, P. E. D., and Li, H. (2000). Quantifying the causes and costs of rework in construction.. Constr. Manage. Econ. 0144-6193, 18 (4), 479-490. 10.1080/01446190050024897
    • (2000) Constr. Manage. Econ. , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 27
    • 84861875486 scopus 로고    scopus 로고
    • Error begat error: Design error analysis and prevention in social infrastructure projects
    • 10.1016/j.aa2011.02.027 AAPVB5 0001-4575 (in press)
    • Love, P. E. D., Lopez, R., Edwards, D. J., and Goh, Y. (2011d d). Error begat error: Design error analysis and prevention in social infrastructure projects.. Accid. Anal. Prev., 10.1016/j.aap.2011.02.027 AAPVB5 0001-4575 (in press).
    • (2011) Accid. Anal. Prev.
    • Love, P.E.D.1    Lopez, R.2    Edwards, D.J.3    Goh, Y.4
  • 28
    • 0000611906 scopus 로고    scopus 로고
    • Selecting a suitable procurement method for a building project
    • Love, P. E. D., Skitmore, R. M., and Earl, G. (1998). Selecting a suitable procurement method for a building project.. Constr. Manage. Econ. 0144-6193, 16 (2), 221-233. 10.1080/014461998372501 (Pubitemid 128650964)
    • (1998) Construction Management and Economics , vol.16 , Issue.2 , pp. 221-233
    • Love, P.E.D.1    Skitmore, M.2    Earl, G.3
  • 29
    • 0000421913 scopus 로고    scopus 로고
    • A construction quality costs quantifying system for the building industry
    • 0265-671X 10.1108/02656719810198926
    • Low, S. P., and Yeo, H. K. C. (1998). A construction quality costs quantifying system for the building industry.. Int. J Qual. Reliab. Manage., 15 (3), 329-349. 0265-671X 10.1108/02656719810198926
    • (1998) Int. J Qual. Reliab. Manage. , vol.15 , Issue.3 , pp. 329-349
    • Low, S.P.1    Yeo, H.K.C.2
  • 32
    • 0343460839 scopus 로고
    • Paconius and the pedestal for Apollo: A case study of error in conceptual design
    • REEDEC 1435-6066, 10.1007/BF01581344
    • Petroski, H. (1991). Paconius and the pedestal for Apollo: A case study of error in conceptual design.. Res. Eng. Des. REEDEC 1435-6066, 3 (2), 123-128. 10.1007/BF01581344
    • (1991) Res. Eng. Des. , vol.3 , Issue.2 , pp. 123-128
    • Petroski, H.1
  • 33
    • 77951663483 scopus 로고    scopus 로고
    • Comparative performance of PPPs and traditional procurement in Australia
    • 0144-6193, 10.1080/01446190903582731
    • Raisbeck, P., Duffied, C., and Xu, M. (2010). Comparative performance of PPPs and traditional procurement in Australia.. Constr. Manage. Econ. 0144-6193, 28 (4), 345-359. 10.1080/01446190903582731
    • (2010) Constr. Manage. Econ. , vol.28 , Issue.4 , pp. 345-359
    • Raisbeck, P.1    Duffied, C.2    Xu, M.3
  • 35
    • 84862098969 scopus 로고    scopus 로고
    • Manjula. Measuring and classifying construction rework: A pilot study, Dept. of Civil and Environmental Engineering, Construction Owners Association of Alberta, Alberta, Canada
    • Robinson-Fayek, A., Manjula Dissanayake, M., and Campero, O. (2003). Measuring and classifying construction rework: A pilot study, Dept. of Civil and Environmental Engineering, Construction Owners Association of Alberta, Alberta, Canada.
    • (2003)
    • Robinson-Fayek, A.1    Dissanayake, M.2    Campero, O.3
  • 36
    • 67349175338 scopus 로고    scopus 로고
    • Taxonomy for change causes and effects in construction projects
    • IPMAEL 0263-7863 10.1016/j.ijproman.2008.10.005
    • Sun, M., and Meng, X. (2009). Taxonomy for change causes and effects in construction projects.. Int. J. Proj. Manage., 27 (6), 560-572. IPMAEL 0263-7863 10.1016/j.ijproman.2008.10.005
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.6 , pp. 560-572
    • Sun, M.1    Meng, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.