메뉴 건너뛰기




Volumn 57, Issue 4, 2009, Pages 1182-1186

A deteriorating jobs problem with quadratic function of job lateness

Author keywords

Deteriorating jobs; Job lateness; Scheduling; Single machine

Indexed keywords

BRANCH-AND-BOUND ALGORITHMS; COMPLETION TIME; COMPUTATIONAL RESULTS; DECISION MAKERS; DETERIORATING JOBS; LINEAR DETERIORATION; MAKESPAN; NEAR-OPTIMAL SOLUTIONS; OPTIMAL SOLUTIONS; QUADRATIC FUNCTION; SINGLE MACHINES; SUM OF SQUARES;

EID: 71849096741     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.05.012     Document Type: Article
Times cited : (13)

References (19)
  • 1
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • Alidaee B., and Womer N.K. Scheduling with time dependent processing times: Review and extensions. Journal of the Operational Research Society 50 (1999) 711-720
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 3
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on a single processor
    • Browne S., and Yechiali U. Scheduling deteriorating jobs on a single processor. Operations Research 38 (1990) 495-498
    • (1990) Operations Research , vol.38 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 4
    • 0001898994 scopus 로고    scopus 로고
    • The complexity of single machine scheduling with release times
    • Cheng T.C.E., and Ding Q. The complexity of single machine scheduling with release times. Information Processing Letters 65 2 (1998) 75-79
    • (1998) Information Processing Letters , vol.65 , Issue.2 , pp. 75-79
    • Cheng, T.C.E.1    Ding, Q.2
  • 5
    • 0037211214 scopus 로고    scopus 로고
    • Scheduling start time dependent tasks with deadlines and identical initial processing times on a single machine
    • Cheng T.C.E., and Ding Q. Scheduling start time dependent tasks with deadlines and identical initial processing times on a single machine. Computers and Operations Research 30 1 (2003) 51-62
    • (2003) Computers and Operations Research , vol.30 , Issue.1 , pp. 51-62
    • Cheng, T.C.E.1    Ding, Q.2
  • 7
    • 0024137249 scopus 로고
    • Single facility scheduling with nonlinear processing times
    • Gupta J.N.D., and Gupta S.K. Single facility scheduling with nonlinear processing times. Computers & Industrial Engineering 14 (1988) 387-393
    • (1988) Computers & Industrial Engineering , vol.14 , pp. 387-393
    • Gupta, J.N.D.1    Gupta, S.K.2
  • 8
    • 0020809540 scopus 로고
    • Minimizing a quadratic function of job lateness on a single machine
    • Gupta S.K., and Sen T. Minimizing a quadratic function of job lateness on a single machine. Engineering Costs and Production Economics 7 (1983) 187-194
    • (1983) Engineering Costs and Production Economics , vol.7 , pp. 187-194
    • Gupta, S.K.1    Sen, T.2
  • 9
    • 0025700721 scopus 로고
    • Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
    • Kunnathur A.S., and Gupta S.K. Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem. European Journal of Operational Research 47 1 (1990) 56-64
    • (1990) European Journal of Operational Research , vol.47 , Issue.1 , pp. 56-64
    • Kunnathur, A.S.1    Gupta, S.K.2
  • 10
    • 35748982093 scopus 로고    scopus 로고
    • Multi-machine scheduling with deteriorating jobs and scheduled maintenance
    • Lee W.C., and Wu C.C. Multi-machine scheduling with deteriorating jobs and scheduled maintenance. Applied Mathematical Modelling 32 (2008) 362-373
    • (2008) Applied Mathematical Modelling , vol.32 , pp. 362-373
    • Lee, W.C.1    Wu, C.C.2
  • 11
    • 38849195606 scopus 로고    scopus 로고
    • Scheduling deteriorating jobs on a single machine with release times
    • Lee W.C., Wu C.C., and Chung Y.H. Scheduling deteriorating jobs on a single machine with release times. Computers & Industrial Engineering 54 (2008) 441-452
    • (2008) Computers & Industrial Engineering , vol.54 , pp. 441-452
    • Lee, W.C.1    Wu, C.C.2    Chung, Y.H.3
  • 12
    • 0037204524 scopus 로고    scopus 로고
    • Three scheduling problems with deteriorating jobs to minimize the total completion time
    • Ng C.T., Cheng T.C.E., Bachman A., and Janiak A. Three scheduling problems with deteriorating jobs to minimize the total completion time. Information Processing Letters 81 6 (2002) 327-333
    • (2002) Information Processing Letters , vol.81 , Issue.6 , pp. 327-333
    • Ng, C.T.1    Cheng, T.C.E.2    Bachman, A.3    Janiak, A.4
  • 13
    • 0028533158 scopus 로고
    • Single machine scheduling with start time dependent processing time: Some solvable cases
    • Sundararaghavan P.S., and Kunnathur A.S. Single machine scheduling with start time dependent processing time: Some solvable cases. European Journal of Operational Research 78 3 (1994) 394-403
    • (1994) European Journal of Operational Research , vol.78 , Issue.3 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2
  • 16
    • 53049086739 scopus 로고    scopus 로고
    • Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect
    • 10.1016/j.cie.2008.01.017
    • Wang J.B. Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect. Computers & Industrial Engineering 1 (2008) 2-4 10.1016/j.cie.2008.01.017
    • (2008) Computers & Industrial Engineering , vol.1 , pp. 2-4
    • Wang, J.B.1
  • 17
    • 33745866674 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling to minimize mean flow time under linear deterioration
    • Wu C.C., and Lee W.C. Two-machine flowshop scheduling to minimize mean flow time under linear deterioration. International Journal of Production Economics 103 (2006) 572-584
    • (2006) International Journal of Production Economics , vol.103 , pp. 572-584
    • Wu, C.C.1    Lee, W.C.2
  • 18
    • 34748855553 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deterioration consideration
    • Wu C.C., Shiau Y.R., and Lee W.C. Single-machine group scheduling problems with deterioration consideration. Computers & Operations Research 35 (2008) 1652-1659
    • (2008) Computers & Operations Research , vol.35 , pp. 1652-1659
    • Wu, C.C.1    Shiau, Y.R.2    Lee, W.C.3
  • 19
    • 49049105854 scopus 로고    scopus 로고
    • Single-machine group-scheduling problems with deteriorating setup times and job-processing times
    • Wu C.C., and Lee W.C. Single-machine group-scheduling problems with deteriorating setup times and job-processing times. International Journal of Production Economics 115 (2008) 128-133
    • (2008) International Journal of Production Economics , vol.115 , pp. 128-133
    • Wu, C.C.1    Lee, W.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.