메뉴 건너뛰기




Volumn 37, Issue 11, 2010, Pages 1965-1967

The Browne-Yechiali single-machine sequence is optimal for flow-shops

Author keywords

Flow shop; Linear deterioration; Makespan; Scheduling

Indexed keywords

FLOW-SHOPS; LINEAR DETERIORATION; MAKESPAN; MINIMUM MAKESPAN; POLYNOMIAL-TIME; SINGLE MACHINES;

EID: 77951115566     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2010.01.006     Document Type: Article
Times cited : (12)

References (11)
  • 1
    • 0025429963 scopus 로고
    • Scheduling deteriorating jobs on a single processor
    • Browne S., and Yechiali U. Scheduling deteriorating jobs on a single processor. Operations Research 38 (1990) 495-498
    • (1990) Operations Research , vol.38 , pp. 495-498
    • Browne, S.1    Yechiali, U.2
  • 2
    • 34249042307 scopus 로고    scopus 로고
    • Flow-shop scheduling problems with deteriorating jobs on no-idle dominant machines
    • Cheng M.B., Sun S.J., and He L.M. Flow-shop scheduling problems with deteriorating jobs on no-idle dominant machines. European Journal of Operational Research 183 (2007) 115-124
    • (2007) European Journal of Operational Research , vol.183 , pp. 115-124
    • Cheng, M.B.1    Sun, S.J.2    He, L.M.3
  • 4
    • 36549038690 scopus 로고    scopus 로고
    • Total completion time in a two-machine flow-shop with deteriorating tasks
    • Finke G., and Oulamara A. Total completion time in a two-machine flow-shop with deteriorating tasks. Journal of Mathematical Modelling and Algorithms 6 (2007) 563-576
    • (2007) Journal of Mathematical Modelling and Algorithms , vol.6 , pp. 563-576
    • Finke, G.1    Oulamara, A.2
  • 6
    • 41449117952 scopus 로고    scopus 로고
    • A two-machine flowshop makespan scheduling problem with deteriorating jobs
    • Lee W.C., Wu C.C., Wen C.C., and Chung Y.H. A two-machine flowshop makespan scheduling problem with deteriorating jobs. Computers and Industrial Engineering 54 (2008) 737-749
    • (2008) Computers and Industrial Engineering , vol.54 , pp. 737-749
    • Lee, W.C.1    Wu, C.C.2    Wen, C.C.3    Chung, Y.H.4
  • 7
    • 85007084598 scopus 로고    scopus 로고
    • Two-machine flow-shop scheduling with conditional deteriorating second operations
    • Lin B.M.T., and Cheng T.C.E. Two-machine flow-shop scheduling with conditional deteriorating second operations. International Transactions in Operational Research 13 (2006) 91-98
    • (2006) International Transactions in Operational Research , vol.13 , pp. 91-98
    • Lin, B.M.T.1    Cheng, T.C.E.2
  • 8
    • 84867973795 scopus 로고    scopus 로고
    • Complexity analysis of job-shop scheduling with deteriorating machines
    • Mosheiov G. Complexity analysis of job-shop scheduling with deteriorating machines. Discrete Applied Mathematics 117 (2002) 195-209
    • (2002) Discrete Applied Mathematics , vol.117 , pp. 195-209
    • Mosheiov, G.1
  • 10
    • 33845309968 scopus 로고    scopus 로고
    • Flow-shop scheduling problems with decreasing linear deterioration under dominant machines
    • Wang J.B. Flow-shop scheduling problems with decreasing linear deterioration under dominant machines. Computers and Operational Research 34 (2007) 2043-2058
    • (2007) Computers and Operational Research , vol.34 , pp. 2043-2058
    • Wang, J.B.1
  • 11
    • 31444438076 scopus 로고    scopus 로고
    • Flow-shop scheduling problems with deteriorating jobs under dominating machines
    • Wang J.B., and Xia Z.Q. Flow-shop scheduling problems with deteriorating jobs under dominating machines. Journal of Operational Research 57 (2006) 220-226
    • (2006) Journal of Operational Research , vol.57 , pp. 220-226
    • Wang, J.B.1    Xia, Z.Q.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.