메뉴 건너뛰기




Volumn 36, Issue 4, 1998, Pages 205-214

Multi-machine scheduling with linear deterioration

Author keywords

Deteriorating jobs; Deterministic scheduling; Heuristics; Multiple machine

Indexed keywords

COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; PARALLEL PROCESSING SYSTEMS; SCHEDULING;

EID: 0032204974     PISSN: 03155986     EISSN: None     Source Type: Journal    
DOI: 10.1080/03155986.1998.11732359     Document Type: Article
Times cited : (96)

References (17)
  • 2
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on a single processor
    • S. Browne and U. Yechiali, "Scheduling deteriorating jobs on a single processor", Operations Research, Vol. 38, No. 3, pp. 495-498 (1990).
    • (1990) Operations Research , vol.38 , Issue.3 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 3
    • 0003051113 scopus 로고    scopus 로고
    • Parallel machine scheduling with time dependent processing times
    • Z-L Chen, "Parallel machine scheduling with time dependent processing times", Discrete Applied Math., Vol. 70, pp. 81-94 (1996).
    • (1996) Discrete Applied Math. , vol.70 , pp. 81-94
    • Chen, Z.-L.1
  • 4
    • 0029292057 scopus 로고
    • A Note on single-processor scheduling with time-dependent execution times
    • Z-L Chen, "A Note on single-processor scheduling with time-dependent execution times", Operations Research Letters, Vol. 17, pp. 127-129 (1995).
    • (1995) Operations Research Letters , vol.17 , pp. 127-129
    • Chen, Z.-L.1
  • 6
    • 84976822151 scopus 로고
    • Strong NP-completeness results: Motivation, examples and implications
    • M. R. Garey and D. S. Johnson, "Strong NP-completeness results: Motivation, examples and implications", J. Assoc. Comput. Mach., Vol. 25, pp. 499-508 (1978).
    • (1978) J. Assoc. Comput. Mach. , vol.25 , pp. 499-508
    • Garey, M.R.1    Johnson, D.S.2
  • 8
    • 0024137249 scopus 로고
    • Single facility scheduling with nonlinear processing times
    • J. N. D. Gupta and S. K. Gupta, "Single facility scheduling with nonlinear processing times", Computers and Industrial Engineering, Vol. 14, No. 4, pp. 387-393 (1988).
    • (1988) Computers and Industrial Engineering , vol.14 , Issue.4 , pp. 387-393
    • Gupta, J.N.D.1    Gupta, S.K.2
  • 9
    • 0027885153 scopus 로고
    • Complexity of scheduling tasks with time-dependent execution times
    • K. I.-J Ho, J.Y-T. Leung and W-D. Wei, "Complexity of scheduling tasks with time-dependent execution times", Inform. Process. Letters, Vol. 48, pp. 315-320 (1993).
    • (1993) Inform. Process. Letters , vol.48 , pp. 315-320
    • Ho, K.I.-J.1    Leung, J.Y.-T.2    Wei, W.-D.3
  • 10
    • 0141445326 scopus 로고
    • The NP-Completeness Column: An Ongoing Guide
    • D. S. Johnson, "The NP-Completeness Column: An Ongoing Guide", Journal of Algorithms, Vol. 4, pp. 393-405 (1981).
    • (1981) Journal of Algorithms , vol.4 , pp. 393-405
    • Johnson, D.S.1
  • 11
    • 0032136143 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs to minimize makespan
    • W. Kubiak and S. L. van de Velde, "Scheduling deteriorating jobs to minimize makespan", Naval Research Logistics, Vol. 45, pp. 511-523 (1998).
    • (1998) Naval Research Logistics , vol.45 , pp. 511-523
    • Kubiak, W.1    Van De Velde, S.L.2
  • 12
    • 0025700721 scopus 로고
    • Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
    • A. S. Kunnathur and S. K. Gupta, "Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem", European Journal of Operational Research, Vol. 47, pp. 56-64 (1990).
    • (1990) European Journal of Operational Research , vol.47 , pp. 56-64
    • Kunnathur, A.S.1    Gupta, S.K.2
  • 13
    • 0026258725 scopus 로고
    • V-Shaped policies to schedule deteriorating jobs
    • G. Mosheiov, "V-Shaped policies to schedule deteriorating jobs", Operations Research, Vol. 39, No. 6, pp. 979-991 (1991).
    • (1991) Operations Research , vol.39 , Issue.6 , pp. 979-991
    • Mosheiov, G.1
  • 14
    • 0028463787 scopus 로고
    • Scheduling deteriorating jobs under simple linear deterioration
    • G. Mosheiov, "Scheduling deteriorating jobs under simple linear deterioration", Computers and Operations Research, Vol. 21, No. 6, pp. 653-659 (1994).
    • (1994) Computers and Operations Research , vol.21 , Issue.6 , pp. 653-659
    • Mosheiov, G.1
  • 15
    • 0029390921 scopus 로고
    • Scheduling jobs with step-deterioration: Minimizing makespan on single and multi-machine
    • G. Mosheiov, "Scheduling jobs with step-deterioration: minimizing makespan on single and multi-machine", Computers and Industrial Engineering, Vol. 28, No. 4, pp. 869-879 (1995).
    • (1995) Computers and Industrial Engineering , vol.28 , Issue.4 , pp. 869-879
    • Mosheiov, G.1
  • 16
    • 0030305471 scopus 로고    scopus 로고
    • A-Shaped policies to schedule deteriorating jobs
    • G. Mosheiov, "A-Shaped policies to schedule deteriorating jobs", Journal of The Operational Research Society, Vol. 47, pp. 1184-1191 (1996).
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 1184-1191
    • Mosheiov, G.1
  • 17
    • 0028533158 scopus 로고
    • Single machine scheduling with start time dependent processing times: Some solvable cases
    • P. S. Sundararaghavan and A. S. Kunnathur, "Single machine scheduling with start time dependent processing times: some solvable cases", European Journal of Operational Research, Vol. 78, pp. 394-403 (1994).
    • (1994) European Journal of Operational Research , vol.78 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.