메뉴 건너뛰기




Volumn 53, Issue 3, 2006, Pages 456-470

Are construction disputes inevitable?

Author keywords

Construction disputes; Fault tree model

Indexed keywords

CONTRACTS; FAULT TREE ANALYSIS; PLANNING; PROJECT MANAGEMENT; SYSTEMS ANALYSIS;

EID: 33746627742     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2006.877445     Document Type: Article
Times cited : (140)

References (74)
  • 3
    • 11744344223 scopus 로고
    • "How constructive is construction law?"
    • S. Rhys Jones, "How constructive is construction law?," Construction Law J., vol. 10, no. 1, pp. 28-38, 1994.
    • (1994) Construction Law J. , vol.10 , Issue.1 , pp. 28-38
    • Rhys Jones, S.1
  • 4
    • 33746582384 scopus 로고
    • "Anatomy of a dispute"
    • Nov
    • N. Mururu, "Anatomy of a dispute," Arbitration, pp. 262-264, Nov. 1991.
    • (1991) Arbitration , pp. 262-264
    • Mururu, N.1
  • 7
    • 0027069097 scopus 로고
    • "Dispute resolution: Managing construction conflict with step negotiations"
    • J. R. Spittler and G. H. Jentzen, "Dispute resolution: Managing construction conflict with step negotiations," AACE Int. Trans., pp. D.9. 1-D.9.10, 1992.
    • (1992) AACE Int. Trans.
    • Spittler, J.R.1    Jentzen, G.H.2
  • 11
    • 2142755127 scopus 로고    scopus 로고
    • "Conflict and dispute in construction"
    • P. Fenn, D. Lowe, and C. Speck, "Conflict and dispute in construction," Construction Manag. Econ., vol. 15, no. 6, pp. 513-518, 1997.
    • (1997) Construction Manag. Econ. , vol.15 , Issue.6 , pp. 513-518
    • Fenn, P.1    Lowe, D.2    Speck, C.3
  • 13
    • 9144223598 scopus 로고
    • "The new CCDC2: Facilitating dispute resolution of construction projects"
    • D. Bristow and R. Vasilopoulos, "The new CCDC2: Facilitating dispute resolution of construction projects," Construction Law J., vol. 11, no. 2, pp. 95-117, 1995.
    • (1995) Construction Law J. , vol.11 , Issue.2 , pp. 95-117
    • Bristow, D.1    Vasilopoulos, R.2
  • 14
    • 12444288355 scopus 로고    scopus 로고
    • "Claims and disputes in construction"
    • J. Sykes, "Claims and disputes in construction," Construction Law J., vol. 12, no. 1, pp. 3-13, 1996.
    • (1996) Construction Law J. , vol.12 , Issue.1 , pp. 3-13
    • Sykes, J.1
  • 16
    • 0027235252 scopus 로고
    • "Review of Australian building disputes settled by litigation"
    • V. M. Watts and J. C. Scrivener, "Review of Australian building disputes settled by litigation," Building Res. Inf., vol. 21, no. 1, pp. 59-63, 1993.
    • (1993) Building Res. Inf. , vol.21 , Issue.1 , pp. 59-63
    • Watts, V.M.1    Scrivener, J.C.2
  • 17
    • 78049507338 scopus 로고
    • "The nature and origin of conflict within the construction process"
    • B. C. Heath, B. Hills, and M. Berry, "The nature and origin of conflict within the construction process," in Proc. CIB TG15 Conf., 1994, pp. 35-48.
    • (1994) Proc. CIB TG15 Conf. , pp. 35-48
    • Heath, B.C.1    Hills, B.2    Berry, M.3
  • 19
    • 0007799737 scopus 로고    scopus 로고
    • "Common categories and causes of construction claims"
    • M. M. Kumaraswamy, "Common categories and causes of construction claims," Construction Law J., vol. 13, no. 1, pp. 21-34, 1997.
    • (1997) Construction Law J. , vol.13 , Issue.1 , pp. 21-34
    • Kumaraswamy, M.M.1
  • 20
    • 0345973927 scopus 로고
    • "Does the construction industry need alternative dispute resolution? The opinion of an engineer"
    • B. W. Totterdill, "Does the construction industry need alternative dispute resolution? The opinion of an engineer," Construction Law J., vol. 7, no. 3, pp. 189-199, 1991.
    • (1991) Construction Law J. , vol.7 , Issue.3 , pp. 189-199
    • Totterdill, B.W.1
  • 21
    • 0028754078 scopus 로고
    • "Construction claims and disputes: Cause and cost/time overruns"
    • C. Semple, F. Hartman, and G. Jergas, "Construction claims and disputes: Cause and cost/time overruns," J. Construction Eng. Manag., vol. 120, no. 4, pp. 785-795, 1994.
    • (1994) J. Construction Eng. Manag. , vol.120 , Issue.4 , pp. 785-795
    • Semple, C.1    Hartman, F.2    Jergas, G.3
  • 22
    • 12444288355 scopus 로고    scopus 로고
    • "Claims and disputes in construction"
    • P. Sheridan, "Claims and disputes in construction," Construction Law J., vol. 12, no. 1, pp. 3-13, 2003.
    • (2003) Construction Law J. , vol.12 , Issue.1 , pp. 3-13
    • Sheridan, P.1
  • 23
    • 33746610592 scopus 로고    scopus 로고
    • "Construction lawyers' attitudes and experience with ADR"
    • P. Brooker, "Construction lawyers' attitudes and experience with ADR," Construction Law J., vol. 18, no. 2, pp. 97-116, 2002.
    • (2002) Construction Law J. , vol.18 , Issue.2 , pp. 97-116
    • Brooker, P.1
  • 25
    • 0035334580 scopus 로고    scopus 로고
    • "Model for understanding, preventing and resolving project disputes"
    • P. Mitropoulos and G. Howell, "Model for understanding, preventing and resolving project disputes," J. Construction Eng. Manag., vol. 127, no. 3, pp. 223-231, 2001.
    • (2001) J. Construction Eng. Manag. , vol.127 , Issue.3 , pp. 223-231
    • Mitropoulos, P.1    Howell, G.2
  • 26
    • 0001470630 scopus 로고
    • "Transaction cost economics: The governance of contractual relations"
    • O. E. Williamson, "Transaction cost economics: The governance of contractual relations," J. Law Econ., vol. 56, pp. 73-104, 1979.
    • (1979) J. Law Econ. , vol.56 , pp. 73-104
    • Williamson, O.E.1
  • 27
    • 33746658114 scopus 로고
    • "Agreement & schedule of conditions of building contract for use in Hong Kong"
    • Hong Kong Institute of Architects
    • Hong Kong Institute of Architects, "Agreement & schedule of conditions of building contract for use in Hong Kong," Standard Form of Building Contract, Private Edition - With Quantities 1978.
    • (1978) Standard Form of Building Contract, Private Edition - With Quantities
  • 31
    • 84954639070 scopus 로고    scopus 로고
    • "Studying the client's role in construction management"
    • A. R. Cherns and D. T. Bryant, "Studying the client's role in construction management," Construction Manag. Econ., vol. 2, pp. 177-184.
    • Construction Manag. Econ. , vol.2 , pp. 177-184
    • Cherns, A.R.1    Bryant, D.T.2
  • 32
    • 0030125181 scopus 로고    scopus 로고
    • "Empowering the construction project team"
    • R. Newcombe, "Empowering the construction project team," Int. J. Project Manag., vol. 14, no. 2, pp. 75-80, 1996.
    • (1996) Int. J. Project Manag. , vol.14 , Issue.2 , pp. 75-80
    • Newcombe, R.1
  • 34
    • 0038243304 scopus 로고
    • "Project management: A study in organizational conflict"
    • A. G. Butler, "Project management: A study in organizational conflict," Acad. Manag. J., vol. 16, pp. 84-101, 1973.
    • (1973) Acad. Manag. J. , vol.16 , pp. 84-101
    • Butler, A.G.1
  • 35
    • 29744459918 scopus 로고
    • "Facing up to conflict in construction"
    • M. Smith, "Facing up to conflict in construction," in Proc. UMIST Conf., 1992, pp. 120-125.
    • (1992) Proc. UMIST Conf. , pp. 120-125
    • Smith, M.1
  • 38
    • 33746639656 scopus 로고    scopus 로고
    • "Encouraging conflicts, discouraging disputes and managing claims"
    • M. M. Kumaraswarmy and K. Yogeswaren, "Encouraging conflicts, discouraging disputes and managing claims," NICMAR J. Construction Manag., vol. 12, pp. 15-30, 1997.
    • (1997) NICMAR J. Construction Manag. , vol.12 , pp. 15-30
    • Kumaraswarmy, M.M.1    Yogeswaren, K.2
  • 39
    • 11744274659 scopus 로고    scopus 로고
    • "The relationship between construction procurement strategies and construction contract disputes"
    • in R. G. Taylor, Ed., Durban, South Africa
    • G. J. Conlin, D. A. Langford, and P. Kennedy, "The relationship between construction procurement strategies and construction contract disputes," in Proc. CIB W92 'North meet south' Procurement Systems Symp., R. G. Taylor, Ed., Durban, South Africa, 1996, pp. 66-82.
    • (1996) Proc. CIB W92 'North Meet South' Procurement Systems Symp. , pp. 66-82
    • Conlin, G.J.1    Langford, D.A.2    Kennedy, P.3
  • 40
    • 9144227996 scopus 로고    scopus 로고
    • "ADR in the construction industry: Continuing the development of a more efficient dispute resolution mechanism"
    • D. Max, "ADR in the construction industry: Continuing the development of a more efficient dispute resolution mechanism," Ohio State J. Dispute Resolution, vol. 12, p. 463, 1997.
    • (1997) Ohio State J. Dispute Resolution , vol.12 , pp. 463
    • Max, D.1
  • 41
    • 0032024157 scopus 로고    scopus 로고
    • "Predicting the outcome of construction litigation using neutral networks"
    • D. Arditi, F. E. Oksay, and O. B. Tokdemir, "Predicting the outcome of construction litigation using neutral networks," Comput.-Aided Civil Infrastructure Eng., vol. 13, pp. 75-81, 1998.
    • (1998) Comput.-Aided Civil Infrastructure Eng. , vol.13 , pp. 75-81
    • Arditi, D.1    Oksay, F.E.2    Tokdemir, O.B.3
  • 42
    • 9144235383 scopus 로고    scopus 로고
    • "Resolving construction disputes out of court through ADR"
    • R. H. Steen and R. J. McPherson, "Resolving construction disputes out of court through ADR," J. Property Manag., vol. 65, no. 5, 2000.
    • (2000) J. Property Manag. , vol.65 , Issue.5
    • Steen, R.H.1    McPherson, R.J.2
  • 43
    • 33746586578 scopus 로고
    • "Avoiding conflict by risk management - The role of the client's project manager"
    • in P. Fenn and R. Gameson, Eds
    • J. Lewis, D. W. Cheetham, and D. J. Carter, "Avoiding conflict by risk management - the role of the client's project manager," in Proc. 1st Int. Construction Manag. Technol., P. Fenn and R. Gameson, Eds., 1992, pp. 72-94.
    • (1992) Proc. 1st Int. Construction Manag. Technol. , pp. 72-94
    • Lewis, J.1    Cheetham, D.W.2    Carter, D.J.3
  • 44
    • 14744288445 scopus 로고    scopus 로고
    • "Conflicts between owner and contractors: Proposed intervention process"
    • K. M. Harmon, "Conflicts between owner and contractors: Proposed intervention process," J. Manag. Eng., vol. 19, no. 3, pp. 121-125.
    • J. Manag. Eng. , vol.19 , Issue.3 , pp. 121-125
    • Harmon, K.M.1
  • 45
    • 0036812938 scopus 로고    scopus 로고
    • "A multi-attribute utility model for dispute resolution strategy selection"
    • S. O. Cheung and C. H. Suen, "A multi-attribute utility model for dispute resolution strategy selection," Construction Manag. Econ., vol. 20, pp. 557-568, 2002.
    • (2002) Construction Manag. Econ. , vol.20 , pp. 557-568
    • Cheung, S.O.1    Suen, C.H.2
  • 46
    • 33746585739 scopus 로고    scopus 로고
    • "Construction claims and related disputed - A Malaysian perspective"
    • G. Xavier, "Construction claims and related disputed - a Malaysian perspective," Construction Law J., vol. 16, no. 3, pp. 172-186, 2000.
    • (2000) Construction Law J. , vol.16 , Issue.3 , pp. 172-186
    • Xavier, G.1
  • 48
    • 0029196052 scopus 로고
    • "Use of alternative dispute resolution in the construction industry"
    • Jan./Feb
    • T. B. Treacy, "Use of alternative dispute resolution in the construction industry," J. Manag. Eng., pp. 58-63, Jan./Feb. 1995.
    • (1995) J. Manag. Eng. , pp. 58-63
    • Treacy, T.B.1
  • 49
    • 33746581958 scopus 로고    scopus 로고
    • "Prevention is better than cure, or how to avoid costly mistakes in Hong Kong construction contracts"
    • Jul./Oct
    • J. A. Fisher, "Prevention is better than cure, or how to avoid costly mistakes in Hong Kong construction contracts," Int. Construction Law Rev., pp. 342-348, Jul./Oct.
    • Int. Construction Law Rev. , pp. 342-348
    • Fisher, J.A.1
  • 50
    • 33746630228 scopus 로고
    • "Avoidance and resolution of construction disputes-prior to and during the construction process"
    • R. H. Turner, "Avoidance and resolution of construction disputes-prior to and during the construction process," Int. Construction Law Rev., vol. 11, pp. 384-394, 1994.
    • (1994) Int. Construction Law Rev. , vol.11 , pp. 384-394
    • Turner, R.H.1
  • 51
    • 33746603121 scopus 로고
    • "Avoiding, managing and winning construction disputes"
    • O. A. Currie, "Avoiding, managing and winning construction disputes," Int. Construction Law Rev., vol. 8, no. 3, pp. 344-369, 1991.
    • (1991) Int. Construction Law Rev. , vol.8 , Issue.3 , pp. 344-369
    • Currie, O.A.1
  • 52
    • 0033988208 scopus 로고    scopus 로고
    • "Contractual methods for dispute avoidance and resolution (DAR)"
    • M. O. Jannadia, S. Assaf, A. A. Bubshait, and A. Naji, "Contractual methods for dispute avoidance and resolution (DAR)," Int. J. Project Manag., vol. 18, pp. 41-49, 2000.
    • (2000) Int. J. Project Manag. , vol.18 , pp. 41-49
    • Jannadia, M.O.1    Assaf, S.2    Bubshait, A.A.3    Naji, A.4
  • 53
    • 0025901620 scopus 로고
    • "Zero-based contracts for dispute avoidance"
    • L. S. Jones, "Zero-based contracts for dispute avoidance," in Proc. Construction Congr., 1991, pp. 710-714.
    • (1991) Proc. Construction Congr. , pp. 710-714
    • Jones, L.S.1
  • 54
    • 0027844904 scopus 로고
    • "Dispute avoidance and resolution for consulting engineers. American Society of Civil Engineers"
    • Vol. no. 43314
    • R. K. Allen, "Dispute avoidance and resolution for consulting engineers. American Society of Civil Engineers," Manuals and Reports on Engineering Practice 43314, pp. 1-81, 1993.
    • (1993) Manuals and Reports on Engineering Practice , pp. 1-81
    • Allen, R.K.1
  • 55
    • 14544307939 scopus 로고    scopus 로고
    • "The contribution of the third party neutral towards amicable construction dispute resolution"
    • S. O. Cheung and C. H. Suen, "The contribution of the third party neutral towards amicable construction dispute resolution," Int. Construction Law Rev., vol. 19, no. 1, pp. 79-86, 2002.
    • (2002) Int. Construction Law Rev. , vol.19 , Issue.1 , pp. 79-86
    • Cheung, S.O.1    Suen, C.H.2
  • 57
    • 33746589523 scopus 로고    scopus 로고
    • "Project dispute resolution satisfaction of construction clients in Hong Kong"
    • Ph.D. Thesis Univ. Wolverhampton, Wolverhampton, U.K
    • S. O. Cheung, "Project dispute resolution satisfaction of construction clients in Hong Kong," Ph.D. thesis, Univ. Wolverhampton, Wolverhampton, U.K., 1998.
    • (1998)
    • Cheung, S.O.1
  • 58
    • 84993110215 scopus 로고    scopus 로고
    • "Conflicts, claims and disputes in construction"
    • M. H. Kumaraswamy, "Conflicts, claims and disputes in construction," Eng., Construction, Architectural Manag., vol. 4, no. 2, pp. 95-111, 1997.
    • (1997) Eng., Construction, Architectural Manag. , vol.4 , Issue.2 , pp. 95-111
    • Kumaraswamy, M.H.1
  • 59
    • 0032071640 scopus 로고    scopus 로고
    • "Consequences of construction conflict: A Hong Kong perspective"
    • M. H. Kumaraswamy, "Consequences of construction conflict: A Hong Kong perspective," J. Manag. Eng., vol. 14, no. 3, pp. 66-74, 1998.
    • (1998) J. Manag. Eng. , vol.14 , Issue.3 , pp. 66-74
    • Kumaraswamy, M.H.1
  • 60
    • 0031680959 scopus 로고    scopus 로고
    • "Conflict in small and medium sized projects: Case of partnering to the rescue"
    • D. P. Gardiner and J. E. L. Simmons, "Conflict in small and medium sized projects: Case of partnering to the rescue," J. Manag. Eng., vol. 14, no. 1, pp. 35-40, 1998.
    • (1998) J. Manag. Eng. , vol.14 , Issue.1 , pp. 35-40
    • Gardiner, D.P.1    Simmons, J.E.L.2
  • 61
    • 0006565362 scopus 로고
    • "Conflict and individual coping behaviour in informal matrix organizations within the construction industry"
    • F. I. H. Pretorius and R. G. Taylor, "Conflict and individual coping behaviour in informal matrix organizations within the construction industry," Construction Manag. Econ., vol. 4, pp. 87-104, 1986.
    • (1986) Construction Manag. Econ. , vol.4 , pp. 87-104
    • Pretorius, F.I.H.1    Taylor, R.G.2
  • 64
    • 0020988170 scopus 로고
    • "Fault tree analysis by fuzzy probability"
    • Dec
    • H. Tanaka, L. T. Fan, F. S. Lai, and K. Toguchi, "Fault tree analysis by fuzzy probability," IEEE Trans. Reliability, vol. R-32, no. 5, pp. 455-457, Dec. 1983.
    • (1983) IEEE Trans. Reliability , vol.R-32 , Issue.5 , pp. 455-457
    • Tanaka, H.1    Fan, L.T.2    Lai, F.S.3    Toguchi, K.4
  • 65
    • 44949289937 scopus 로고
    • "Use of fuzzy set theory for level-I studies in probabilistic risk assessment"
    • K. B. Misra and G. G. Weber, "Use of fuzzy set theory for level-I studies in probabilistic risk assessment," Fuzzy Set Theory Syst., vol. 37, pp. 139-160, 1990.
    • (1990) Fuzzy Set Theory Syst. , vol.37 , pp. 139-160
    • Misra, K.B.1    Weber, G.G.2
  • 66
    • 0024867337 scopus 로고
    • "A new method for fuzzy fault tree analysis"
    • K. B. Misra and G. G. Weber, "A new method for fuzzy fault tree analysis," Microelectron. Reliability, vol. 29, pp. 195-216, 1989.
    • (1989) Microelectron. Reliability , vol.29 , pp. 195-216
    • Misra, K.B.1    Weber, G.G.2
  • 67
    • 84862208643 scopus 로고
    • "Fuzzy fault tree analysis: Case studies"
    • in T. Onisawa and J. Kacprzyk, Eds. Heidelberg, Germany: Physica-Verlag
    • A. W. Deshpande and P. Khanna, "Fuzzy fault tree analysis: Case studies," in Reliability and Safety Analyses Under Fuzziness, T. Onisawa and J. Kacprzyk, Eds. Heidelberg, Germany: Physica-Verlag, 1995.
    • (1995) Reliability and Safety Analyses Under Fuzziness
    • Deshpande, A.W.1    Khanna, P.2
  • 68
    • 84992933813 scopus 로고    scopus 로고
    • "A fuzzy set model for construction dispute evaluation"
    • S. O. Cheung, S. T. Ng, and W. S. Sin, "A fuzzy set model for construction dispute evaluation," Construction Innovation, vol. 1, pp. 117-127, 2001.
    • (2001) Construction Innovation , vol.1 , pp. 117-127
    • Cheu, S.O.1    Ng, S.T.2    Sin, W.S.3
  • 69
    • 2442585224 scopus 로고    scopus 로고
    • "Trust in construction partnering: Views from parties of the partnering dance"
    • S. P. Wong and S. O. Cheung, "Trust in construction partnering: Views from parties of the partnering dance," Int. J. Project Manag., vol. 22, no. 6, pp. 437-446, 2004.
    • (2004) Int. J. Project Manag. , vol.22 , Issue.6 , pp. 437-446
    • Wong, S.P.1    Cheung, S.O.2
  • 70
    • 1342287952 scopus 로고    scopus 로고
    • "Effective partnering tools in construction: A case study on MTRC TKE contract 604 in Hong Kong"
    • R. Bayliss, S. O. Cheung, C. H. Suen, and S. P. Wong, "Effective partnering tools in construction: A case study on MTRC TKE contract 604 in Hong Kong," Int. J. Project Manag., vol. 22, no. 3, pp. 253-263, 2004.
    • (2004) Int. J. Project Manag. , vol.22 , Issue.3 , pp. 253-263
    • Bayliss, R.1    Cheung, S.O.2    Suen, C.H.3    Wong, S.P.4
  • 71
    • 15944372664 scopus 로고    scopus 로고
    • "Structural equation model of trust and partnering success"
    • S. P. Wong and S. O. Cheung, "Structural equation model of trust and partnering success," J. Manag. Eng., vol. 21, no. 2, pp. 70-80, 2005.
    • (2005) J. Manag. Eng. , vol.21 , Issue.2 , pp. 70-80
    • Wong, S.P.1    Cheung, S.O.2
  • 72
    • 14744297449 scopus 로고    scopus 로고
    • "Lessons learned from rigid conflict resolution in an organization: Construction conflict case study"
    • J. H. Ock and S. H. Han, "Lessons learned from rigid conflict resolution in an organization: Construction conflict case study," J. Manag. Eng., vol. 19, no. 2, pp. 83-89, 2003.
    • (2003) J. Manag. Eng. , vol.19 , Issue.2 , pp. 83-89
    • Ock, J.H.1    Han, S.H.2
  • 73
    • 0036696620 scopus 로고    scopus 로고
    • "The effect of attitudinal differences on interface conflict on large construction projects the case of the Pak Mun Dam project"
    • P. Awakul and S. O. Ogunlana, "The effect of attitudinal differences on interface conflict on large construction projects the case of the Pak Mun Dam project," Environ. Impact Assessment, vol. 22, no. 4, pp. 311-335, 2002.
    • (2002) Environ. Impact Assessment , vol.22 , Issue.4 , pp. 311-335
    • Awakul, P.1    Ogunlana, S.O.2
  • 74
    • 33746583596 scopus 로고    scopus 로고
    • "A catastrophe model of construction conflict behavior"
    • to be published
    • T. W. Yiu and S. O. Cheung, "A catastrophe model of construction conflict behavior," Building Environ., to be published.
    • Building Environ.
    • Yiu, T.W.1    Cheung, S.O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.