메뉴 건너뛰기




Volumn 59, Issue 4, 2012, Pages 560-571

Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns

Author keywords

Design errors; overruns; pathogens; social infrastructure

Indexed keywords

COST AND SCHEDULE; DESIGN ERRORS; ECONOMIC INFRASTRUCTURE; INFRASTRUCTURE PROJECT; OPTIMISM BIAS; OVERRUNS; PROJECT COST; SOCIAL INFRASTRUCTURE; SOCIAL INFRASTRUCTURE PROJECTS;

EID: 84867839822     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2011.2163628     Document Type: Article
Times cited : (105)

References (42)
  • 1
    • 0141988807 scopus 로고    scopus 로고
    • Design documents quality in the Japanese construction industry: Factors influencing and impacts on construction process
    • DOI 10.1016/S0263-7863(02)00083-2
    • S. Andi and T. Minato, "Design document quality in the Japanese construction industry: Factors influencing and impacts on the construction process," Int. J. Project Manage., vol. 21, pp. 537-546, 2003. (Pubitemid 37257103)
    • (2003) International Journal of Project Management , vol.21 , Issue.7 , pp. 537-546
    • Andi, S.1    Minato, T.2
  • 3
    • 38349088613 scopus 로고    scopus 로고
    • Natural events
    • J. Bell, "Natural events," J. Artif. Intell. Res., vol. 30, pp. 361-412, 2007.
    • (2007) J. Artif. Intell. Res. , vol.30 , pp. 361-412
    • Bell, J.1
  • 4
    • 1942530583 scopus 로고    scopus 로고
    • Projects, pathogens, and incubation periods
    • J. S. Busby and E. J. Hughes, "Projects, pathogens, and incubation periods," Int. J. Project Manage., vol. 22, pp. 425-434, 2004.
    • (2004) Int. J. Project Manage. , vol.22 , pp. 425-434
    • Busby, J.S.1    Hughes, E.J.2
  • 5
    • 33746627742 scopus 로고    scopus 로고
    • Are construction disputes inevitable?
    • DOI 10.1109/TEM.2006.877445
    • S. O. Cheung and T. W. Yiu, "Are construction disputes inevitable?," IEEE Trans. Eng. Manage., vol. 53, no. 3, pp. 456-470, Aug. 2006. (Pubitemid 44149432)
    • (2006) IEEE Transactions on Engineering Management , vol.53 , Issue.3 , pp. 456-470
    • Cheung, S.O.1    Yiu, T.W.2
  • 7
    • 3342896142 scopus 로고    scopus 로고
    • European Commission. European Commission. [Online]. Available: last accessed May 15, 2010
    • European Commission. (2003). Guidelines for Successful Public-Private Partnerships. European Commission. [Online]. Available: http://ec.europa.eu/ regional-policy (last accessed May 15, 2010).
    • (2003) Guidelines for Successful Public-Private Partnerships.
  • 8
    • 0442328937 scopus 로고    scopus 로고
    • What causes cost overrun in transport infrastructure projects?
    • DOI 10.1080/0144164032000080494
    • B. Flyvbjerg, M. K. Skamris, and S. L. Buhl, "What causes cost overrun in transport infrastructure projects?," Transp. Rev., vol. 24, no. 1, pp. 3-18, 2004. (Pubitemid 38187880)
    • (2004) Transport Reviews , vol.24 , Issue.1 , pp. 3-18
    • Flyvbjerg, B.1    Skamris Holm, M.K.2    Buhl, S.L.3
  • 10
    • 33645708913 scopus 로고    scopus 로고
    • Five misunderstandings about case-study research
    • DOI 10.1177/1077800405284363
    • B. Flyvbjerg, "Five misunderstandings about case-study research," Qualitative Inquiry, vol. 12, no. 2, pp. 219-245, 2006. (Pubitemid 43538853)
    • (2006) Qualitative Inquiry , vol.12 , Issue.2 , pp. 219-245
    • Flyvbjerg, B.1
  • 11
    • 37549021864 scopus 로고    scopus 로고
    • Curbing optimism and strategic misrepresentation in planning: Reference class forecasting in practice
    • B. Flyvbjerg, "Curbing optimism and strategic misrepresentation in planning: Reference class forecasting in practice," Eur. Planning Stud., vol. 16, no. 1, pp. 1-21, 2008.
    • (2008) Eur. Planning Stud. , vol.16 , Issue.1 , pp. 1-21
    • Flyvbjerg, B.1
  • 12
    • 65249165995 scopus 로고    scopus 로고
    • Delusion and deception in large infrastructure projects: Two models for explaining and preventing executive disaster
    • B. Flyvbjerg, M. Garbuio, and D. Lovallo, "Delusion and deception in large infrastructure projects: Two models for explaining and preventing executive disaster," California Manage. Rev., vol. 51, no. 2, pp. 170-193, 2009.
    • (2009) California Manage. Rev. , vol.51 , Issue.2 , pp. 170-193
    • Flyvbjerg, B.1    Garbuio, M.2    Lovallo, D.3
  • 13
    • 0035452552 scopus 로고    scopus 로고
    • Design for manufacture: A strategy for successful application to buildings
    • DOI 10.1080/01446190110044861
    • S. Fox, L. Marsh, and G. Cockerham, "Design for manufacture: A strategy for successful application to buildings," Construct. Manage. Econ., vol. 19, no. 5, pp. 493-502, 2001. (Pubitemid 32635990)
    • (2001) Construction Management and Economics , vol.19 , Issue.5 , pp. 493-502
    • Fox, S.1    Marsh, L.2    Cockerham, G.3
  • 14
    • 3843127302 scopus 로고    scopus 로고
    • The intransitivity of causation revealed in equations and graphs
    • C. Hitchcock, "The intransitivity of causation revealed in equations and graphs," J. Philosophy, vol. 98, pp. 273-299, 2001.
    • (2001) J. Philosophy , vol.98 , pp. 273-299
    • Hitchcock, C.1
  • 17
    • 65249137645 scopus 로고    scopus 로고
    • Towards a comprehensive understanding of public private partnerships for infrastructure development
    • Y. H. Kwak, Y. Y. Chih, and C. W. Ibbs, "Towards a comprehensive understanding of public private partnerships for infrastructure development," California Manage. Rev., vol. 51, no. 2, pp. 51-78, 2009.
    • (2009) California Manage. Rev. , vol.51 , Issue.2 , pp. 51-78
    • Kwak, Y.H.1    Chih, Y.Y.2    Ibbs, C.W.3
  • 18
    • 0001122210 scopus 로고
    • Causation
    • D. Lewis, "Causation," J. Philosophy, vol. 60, pp. 17-25, 1973.
    • (1973) J. Philosophy , vol.60 , pp. 17-25
    • Lewis, D.1
  • 19
    • 85007012838 scopus 로고    scopus 로고
    • Contract documentation quality and rework in Australian projects
    • P. E. D. Love, D. Edwards, and J. Smith, "Contract documentation quality and rework in Australian projects," J. Architectural Eng. Design Manage., vol. 1, pp. 247-259, 2006.
    • (2006) J. Architectural Eng. Design Manage. , vol.1 , pp. 247-259
    • Love, P.E.D.1    Edwards, D.2    Smith, J.3
  • 20
    • 55249103649 scopus 로고    scopus 로고
    • Uncertainty avoidance: Public sector clients and procurement selection
    • P. E. D. Love, P. Davis, D. Baccarini, and D. Edwards, "Uncertainty avoidance: Public sector clients and procurement selection," Int. J. Public Sector Manage., vol. 21, no. 7, pp. 753-776, 2008.
    • (2008) Int. J. Public Sector Manage. , vol.21 , Issue.7 , pp. 753-776
    • Love, P.E.D.1    Davis, P.2    Baccarini, D.3    Edwards, D.4
  • 21
    • 43749116883 scopus 로고    scopus 로고
    • Forensic project management: An exploratory examination of the causal behaviour of design-induced error
    • May
    • P. E. D. Love, D. J. Edwards, and Z. Irani, "Forensic project management: An exploratory examination of the causal behaviour of design-induced error," IEEE Trans. Eng. Manage., vol. 55, no. 2, pp. 234-248, May 2008.
    • (2008) IEEE Trans. Eng. Manage. , vol.55 , Issue.2 , pp. 234-248
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3
  • 22
    • 70450206280 scopus 로고    scopus 로고
    • Congruence or divergence? A path model of rework in building and civil engineering projects
    • P. E. D. Love, D. J. Edwards, J. Smith, and D. H. T. Walker, "Congruence or divergence? A path model of rework in building and civil engineering projects," ASCE J. Perform. Construct. Facilities, vol. 23, no. 6, pp. 480-488, 2009.
    • (2009) ASCE J. Perform. Construct. Facilities , vol.23 , Issue.6 , pp. 480-488
    • Love, P.E.D.1    Edwards, D.J.2    Smith, J.3    Walker, D.H.T.4
  • 23
    • 68349117209 scopus 로고    scopus 로고
    • Project pathogens: The anatomy of omission errors in construction and resource engineering projects
    • Aug
    • P. E. D. Love, D. J. Edwards, Z. Irani, and D. H. T. Walker, "Project pathogens: The anatomy of omission errors in construction and resource engineering projects," IEEE Trans. Eng. Manage., vol. 56, no. 3, pp. 425-435, Aug. 2009.
    • (2009) IEEE Trans. Eng. Manage. , vol.56 , Issue.3 , pp. 425-435
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3    Walker, D.H.T.4
  • 25
    • 0035400029 scopus 로고    scopus 로고
    • Productivity oriented analysis of design revisions
    • DOI 10.1080/01446190010017141
    • M. R. Manavazhi and Z. Xunzhi, "Productivity oriented analysis of design revisions," Construct. Manage. Econ., vol. 19, no. 4, pp. 379-391, 2001. (Pubitemid 32548456)
    • (2001) Construction Management and Economics , vol.19 , Issue.4 , pp. 379-391
    • Manavazhi, M.R.1    Xunshi, Z.2
  • 26
    • 77956917233 scopus 로고    scopus 로고
    • Road tunnels construction cost estimation: A structural equation model development and comparison
    • K. Petroutsatou and S. Lambropoulos, "Road tunnels construction cost estimation: A structural equation model development and comparison," Oper. Res., vol. 10, no. 2, pp. 163-173, 2009.
    • (2009) Oper. Res. , vol.10 , Issue.2 , pp. 163-173
    • Petroutsatou, K.1    Lambropoulos, S.2
  • 27
    • 85011453113 scopus 로고    scopus 로고
    • Responding to marginalisation
    • C. Powell, "Responding to marginalisation," Architectural Res. Quart., vol. 2, pp. 84-89, 1997.
    • (1997) Architectural Res. Quart. , vol.2 , pp. 84-89
    • Powell, C.1
  • 29
    • 77951663483 scopus 로고    scopus 로고
    • Comparative performance of PPPs and traditional procurement in Australia
    • P. Raisbeck, C. Duffied, and M. Xu, "Comparative performance of PPPs and traditional procurement in Australia," Construct. Manage. Econ., vol. 28, pp. 345-359, 2010.
    • (2010) Construct. Manage. Econ. , vol.28 , pp. 345-359
    • Raisbeck, P.1    Duffied, C.2    Xu, M.3
  • 30
    • 0034681819 scopus 로고    scopus 로고
    • Human error: Models and management
    • J. T. Reason, "Human error: Models and management," Brit. Med. J., vol. 320, no. 7237, pp. 768-770, 2000.
    • (2000) Brit. Med. J. , vol.320 , Issue.7237 , pp. 768-770
    • Reason, J.T.1
  • 32
    • 0032048057 scopus 로고    scopus 로고
    • Quality, waste, and cost consideration in architectural building design management
    • G. Rounce, "Quality, waste, and cost consideration in architectural building design management," Int. J. Project Manage., vol. 16, no. 2, pp. 123-127, 1998.
    • (1998) Int. J. Project Manage. , vol.16 , Issue.2 , pp. 123-127
    • Rounce, G.1
  • 35
    • 0000331042 scopus 로고
    • An investigation into construction time performance
    • D. H. T. Walker, "An investigation into construction time performance," Construct. Manage. Econ., vol. 13, no. 3, pp. 265-274, 1995.
    • (1995) Construct. Manage. Econ. , vol.13 , Issue.3 , pp. 265-274
    • Walker, D.H.T.1
  • 36
    • 84874623325 scopus 로고    scopus 로고
    • Western Australian Auditor General's Report May 15
    • Western Australian Auditor General's Report. (2010, May 15). The Planning and Management of Perth Arena. [Online]. Available: www.audit.wa.gov.au.
    • (2010) The Planning and Management of Perth Arena
  • 37
    • 85025235881 scopus 로고
    • Managing the knowledge based organization: The case of architectural practice
    • G. M. Winch and E. Scheider, "Managing the knowledge based organization: The case of architectural practice," J. Manage. Stud., vol. 30, no. 6, pp. 923-937, 1993.
    • (1993) J. Manage. Stud. , vol.30 , Issue.6 , pp. 923-937
    • Winch, G.M.1    Scheider, E.2
  • 38
    • 0042965167 scopus 로고
    • The strategic management of architectural practice
    • G. M. Winch and E. Scheider, "The strategic management of architectural practice," Construct. Manage. Econ., vol. 11, pp. 467-473, 1993.
    • (1993) Construct. Manage. Econ. , vol.11 , pp. 467-473
    • Winch, G.M.1    Scheider, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.