메뉴 건너뛰기




Volumn 217, Issue 1, 2010, Pages 110-116

Makespan minimization in machine dominated flowshop

Author keywords

Combinatorial optimization; Flowshop; Machine dominance; Makespan; Scheduling

Indexed keywords

ELECTRONIC DEVICE; FLOW SHOP SCHEDULING PROBLEM; FLOW-SHOPS; MACHINE DOMINANCE; MAKESPAN; MAKESPAN MINIMIZATION; MINIMUM MAKESPAN; NUMERICAL EXAMPLE; SOLUTION APPROACH;

EID: 77955413700     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.amc.2010.05.022     Document Type: Article
Times cited : (7)

References (15)
  • 2
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • S.M. Johnson Optimal two- and three-stage production schedules with setup times included Naval Research Logistics Quarterly 1 1954 61 68
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 5
    • 33845309968 scopus 로고    scopus 로고
    • Flow shop scheduling problems with decreasing linear deterioration under dominant machines
    • J.B. Wang Flow shop scheduling problems with decreasing linear deterioration under dominant machines Computers and Operations Research 34 2007 2043 2058
    • (2007) Computers and Operations Research , vol.34 , pp. 2043-2058
    • Wang, J.B.1
  • 6
    • 33750799908 scopus 로고    scopus 로고
    • Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time
    • J.B. Wang, F. Shan, B. Jiang, and L.Y. Wang Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time Applied Mathematics and Computation 62 2006 947 954
    • (2006) Applied Mathematics and Computation , vol.62 , pp. 947-954
    • Wang, J.B.1    Shan, F.2    Jiang, B.3    Wang, L.Y.4
  • 7
    • 11844302276 scopus 로고    scopus 로고
    • No-wait or no-idle permutation flowshop scheduling with dominating machines
    • J.B. Wang, and Z.Q. Xia No-wait or no-idle permutation flowshop scheduling with dominating machines Applied Mathematics and Computation 17 2005 419 432
    • (2005) Applied Mathematics and Computation , vol.17 , pp. 419-432
    • Wang, J.B.1    Xia, Z.Q.2
  • 8
    • 31444438076 scopus 로고    scopus 로고
    • Flow shop scheduling problems with deteriorating jobs under dominating machines
    • J.B. Wang, and Z.Q. Xia Flow shop scheduling problems with deteriorating jobs under dominating machines Journal of the Operational Research Society 57 2006 220 226
    • (2006) Journal of the Operational Research Society , vol.57 , pp. 220-226
    • Wang, J.B.1    Xia, Z.Q.2
  • 9
    • 27844604203 scopus 로고    scopus 로고
    • Flow shop scheduling with deteriorating jobs under dominating machines
    • J.B. Wang, and Z.Q. Xia Flow shop scheduling with deteriorating jobs under dominating machines Omega 34 2006 327 336
    • (2006) Omega , vol.34 , pp. 327-336
    • Wang, J.B.1    Xia, Z.Q.2
  • 10
    • 33846617917 scopus 로고    scopus 로고
    • A note on flow shop scheduling problems with a learning effect on no-idle dominant machines
    • DOI 10.1016/j.amc.2006.05.206, PII S0096300306007843
    • M. Cheng, S. Sun, and Y. Yu A note on flow shop scheduling problems with a learning effect on no-idle dominant machines Applied Mathematics and Computation 184 2007 945 949 (Pubitemid 46176150)
    • (2007) Applied Mathematics and Computation , vol.184 , Issue.2 , pp. 945-949
    • Cheng, M.1    Sun, S.2    Yu, Y.3
  • 11
    • 48849084182 scopus 로고    scopus 로고
    • Erratum to: A note on flow shop scheduling problems with a learning effect on no-idle dominant machines
    • J.B. Wang Erratum to: A note on flow shop scheduling problems with a learning effect on no-idle dominant machines Applied Mathematics and Computation 202 2008 897 898
    • (2008) Applied Mathematics and Computation , vol.202 , pp. 897-898
    • Wang, J.B.1
  • 12
    • 55849130389 scopus 로고    scopus 로고
    • Makespan distribution of permutation flowshop schedules
    • F. Jin, J.N.D. Gupta, S.J. Song, and C. Wu Makespan distribution of permutation flowshop schedules Journal of Scheduling 11 2008 421 432
    • (2008) Journal of Scheduling , vol.11 , pp. 421-432
    • Jin, F.1    Gupta, J.N.D.2    Song, S.J.3    Wu, C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.