메뉴 건너뛰기




Volumn 61, Issue 3, 2011, Pages 647-654

Flowshop scheduling of deteriorating jobs on dominating machines

Author keywords

Deteriorating jobs; Dominating machines; Flowshop; No idle; No wait; Scheduling

Indexed keywords

DETERIORATING JOBS; DOMINATING MACHINES; FLOW-SHOPS; NO-IDLE; NO-WAIT;

EID: 80053204848     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2011.04.020     Document Type: Article
Times cited : (18)

References (25)
  • 1
    • 0000078316 scopus 로고
    • Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times
    • I. Adiri, and D. Pohoryles Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times Naval Research Logistics 29 1982 495 504
    • (1982) Naval Research Logistics , vol.29 , pp. 495-504
    • Adiri, I.1    Pohoryles, D.2
  • 2
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing processing times: Review and extensions
    • B. Alidaee, and N.K. Womer Scheduling with time dependent processing processing times: Review and extensions Journal of the Operational Research Society 50 1999 711 720
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 3
    • 0036604821 scopus 로고    scopus 로고
    • Nonpreemptive flowshop scheduling with machine dominance
    • DOI 10.1016/S0377-2217(01)00356-3, PII S0377221701003563
    • O. Čepek, M. Okada, and M. Vlach Nonpreemptive flowshop scheduling with machine dominance European Journal of Operational Research 139 2002 245 261 (Pubitemid 34201237)
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 245-261
    • Epek, O.1    Okada, M.2    Vlach, M.3
  • 5
    • 34249042307 scopus 로고    scopus 로고
    • Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
    • M.B. Cheng, S.J. Sun, and L.M. He Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines European Journal of Operational Research 183 2007 115 124
    • (2007) European Journal of Operational Research , vol.183 , pp. 115-124
    • Cheng, M.B.1    Sun, S.J.2    He, L.M.3
  • 11
    • 0003075019 scopus 로고
    • Optimal two and three stage production schedules with setup times included
    • S.M. Johnson Optimal two and three stage production schedules with setup times included Naval Research Logistics Quarterly 1 1954 61 68
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 12
    • 0035365406 scopus 로고    scopus 로고
    • NP-hard cases in scheduling deteriorating jobs on dedicated machines
    • A. Kononov, and S. Gawiejnowicz NP-hard cases in scheduling deteriorating jobs on dedicated machines Journal of the Operational Research Society 52 2001 708 717 (Pubitemid 32609075)
    • (2001) Journal of the Operational Research Society , vol.52 , Issue.6 , pp. 708-717
    • Kononov, A.1    Gawiejnowicz, S.2
  • 13
    • 56549093708 scopus 로고    scopus 로고
    • Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates
    • W.-C. Lee, C.-C. Wu, Y.-H. Chung, and H.-C. Liu Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates Computers & Industrial Engineering 36 2009 2111 2121
    • (2009) Computers & Industrial Engineering , vol.36 , pp. 2111-2121
    • Lee, W.-C.1    Wu, C.-C.2    Chung, Y.-H.3    Liu, H.-C.4
  • 14
    • 41449117952 scopus 로고    scopus 로고
    • A two-machine flowshop makespan scheduling problem with deteriorating jobs
    • DOI 10.1016/j.cie.2007.10.010, PII S0360835207002276
    • W.-C. Lee, C.-C. Wu, C.-C. Wen, and Y.-H. Chung A two-machine flowshop makespan scheduling problem with deteriorating jobs Computers & Industrial Engineering 54 4 2008 737 749 (Pubitemid 351458376)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 737-749
    • Lee, W.-C.1    Wu, C.-C.2    Wen, C.-C.3    Chung, Y.-H.4
  • 15
    • 0000281691 scopus 로고
    • A concise survey of efficient solvable special cases of the permutation flowshop problem
    • C.L. Monma, and A.H.G. Rinnooy Kan A concise survey of efficient solvable special cases of the permutation flowshop problem RAIRO Recherche Opérationelle 17 1983 105 119
    • (1983) RAIRO Recherche Opérationelle , vol.17 , pp. 105-119
    • Monma, C.L.1    Rinnooy Kan, A.H.G.2
  • 16
    • 84867973795 scopus 로고    scopus 로고
    • Complexity analysis of job-shop scheduling with deteriorating jobs
    • G. Mosheiov Complexity analysis of job-shop scheduling with deteriorating jobs Discrete Applied Mathematics 117 2002 195 209
    • (2002) Discrete Applied Mathematics , vol.117 , pp. 195-209
    • Mosheiov, G.1
  • 18
    • 69249227487 scopus 로고    scopus 로고
    • A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
    • L. Sun, L. Sun, K. Cui, and J.-B. Wang A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines European Journal of Operational Research 200 2010 309 311
    • (2010) European Journal of Operational Research , vol.200 , pp. 309-311
    • Sun, L.1    Sun, L.2    Cui, K.3    Wang, J.-B.4
  • 19
    • 54049088245 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
    • L. Tang, and P. Liu Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration Applied Mathematical Modelling 33 2009 1187 1199
    • (2009) Applied Mathematical Modelling , vol.33 , pp. 1187-1199
    • Tang, L.1    Liu, P.2
  • 20
    • 33845309968 scopus 로고    scopus 로고
    • Flow shop scheduling problems with decreasing linear deterioration under dominant machines
    • DOI 10.1016/j.cor.2005.08.008, PII S0305054805002637
    • J.-B. Wang Flow shop scheduling problems with decreasing linear deterioration under dominating machines Computers & Operations Research 34 2007 2043 2058 (Pubitemid 44879772)
    • (2007) Computers and Operations Research , vol.34 , Issue.7 , pp. 2043-2058
    • Wang, J.-B.1
  • 21
    • 77953611449 scopus 로고    scopus 로고
    • Flow shop scheduling with deteriorating jobs under dominating machines to minimize makespan
    • J.-B. Wang Flow shop scheduling with deteriorating jobs under dominating machines to minimize makespan International Journal of Advanced Manufacturing Technology 48 2010 719 723
    • (2010) International Journal of Advanced Manufacturing Technology , vol.48 , pp. 719-723
    • Wang, J.-B.1
  • 22
    • 33748318134 scopus 로고    scopus 로고
    • Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    • DOI 10.1016/j.amc.2005.11.162, PII S0096300305011124
    • J.-B. Wang, C.T. Ng, T.C.E. Cheng, and L.-L. Liu Minimizing total completion time in a two-machine flow shop with deteriorating jobs Applied Mathematics and Computation 180 2006 185 193 (Pubitemid 44331335)
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 185-193
    • Wang, J.-B.1    Daniel Ng, C.T.2    Cheng, T.C.E.3    Liu, L.-L.4
  • 23
    • 27844604203 scopus 로고    scopus 로고
    • Flow shop scheduling with deteriorating jobs under dominating machines
    • DOI 10.1016/j.omega.2004.10.006, PII S0305048304001574
    • J.-B. Wang, and Z.-Q. Xia Flow shop scheduling with deteriorating jobs under dominating machines Omega 34 2006 327 336 (Pubitemid 41644493)
    • (2006) Omega , vol.34 , Issue.4 , pp. 327-336
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 24
    • 31444438076 scopus 로고    scopus 로고
    • Flow shop scheduling problems with deteriorating jobs under dominating machines
    • DOI 10.1016/j.fishres.2005.08.011, PII 2601959
    • J.-B. Wang, and Z.-Q. Xia Flow shop scheduling problems with deteriorating jobs under dominating machines Journal of the Operational Research Society 57 2006 220 226 (Pubitemid 43149286)
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.2 , pp. 220-226
    • Wang, J.-B.1    Xia, Z.-Q.2
  • 25
    • 33745866674 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling to minimize mean flow time under linear deterioration
    • DOI 10.1016/j.ijpe.2005.11.005, PII S0925527306000338
    • C.-C. Wu, and W.-C. Lee Two-machine flowshop scheduling to minimize mean flow time under linear deterioration International Journal of Production Economics 103 2006 572 584 (Pubitemid 44038490)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 572-584
    • Wu, C.-C.1    Lee, W.-C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.