메뉴 건너뛰기




Volumn 70, Issue 1, 1996, Pages 81-93

Parallel machine scheduling with time dependent processing times

Author keywords

Heuristic; Parallel machine scheduling; Strong NP hardness; Time dependent processing times; Worst case bound

Indexed keywords


EID: 0003051113     PISSN: 0166218X     EISSN: None     Source Type: Journal    
DOI: 10.1016/0166-218X(96)00102-3     Document Type: Article
Times cited : (93)

References (10)
  • 1
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on a single process
    • S. Browne and U. Yechiali, Scheduling deteriorating jobs on a single process, Oper. Res. 38 (1990) 495-498.
    • (1990) Oper. Res. , vol.38 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 2
    • 0029292057 scopus 로고
    • A note on single-processor scheduling with time-dependent execution times
    • Z.-L. Chen, A note on single-processor scheduling with time-dependent execution times, Oper. Res. Lett., 17 (1995) 127-129.
    • (1995) Oper. Res. Lett. , vol.17 , pp. 127-129
    • Chen, Z.-L.1
  • 4
    • 0027885153 scopus 로고
    • Complexity of scheduling tasks with time-dependent execution times
    • K.I.-J. Ho, J.Y.-T. Leung and W.-D. Wei, Complexity of scheduling tasks with time-dependent execution times, Inform. Process. Lett. 48 (1993) 315-320.
    • (1993) Inform. Process. Lett. , vol.48 , pp. 315-320
    • Ho, K.I.-J.1    Leung, J.Y.-T.2    Wei, W.-D.3
  • 5
    • 0041579182 scopus 로고
    • Working paper, Laboratory of Production and Operation Management, Department of Mechanical Engineering, University of Twente, The Netherlands
    • W. Kubiak and S.L. van de Velde, Scheduling deteriorating jobs to minimize makespan, Working paper, Laboratory of Production and Operation Management, Department of Mechanical Engineering, University of Twente, The Netherlands, 1994.
    • (1994) Scheduling Deteriorating Jobs to Minimize Makespan
    • Kubiak, W.1    Van De Velde, S.L.2
  • 6
    • 0025700721 scopus 로고
    • Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
    • A.S. Kunnathur and S.K. Gupta, Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem, European J. Oper. Res. 47 (1990) 56-64.
    • (1990) European J. Oper. Res. , vol.47 , pp. 56-64
    • Kunnathur, A.S.1    Gupta, S.K.2
  • 7
    • 0026258725 scopus 로고
    • V-Shaped policies to schedule deteriorating jobs
    • G. Mosheiov, V-Shaped policies to schedule deteriorating jobs, Oper. Res. 39 (1991) 979-991.
    • (1991) Oper. Res. , vol.39 , pp. 979-991
    • Mosheiov, G.1
  • 8
    • 0028463787 scopus 로고
    • Scheduling jobs under simple linear deterioration
    • G. Mosheiov, Scheduling jobs under simple linear deterioration, Comput. Oper. Res. 21 (1994) 653-659.
    • (1994) Comput. Oper. Res. , vol.21 , pp. 653-659
    • Mosheiov, G.1
  • 9
    • 0042507106 scopus 로고
    • Working paper, School of Business Administration, The Hebrew University, Jerusalem, Israel
    • G. Mosheiov, Multi-machine scheduling with linear deterioration, Working paper, School of Business Administration, The Hebrew University, Jerusalem, Israel, 1995.
    • (1995) Multi-Machine Scheduling with Linear Deterioration
    • Mosheiov, G.1
  • 10
    • 0028533158 scopus 로고
    • Single machine scheduling with start time dependent processing times: Some solvable cases
    • P.S. Sundararaghavan and A.S. Kunnathur, Single machine scheduling with start time dependent processing times: some solvable cases, European J. Oper. Res. 78 (1994) 394-403.
    • (1994) European J. Oper. Res. , vol.78 , pp. 394-403
    • Sundararaghavan, P.S.1    Kunnathur, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.