1
-
-
0000078316
-
Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times
-
I. Adiri, and D. Pohoryles Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times Naval Research Logistics 29 1982 495 504
-
(1982)
Naval Research Logistics
, vol.29
, pp. 495-504
-
-
Adiri, I.1
Pohoryles, D.2
-
2
-
-
0032682389
-
Scheduling with time dependent processing times: Review and extensions
-
B. Alidaee, and N.K. Womer Scheduling with time dependent processing times: review and extensions Journal of the Operational Research Society 50 1999 711 720
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 711-720
-
-
Alidaee, B.1
Womer, N.K.2
-
4
-
-
27844544423
-
Scheduling deteriorating jobs with ready times
-
K. Inderfurth, W. Schwodiauer Domschke, F. Juhnke, P. Kleinschmidt, G. Wascher, Springer Verlag Berlin
-
A. Bachman, and A. Janiak Scheduling deteriorating jobs with ready times K. Inderfurth, W. Schwodiauer Domschke, F. Juhnke, P. Kleinschmidt, G. Wascher, Operations Research, Selected Papers of the Symposium on Operations Research (SOR 1999) 2000 Springer Verlag Berlin 342 348
-
(2000)
Operations Research, Selected Papers of the Symposium on Operations Research (SOR 1999)
, pp. 342-348
-
-
Bachman, A.1
Janiak, A.2
-
6
-
-
84859922781
-
Total weighted completion time minimization in a problem of scheduling deteriorating jobs
-
P. Chamoni, R. Leisten, A. Martin, J. Minnemann, H. Stadtler, Springer Verlag Berlin
-
A. Bachman, and A. Janiak Total weighted completion time minimization in a problem of scheduling deteriorating jobs P. Chamoni, R. Leisten, A. Martin, J. Minnemann, H. Stadtler, Operations Research, Selected Papers of the International Conference on Operations Research (OR 2001) 2002 Springer Verlag Berlin 265 271
-
(2002)
Operations Research, Selected Papers of the International Conference on Operations Research (OR 2001)
, pp. 265-271
-
-
Bachman, A.1
Janiak, A.2
-
7
-
-
0037203614
-
Minimizing the total weighted completion time of deteriorating jobs
-
DOI 10.1016/S0020-0190(01)00196-X, PII S002001900100196X
-
A. Bachman, A. Janiak, and M.Y. Kovalyov Minimizing the total weighted completion time of deteriorating jobs Information Processing Letters 81 2002 81 84 (Pubitemid 33050952)
-
(2002)
Information Processing Letters
, vol.81
, Issue.2
, pp. 81-84
-
-
Bachman, A.1
Janiak, A.2
Kovalyov, M.Y.3
-
8
-
-
0025429963
-
Scheduling deteriorating jobs on a single processor
-
S. Browne, and U. Yechiali Scheduling deteriorating jobs on a single processor Operations Research 38 1990 495 498 (Pubitemid 20720746)
-
(1990)
Operations Research
, vol.38
, Issue.3
, pp. 495-498
-
-
Browne Sid1
Yechiali Uri2
-
9
-
-
0003051113
-
Parallel machine scheduling with time dependent processing times
-
Z.-L. Chen Parallel machine scheduling with time dependent processing times Discrete Applied Mathematics 70 1996 81 94
-
(1996)
Discrete Applied Mathematics
, vol.70
, pp. 81-94
-
-
Chen, Z.-L.1
-
11
-
-
80055029480
-
Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
-
T.C.E. Cheng, S.-J. Yang, and D.-L. Yang Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity International Journal of Production Economics 135 2012 154 161
-
(2012)
International Journal of Production Economics
, vol.135
, pp. 154-161
-
-
Cheng, T.C.E.1
Yang, S.-J.2
Yang, D.-L.3
-
14
-
-
84857454886
-
Integrating noncyclical preventive maintenance scheduling and production planning for a single machine
-
M.-C. Fitouhi, and M. Nourelfath Integrating noncyclical preventive maintenance scheduling and production planning for a single machine International Journal of Production Economics 136 2012 344 351
-
(2012)
International Journal of Production Economics
, vol.136
, pp. 344-351
-
-
Fitouhi, M.-C.1
Nourelfath, M.2
-
18
-
-
0142246404
-
Minimization of maximum lateness under linear deterioration
-
DOI 10.1016/j.omega.2003.08.003, PII S0305048303000938
-
Y.S. Hsu, and B.M.T. Lin Minimization of maximum lateness under linear deterioration Omega 31 2003 459 469 (Pubitemid 37325112)
-
(2003)
Omega
, vol.31
, Issue.6
, pp. 459-469
-
-
Hsu, Y.S.1
Lin, B.M.T.2
-
19
-
-
0035365406
-
NP-hard cases in scheduling deteriorating jobs on dedicated machines
-
A. Kononov, and S. Gawiejnowicz NP-hard cases in scheduling deteriorating jobs on dedicated machines Journal of the Operational Research Society 52 2001 708 717 (Pubitemid 32609075)
-
(2001)
Journal of the Operational Research Society
, vol.52
, Issue.6
, pp. 708-717
-
-
Kononov, A.1
Gawiejnowicz, S.2
-
20
-
-
61449139202
-
An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
-
A. Kovács, K.N. Brown, and S.A. Tarim An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups International Journal of Production Economics 118 2009 282 291
-
(2009)
International Journal of Production Economics
, vol.118
, pp. 282-291
-
-
Kovács, A.1
Brown, K.N.2
Tarim, S.A.3
-
21
-
-
79954418013
-
Scheduling deterioration jobs with CON/SLK due date assignment on a single machine
-
S. Li, C.T. Ng, and J.J. Yuan Scheduling deterioration jobs with CON/SLK due date assignment on a single machine International Journal of Production Economics 131 2011 747 751
-
(2011)
International Journal of Production Economics
, vol.131
, pp. 747-751
-
-
Li, S.1
Ng, C.T.2
Yuan, J.J.3
-
22
-
-
0000281691
-
A concise survey of efficient solvable special cases of the permutation flowshop problem
-
C.L. Monma, and A.H.G. Rinnooy Kan A concise survey of efficient solvable special cases of the permutation flowshop problem RAIRO 17 1983 105 119
-
(1983)
RAIRO
, vol.17
, pp. 105-119
-
-
Monma, C.L.1
Rinnooy Kan, A.H.G.2
-
23
-
-
0026258725
-
V-shaped policies for scheduling deteriorating jobs
-
G. Mosheiov V-shaped policies for scheduling deteriorating jobs Operations Research 39 1991 979 991
-
(1991)
Operations Research
, vol.39
, pp. 979-991
-
-
Mosheiov, G.1
-
24
-
-
0028463787
-
Scheduling jobs under simple linear deterioration
-
G. Mosheiov Scheduling jobs under simple linear deterioration Computers and Operations Research 21 1994 653 659
-
(1994)
Computers and Operations Research
, vol.21
, pp. 653-659
-
-
Mosheiov, G.1
-
25
-
-
0029390921
-
Scheduling jobs with step-deterioration: Minimizing makespan on a single- and multi-machine
-
G. Mosheiov Scheduling jobs with step-deterioration: minimizing makespan on a single- and multi-machine Computers and Industrial Engineering 28 1995 869 879
-
(1995)
Computers and Industrial Engineering
, vol.28
, pp. 869-879
-
-
Mosheiov, G.1
-
26
-
-
0032204974
-
Multi-machine scheduling with linear deterioration
-
G. Mosheiov Multi-machine scheduling with linear deterioration INFOR 36 1998 205 214 (Pubitemid 128645105)
-
(1998)
INFOR
, vol.36
, Issue.4
, pp. 205-214
-
-
Mosheiov, G.1
-
27
-
-
84867973795
-
Complexity analysis of job-shop scheduling with deteriorating jobs
-
G. Mosheiov Complexity analysis of job-shop scheduling with deteriorating jobs Discrete Applied Mathematics 117 2002 195 209
-
(2002)
Discrete Applied Mathematics
, vol.117
, pp. 195-209
-
-
Mosheiov, G.1
-
28
-
-
80055049080
-
A note: Multi-machine scheduling with general position-based deterioration to minimize total load
-
G. Mosheiov A note: multi-machine scheduling with general position-based deterioration to minimize total load International Journal of Production Economics 135 2012 523 525
-
(2012)
International Journal of Production Economics
, vol.135
, pp. 523-525
-
-
Mosheiov, G.1
-
29
-
-
77951115566
-
The Browne-Yechiali single machine sequence is optimal for flowshops
-
G. Mosheiov, A. Sarig, and J. Sidney The Browne-Yechiali single machine sequence is optimal for flowshops Computers and Operations Research 37 2010 1965 1967
-
(2010)
Computers and Operations Research
, vol.37
, pp. 1965-1967
-
-
Mosheiov, G.1
Sarig, A.2
Sidney, J.3
-
30
-
-
68249112312
-
A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs
-
C.T. Ng, J.-B. Wang, T.C.E. Cheng, and L.L. Liu A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs Computers and Operations Research 37 2010 83 90
-
(2010)
Computers and Operations Research
, vol.37
, pp. 83-90
-
-
Ng, C.T.1
Wang, J.-B.2
Cheng, T.C.E.3
Liu, L.L.4
-
33
-
-
0021415508
-
The three-machine no-wait flow shop problem is NP-complete
-
H. Rock The three-machine no-wait flow shop problem is NP-complete Journal of the ACM 31 1984 336 345
-
(1984)
Journal of the ACM
, vol.31
, pp. 336-345
-
-
Rock, H.1
-
34
-
-
0028533158
-
Single machine scheduling with start time dependent processing times: Some solvable cases
-
P.S. Sundararaghavan, and A.S. Kunnathur Single machine scheduling with start time dependent processing times: some solvable cases European Journal of Operational Research 78 1994 394 403
-
(1994)
European Journal of Operational Research
, vol.78
, pp. 394-403
-
-
Sundararaghavan, P.S.1
Kunnathur, A.S.2
-
35
-
-
67349224105
-
Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers
-
X. Wang, and T.C.E. Cheng Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers International Journal of Production Economics 119 2009 199 206
-
(2009)
International Journal of Production Economics
, vol.119
, pp. 199-206
-
-
Wang, X.1
Cheng, T.C.E.2
-
36
-
-
11844302276
-
No-wait or no-idle permutation flowshop scheduling with dominating machines
-
J.-B. Wang, and Z.-Q. Xia No-wait or no-idle permutation flowshop scheduling with dominating machines Journal of Applied Mathematics and Computing 17 2005 419 432 (Pubitemid 40096979)
-
(2005)
Journal of Applied Mathematics and Computing
, vol.17
, Issue.1-2
, pp. 419-432
-
-
Wang, J.-B.1
Xia, Z.-Q.2
-
37
-
-
33748318134
-
Minimizing total completion time in a two-machine flow shop with deteriorating jobs
-
DOI 10.1016/j.amc.2005.11.162, PII S0096300305011124
-
J.-B. Wang, C.T. Ng, T.C.E. Cheng, and L.-L. Liu Minimizing total completion time in a two-machine flow shop with deteriorating jobs Applied Mathematics and Computation 180 2006 185 193 (Pubitemid 44331335)
-
(2006)
Applied Mathematics and Computation
, vol.180
, Issue.1
, pp. 185-193
-
-
Wang, J.-B.1
Daniel Ng, C.T.2
Cheng, T.C.E.3
Liu, L.-L.4
-
38
-
-
37349025024
-
Single-machine scheduling with a time-dependent learning effect
-
DOI 10.1016/j.ijpe.2007.03.013, PII S0925527307001661
-
J.-B. Wang, C.T. Ng, T.C.E. Cheng, and L.-L. Liu Single machine scheduling with a time-dependent learning effect International Journal of Production Economics 111 2 2008 802 811 (Pubitemid 350299170)
-
(2008)
International Journal of Production Economics
, vol.111
, Issue.2
, pp. 802-811
-
-
Wang, J.-B.1
Ng, C.T.2
Cheng, T.C.E.3
Liu, L.L.4
-
41
-
-
84858070782
-
Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study
-
Y. Xi, and J. Jiang Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: an experimental study International Journal of Production Economics 137 2012 1 10
-
(2012)
International Journal of Production Economics
, vol.137
, pp. 1-10
-
-
Xi, Y.1
Jiang, J.2
-
45
-
-
84855983545
-
Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints
-
C.-L. Zhao, and H.-Y. Tang Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints International Journal of Production Economics 136 2012 131 136
-
(2012)
International Journal of Production Economics
, vol.136
, pp. 131-136
-
-
Zhao, C.-L.1
Tang, H.-Y.2
-
46
-
-
72049099612
-
Single machine scheduling time-dependent jobs with resource-dependent ready times
-
V.C.Y. Zhu, L. Sun, L. Sun, and X. Li Single machine scheduling time-dependent jobs with resource-dependent ready times Computers and Industrial Engineering 58 2010 84 87
-
(2010)
Computers and Industrial Engineering
, vol.58
, pp. 84-87
-
-
Zhu, V.C.Y.1
Sun, L.2
Sun, L.3
Li, X.4
|