-
1
-
-
0024944070
-
Single machine flow-time scheduling with a single breakdown
-
Adiri I., Bruno J., Frostig E., and Kan R.A.H.G. Single machine flow-time scheduling with a single breakdown. Acta Informatica 26 (1989) 679-696
-
(1989)
Acta Informatica
, vol.26
, pp. 679-696
-
-
Adiri, I.1
Bruno, J.2
Frostig, E.3
Kan, R.A.H.G.4
-
2
-
-
0032682389
-
Scheduling with time dependent processing times: review and extensions
-
Alidaee B., and Womer N.K. Scheduling with time dependent processing times: review and extensions. Journal of Operational Research Society 50 (1999) 711-720
-
(1999)
Journal of Operational Research Society
, vol.50
, pp. 711-720
-
-
Alidaee, B.1
Womer, N.K.2
-
4
-
-
0025429963
-
Scheduling deteriorating jobs on a single processor
-
Browne S., and Yechiali U. Scheduling deteriorating jobs on a single processor. Operations Research 38 (1990) 495-498
-
(1990)
Operations Research
, vol.38
, pp. 495-498
-
-
Browne, S.1
Yechiali, U.2
-
6
-
-
33748547219
-
Scheduling linear deteriorating jobs with an availability constraint on a single machine
-
Ji Min., He Yong., and Cheng T.C.E. Scheduling linear deteriorating jobs with an availability constraint on a single machine. Theoretical Computer Science 362 (2006) 115-126
-
(2006)
Theoretical Computer Science
, vol.362
, pp. 115-126
-
-
Ji, Min.1
He, Yong.2
Cheng, T.C.E.3
-
7
-
-
33750974188
-
Fixed interval scheduling: models, applications. Computational complexity and algorithms
-
Kovalyov M.Y., Ng C.T., and Cheng T.C.E. Fixed interval scheduling: models, applications. Computational complexity and algorithms. European Journal of Operational Research 178 (2007) 331-342
-
(2007)
European Journal of Operational Research
, vol.178
, pp. 331-342
-
-
Kovalyov, M.Y.1
Ng, C.T.2
Cheng, T.C.E.3
-
8
-
-
0001880962
-
Parallel machines scheduling with nonsimultaneous machine available time
-
Lee C.-Y. Parallel machines scheduling with nonsimultaneous machine available time. Discrete Applied Mathematics 30 (1991) 53-61
-
(1991)
Discrete Applied Mathematics
, vol.30
, pp. 53-61
-
-
Lee, C.-Y.1
-
9
-
-
0000541519
-
Machine scheduling with an availability constraint
-
Lee C.-Y. Machine scheduling with an availability constraint. Journal of Global Optimization 9 (1996) 395-416
-
(1996)
Journal of Global Optimization
, vol.9
, pp. 395-416
-
-
Lee, C.-Y.1
-
10
-
-
0026897390
-
Single-machine flow-time scheduling with scheduled maintenance
-
Lee C.-Y., and Liman S.D. Single-machine flow-time scheduling with scheduled maintenance. Acta Informatica 29 (1992) 375-382
-
(1992)
Acta Informatica
, vol.29
, pp. 375-382
-
-
Lee, C.-Y.1
Liman, S.D.2
-
11
-
-
38249005916
-
Capacitated two-parallel machines scheduling to minimize sum of job completion times
-
Lee C.-Y., and Liman S.D. Capacitated two-parallel machines scheduling to minimize sum of job completion times. Discrete Applied Mathematics 41 (1993) 211-222
-
(1993)
Discrete Applied Mathematics
, vol.41
, pp. 211-222
-
-
Lee, C.-Y.1
Liman, S.D.2
-
12
-
-
30344452286
-
Two machine scheduling under disruption with transportation considerations
-
Lee C.-Y., Leung J.Y.-T., and Yu G. Two machine scheduling under disruption with transportation considerations. Journal of Scheduling 9 (2006) 35-48
-
(2006)
Journal of Scheduling
, vol.9
, pp. 35-48
-
-
Lee, C.-Y.1
Leung, J.Y.-T.2
Yu, G.3
-
14
-
-
0032668257
-
Due-date determination with resequencing
-
Li C.L., and Cheng T.C.E. Due-date determination with resequencing. IIE Transactions 31 (1999) 183-188
-
(1999)
IIE Transactions
, vol.31
, pp. 183-188
-
-
Li, C.L.1
Cheng, T.C.E.2
-
15
-
-
63149192685
-
Single machine scheduling of deteriorating jobs to minimize total absolute differences in completion times
-
Li Y.-Q., L G., Sun L.-Y., and Xu Z.-Y. Single machine scheduling of deteriorating jobs to minimize total absolute differences in completion times. International Journal of Production Economics 118 (2009) 424-429
-
(2009)
International Journal of Production Economics
, vol.118
, pp. 424-429
-
-
Li, Y.-Q.1
L, G.2
Sun, L.-Y.3
Xu, Z.-Y.4
-
16
-
-
0002574777
-
Minimizing the sum of job completion times on capacitated parallel machines
-
Mosheiov G. Minimizing the sum of job completion times on capacitated parallel machines. Mathematical and Computational Modelling 20 (1994) 91-99
-
(1994)
Mathematical and Computational Modelling
, vol.20
, pp. 91-99
-
-
Mosheiov, G.1
-
17
-
-
68249112312
-
A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs
-
Ng C.T., Wang J.-B., Liu L.-L., and Cheng T.C.E. A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs. Computers and Operations Research 37 (2010) 83-90
-
(2010)
Computers and Operations Research
, vol.37
, pp. 83-90
-
-
Ng, C.T.1
Wang, J.-B.2
Liu, L.-L.3
Cheng, T.C.E.4
-
18
-
-
33744966565
-
Disruption management for machine scheduling: the case of SPT schedules
-
Qi X., Bard J.F., and Yu G. Disruption management for machine scheduling: the case of SPT schedules. International Journal of Production Economics 103 (2006) 166-184
-
(2006)
International Journal of Production Economics
, vol.103
, pp. 166-184
-
-
Qi, X.1
Bard, J.F.2
Yu, G.3
-
19
-
-
0031525145
-
Rescheduling on a single machine with part-type dependent setup times and dead-lines
-
Unal A.T., Uzsoy R., and Kiran A.S. Rescheduling on a single machine with part-type dependent setup times and dead-lines. Annals of Operations Research 70 (1997) 93-113
-
(1997)
Annals of Operations Research
, vol.70
, pp. 93-113
-
-
Unal, A.T.1
Uzsoy, R.2
Kiran, A.S.3
-
21
-
-
36849012070
-
Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint
-
Wang J.-B., Ng C.T., and Cheng T.C.E. Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint. Computers and Operations Research 35 (2008) 2684-2693
-
(2008)
Computers and Operations Research
, vol.35
, pp. 2684-2693
-
-
Wang, J.-B.1
Ng, C.T.2
Cheng, T.C.E.3
-
23
-
-
62349137020
-
Single machine scheduling with a time-dependent learning effect and deteriorating jobs
-
Wang J.-B. Single machine scheduling with a time-dependent learning effect and deteriorating jobs. Journal of Operational Research Society 60 (2009) 583-586
-
(2009)
Journal of Operational Research Society
, vol.60
, pp. 583-586
-
-
Wang, J.-B.1
-
24
-
-
70349764551
-
A due-date assignment problem with learning effect and deteriorating jobs
-
Wang J.-B., and Guo Q. A due-date assignment problem with learning effect and deteriorating jobs. Applied Mathematical Modelling 34 (2010) 309-313
-
(2010)
Applied Mathematical Modelling
, vol.34
, pp. 309-313
-
-
Wang, J.-B.1
Guo, Q.2
|