메뉴 건너뛰기




Volumn 126, Issue 3, 2000, Pages 557-566

Minimizing maximum lateness under linear deterioration

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; HEURISTIC METHODS; PROCESS CONTROL; PRODUCTION ENGINEERING; SCHEDULING;

EID: 0034325430     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00310-0     Document Type: Article
Times cited : (82)

References (8)
  • 2
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on single processor
    • Browne S., Yechiali U. Scheduling deteriorating jobs on single processor. Operations Research. 38/3:1990;495-498.
    • (1990) Operations Research , vol.383 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 5
    • 0040362439 scopus 로고
    • An extension of Johnson's results on job lot scheduling
    • Jackson J.R. An extension of Johnson's results on job lot scheduling. Naval Research Logistics Quarterly. 3:1956;201-203.
    • (1956) Naval Research Logistics Quarterly , vol.3 , pp. 201-203
    • Jackson, J.R.1
  • 6
    • 0025700721 scopus 로고
    • Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
    • Kunnathur A.S., Gupta S.K. Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem. European Journal of Operational Research. 47:1990;56-64.
    • (1990) European Journal of Operational Research , vol.47 , pp. 56-64
    • Kunnathur, A.S.1    Gupta, S.K.2
  • 7
    • 0028463787 scopus 로고
    • Scheduling jobs under simple linear deterioration
    • Mosheiov G. Scheduling jobs under simple linear deterioration. Computers and Operations Research. 21(3):1994;653-659.
    • (1994) Computers and Operations Research , vol.21 , Issue.3 , pp. 653-659
    • Mosheiov, G.1
  • 8
    • 0028533158 scopus 로고
    • Single machine scheduling with start time dependent processing times: Some solvable cases
    • Sundararaghavan P.S., Kunnathur A.S. Single machine scheduling with start time dependent processing times: Some solvable cases. European Journal of Operational Research. 78:1994;394-403.
    • (1994) European Journal of Operational Research , vol.78 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.