메뉴 건너뛰기




Volumn 136, Issue 2, 2012, Pages 255-265

Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production

Author keywords

Asymmetric travelling salesman problem; Production lot scheduling models; Soft drink industry

Indexed keywords

BOTTLING LINES; INDUSTRIAL PROCESSS; LOT SIZING; PRODUCTION STAGE; SCHEDULING PROBLEM; SEQUENCE-DEPENDENT SETUP TIME; SINGLE STAGE; SOFT DRINK BOTTLES; SOFT DRINK INDUSTRY; SOFT DRINKS; TRAVELLING SALESMAN PROBLEM; TWO STAGE;

EID: 84857456910     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2011.11.028     Document Type: Article
Times cited : (61)

References (48)
  • 1
    • 34548460398 scopus 로고    scopus 로고
    • Single machine multi-product capacitated lot sizing with sequence-dependent setups
    • DOI 10.1080/00207540601094465, PII 772294284
    • B. Almada-Lobo, D. Klabjan, J.F. Oliveira, and M.A. Carravilla Single machine multi-product capacitated lot sizing with sequence-dependent setups International Journal of Production Research 45 20 2007 4873 4894 (Pubitemid 47352796)
    • (2007) International Journal of Production Research , vol.45 , Issue.20 , pp. 4873-4894
    • Almada-Lobo, B.1    Klabjan, D.2    Carravilla, M.A.3    Oliveira, J.F.4
  • 3
    • 84855790162 scopus 로고    scopus 로고
    • Synchronization of scarce resources for a parallel machine lotsizing problem
    • C. Almeder, and B. Almada-Lobo Synchronization of scarce resources for a parallel machine lotsizing problem International Journal of Production Research 49 24 2011 7315 7335
    • (2011) International Journal of Production Research , vol.49 , Issue.24 , pp. 7315-7335
    • Almeder, C.1    Almada-Lobo, B.2
  • 4
    • 34548453509 scopus 로고    scopus 로고
    • Lot sizing and furnace scheduling in small foundries
    • DOI 10.1016/j.cor.2006.05.010, PII S0305054806001390
    • S.A. Araujo, M.N. Arenales, and A.R. Clark Lot-sizing and furnace scheduling in small foundries Computers & Operations Research 35 2008 916 932 (Pubitemid 47368854)
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 916-932
    • De Araujo, S.A.1    Arenales, M.N.2    Clark, A.R.3
  • 5
    • 41149118126 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
    • DOI 10.1016/j.cor.2007.04.003, PII S0305054807000858
    • P. Beraldi, G. Ghiani, A. Grieco, and E. Guerriero Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs Computers & Operations Research 35 2008 3644 3656 (Pubitemid 351443068)
    • (2008) Computers and Operations Research , vol.35 , Issue.11 , pp. 3644-3656
    • Beraldi, P.1    Ghiani, G.2    Grieco, A.3    Guerriero, E.4
  • 6
    • 0020194024 scopus 로고
    • Computational complexity of the lot size problem
    • G.R. Bitran, and H.H. Yanasse Computational complexity of the lot size problem Management Science 28 10 1982 1174 1186
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 8
    • 77952430972 scopus 로고    scopus 로고
    • Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching
    • A.R. Clark, R. Morabito, and E.A.V. Toso Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching Journal of Scheduling 2 13 2010 111 121
    • (2010) Journal of Scheduling , vol.2 , Issue.13 , pp. 111-121
    • Clark, A.R.1    Morabito, R.2    Toso, E.A.V.3
  • 10
    • 0031170482 scopus 로고    scopus 로고
    • Lot sizing and scheduling - Survey and extensions
    • PII S0377221797000301
    • A. Drexl, and A. Kimms Lot sizing and scheduling - survey and extensions European Journal of Operational Research 99 1997 221 235 (Pubitemid 127418431)
    • (1997) European Journal of Operational Research , vol.99 , Issue.2 , pp. 221-235
    • Drexl, A.1    Kimms, A.2
  • 11
    • 33748884885 scopus 로고    scopus 로고
    • Simultaneous lot sizing and scheduling for multi-product multi-level production
    • DOI 10.1016/j.ijpe.2005.04.011, PII S0925527305002240
    • G. Fandel, and C. Stammen-Hegene Simultaneous lotsizing and scheduling for multi-product multi-level production International Journal of Production Economics 104 2 2006 308 316 (Pubitemid 44425413)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 308-316
    • Fandel, G.1    Stammen-Hegene, C.2
  • 12
    • 58149250389 scopus 로고    scopus 로고
    • Solution approaches for the soft drink integrated production lot sizing and scheduling problem
    • D. Ferreira, R. Morabito, and S. Rangel Solution approaches for the soft drink integrated production lot sizing and scheduling problem European Journal of Operational Research 196 2009 697 706
    • (2009) European Journal of Operational Research , vol.196 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 13
    • 70350569826 scopus 로고    scopus 로고
    • Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants
    • D. Ferreira, R. Morabito, and S. Rangel Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants Computers & Operations Research 37 4 2010 684 691
    • (2010) Computers & Operations Research , vol.37 , Issue.4 , pp. 684-691
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 15
    • 0008655177 scopus 로고    scopus 로고
    • The general lotsizing and scheduling problem
    • B. Fleischmann, and H. Meyr The general lotsizing and scheduling problem OR Spektrum 19 1 1997 11 21
    • (1997) OR Spektrum , vol.19 , Issue.1 , pp. 11-21
    • Fleischmann, B.1    Meyr, H.2
  • 17
    • 60649083340 scopus 로고    scopus 로고
    • Discrete lot sizing and scheduling using product decomposition into attributes
    • C. Gicquel, N. Miégeville, M. Minoux, and Y. Dallery Discrete lot sizing and scheduling using product decomposition into attributes Computers & Operations Research 36 9 2009 2690 2698
    • (2009) Computers & Operations Research , vol.36 , Issue.9 , pp. 2690-2698
    • Gicquel, C.1    Miégeville, N.2    Minoux, M.3    Dallery, Y.4
  • 18
    • 5644274147 scopus 로고    scopus 로고
    • The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    • D. Gupta, and T. Magnusson The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times Computers & Operations Research 32 4 2005 727 747
    • (2005) Computers & Operations Research , vol.32 , Issue.4 , pp. 727-747
    • Gupta, D.1    Magnusson, T.2
  • 19
    • 21344476870 scopus 로고
    • Lotsizing and scheduling for production planning
    • Springer Berlin, Heidelberg, New York
    • K. Haase Lotsizing and scheduling for production planning Lecture Notes in Economics and Mathematical Systems vol. 4 1994 Springer Berlin, Heidelberg, New York
    • (1994) Lecture Notes in Economics and Mathematical Systems , vol.4 VOL.
    • Haase, K.1
  • 20
    • 0033690423 scopus 로고    scopus 로고
    • Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
    • K. Haase, and A. Kimms Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities International Journal of Production Economics 66 2 2000 159 169
    • (2000) International Journal of Production Economics , vol.66 , Issue.2 , pp. 159-169
    • Haase, K.1    Kimms, A.2
  • 22
    • 74149086575 scopus 로고    scopus 로고
    • A fix-and-optimize approach for the multi-level capacitated lot sizing problem
    • S. Helber, and F. Sahling A fix-and-optimize approach for the multi-level capacitated lot sizing problem International Journal of Production Economics 123 2 2010 247 256
    • (2010) International Journal of Production Economics , vol.123 , Issue.2 , pp. 247-256
    • Helber, S.1    Sahling, F.2
  • 24
    • 36448995797 scopus 로고    scopus 로고
    • Modeling industrial lot sizing problems: A review
    • DOI 10.1080/00207540600902262, PII 770289062
    • R. Jans, and Z. Degraeve Modeling industrial lot sizing problems: a review International Journal of Production Research 46 6 2008 1619 1643 (Pubitemid 350161679)
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1619-1643
    • Jans, R.1    Degraeve, Z.2
  • 25
    • 79951826100 scopus 로고    scopus 로고
    • Proportional lot-sizing and scheduling problem with identical parallel machines
    • W. Kaczmarczyk Proportional lot-sizing and scheduling problem with identical parallel machines International Journal of Production Research 49 9 2011 2605 2623
    • (2011) International Journal of Production Research , vol.49 , Issue.9 , pp. 2605-2623
    • Kaczmarczyk, W.1
  • 26
    • 0032652235 scopus 로고    scopus 로고
    • Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
    • S. Kang, K. Malik, and L.J. Thomas Lotsizing and scheduling on parallel machines with sequence-dependent setup costs Management Science 45 2 1999 273 289
    • (1999) Management Science , vol.45 , Issue.2 , pp. 273-289
    • Kang, S.1    Malik, K.2    Thomas, L.J.3
  • 27
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • DOI 10.1016/S0305-0483(03)00059-8, PII S0305048303000598
    • B. Karimi, S.M.T. Fatemi Ghomi, and J.M. Wilson The capacitated lot sizing problem: a review of models and algorithms Omega 31 5 2003 365 378 (Pubitemid 37007074)
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 28
    • 0001625702 scopus 로고
    • A patching algorithm for the nonsymmetric traveling-salesman problem
    • R.M. Karp A patching algorithm for the nonsymmetric traveling-salesman problem SIAM Journal on Computing 8 4 1979 561 573
    • (1979) SIAM Journal on Computing , vol.8 , Issue.4 , pp. 561-573
    • Karp, R.M.1
  • 29
    • 79951819561 scopus 로고    scopus 로고
    • Thesis for the Degree of Master of Science. The Graduate School of Natural and Applied Sciences - Middle East Technical University, Ancara - Turquia
    • Koçlar, A.; 2005. The General Lot Sizing and Scheduling Problem with Sequence Dependent Changeovers. Thesis for the Degree of Master of Science. The Graduate School of Natural and Applied Sciences - Middle East Technical University, Ancara - Turquia.
    • (2005) The General Lot Sizing and Scheduling Problem with Sequence Dependent Changeovers
    • Koçlar, A.1
  • 30
    • 61449139202 scopus 로고    scopus 로고
    • An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
    • A. Kovàcs, K.N. Brown, and S.A. Tarim An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups International Journal of Production Economics 118 1 2009 282 291
    • (2009) International Journal of Production Economics , vol.118 , Issue.1 , pp. 282-291
    • Kovàcs, A.1    Brown, K.N.2    Tarim, S.A.3
  • 31
    • 68949192365 scopus 로고    scopus 로고
    • Combining process selection and lot sizing models for production scheduling of electrofused grains
    • J.R. Luche, R. Morabito, and V. Pureza Combining process selection and lot sizing models for production scheduling of electrofused grains Asia-Pacific Journal of Operational Research 26 2009 421 443
    • (2009) Asia-Pacific Journal of Operational Research , vol.26 , pp. 421-443
    • Luche, J.R.1    Morabito, R.2    Pureza, V.3
  • 32
    • 33846881607 scopus 로고    scopus 로고
    • Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
    • F. Marinelli, M.E. Nenni, and A. Sforza Capacitated lot sizing and scheduling with parallel machines and shared buffers: a case study in a packaging company Annals of Operations Research 150 1 2007 177 192
    • (2007) Annals of Operations Research , vol.150 , Issue.1 , pp. 177-192
    • Marinelli, F.1    Nenni, M.E.2    Sforza, A.3
  • 33
    • 77955925568 scopus 로고    scopus 로고
    • Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
    • G.R. Mateus, M.G. Ravetti, M.C. Souza, and T.M. Valeriano Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration Journal of Scheduling 13 3 2010 245 259
    • (2010) Journal of Scheduling , vol.13 , Issue.3 , pp. 245-259
    • Mateus, G.R.1    Ravetti, M.G.2    Souza, M.C.3    Valeriano, T.M.4
  • 34
    • 79958772189 scopus 로고    scopus 로고
    • Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups
    • A. Menezes, A. Clark, and B. Almada-Lobo Capacitated lotsizing and scheduling with sequence-dependent, period overlapping and non triangular setups Journal of Scheduling 14 2011 209 219
    • (2011) Journal of Scheduling , vol.14 , pp. 209-219
    • Menezes, A.1    Clark, A.2    Almada-Lobo, B.3
  • 35
    • 0036604813 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling on parallel machines
    • DOI 10.1016/S0377-2217(01)00373-3, PII S0377221701003733
    • H. Meyr Simultaneous lotsizing and scheduling on parallel machines European Journal of Operational Research 139 2 2002 277 292 (Pubitemid 34201239)
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 277-292
    • Meyr, H.1
  • 36
    • 0033903519 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
    • DOI 10.1016/S0377-2217(99)00159-9
    • H. Meyr Simultaneous lotsizing and scheduling by combining local search with dual reoptimization European Journal of Operational Research 120 2 2000 311 326 (Pubitemid 30542650)
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 311-326
    • Meyr, H.1
  • 38
    • 44949142877 scopus 로고    scopus 로고
    • Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms
    • P. Robinson, A. Narayanan, and F. Sahin Coordinated deterministic dynamic demand lot-sizing problem: a review of models and algorithms Omega 37 1 2009 3 15
    • (2009) Omega , vol.37 , Issue.1 , pp. 3-15
    • Robinson, P.1    Narayanan, A.2    Sahin, F.3
  • 39
    • 0036656916 scopus 로고    scopus 로고
    • On tightening the relaxations of MillerTuckerZemlin formulations for asymmetric traveling salesman problems
    • H.D. Sherali, and P.J. Driscoll On tightening the relaxations of MillerTuckerZemlin formulations for asymmetric traveling salesman problems Operations Research 50 4 2002 656 669
    • (2002) Operations Research , vol.50 , Issue.4 , pp. 656-669
    • Sherali, H.D.1    Driscoll, P.J.2
  • 40
    • 78649635846 scopus 로고    scopus 로고
    • Multi-level single machine lot-sizing and scheduling with zero lead times
    • H. Stadtler Multi-level single machine lot-sizing and scheduling with zero lead times European Journal of Operational Research 209 3 2011 241 252
    • (2011) European Journal of Operational Research , vol.209 , Issue.3 , pp. 241-252
    • Stadtler, H.1
  • 41
    • 77949653622 scopus 로고    scopus 로고
    • Lot-sizing and scheduling problem with earliness tardiness and setup penalties
    • W. Supithak, S.D. Liman, and E.J. Montes Lot-sizing and scheduling problem with earliness tardiness and setup penalties Computers & Industrial Engineering 58 3 2010 363 372
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.3 , pp. 363-372
    • Supithak, W.1    Liman, S.D.2    Montes, E.J.3
  • 42
    • 41549111411 scopus 로고    scopus 로고
    • Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
    • DOI 10.1016/j.ijpe.2007.10.001, PII S092552730700299X
    • H. Tempelmeier, and L. Buschkühl Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource International Journal of Production Economics 113 2008 401 412 (Pubitemid 351467151)
    • (2008) International Journal of Production Economics , vol.113 , Issue.1 , pp. 401-412
    • Tempelmeier, H.1    Buschkuhl, L.2
  • 43
    • 33748422386 scopus 로고    scopus 로고
    • A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
    • DOI 10.1016/j.ejor.2005.06.029, PII S0377221705005321
    • F.M.B. Toledo, and V.A. Armentano A Lagrangian-based heuristic for the capacitated lot sizing problem in parallel machines European Journal of Operational Research 175 2006 1070 1083 (Pubitemid 44345095)
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 1070-1083
    • Toledo, F.M.B.1    Armentano, V.A.2
  • 44
    • 34547445625 scopus 로고    scopus 로고
    • Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes
    • C.F.M. Toledo, P.M. França, R. Morabito, and A. Kimms Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes Pesquisa Operacional 27 1 2007 155 186
    • (2007) Pesquisa Operacional , vol.27 , Issue.1 , pp. 155-186
    • Toledo, C.F.M.1    França, P.M.2    Morabito, R.3    Kimms, A.4
  • 45
    • 68949180552 scopus 로고    scopus 로고
    • A multi-population genetic algorithm to solve the synchronized and integrated two-level lot-sizing and scheduling problem
    • C.F.M. Toledo, P.M. França, R. Morabito, and A. Kimms A multi-population genetic algorithm to solve the synchronized and integrated two-level lot-sizing and scheduling problem International Journal of Production Research 47 11 2009 3097 3119
    • (2009) International Journal of Production Research , vol.47 , Issue.11 , pp. 3097-3119
    • Toledo, C.F.M.1    França, P.M.2    Morabito, R.3    Kimms, A.4
  • 48
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • DOI 10.1080/07408170600559706, PII J784373L461611VQ
    • X.Y. Zhu, and W.E. Wilhelm Scheduling and lot sizing with sequence-dependent setup: a literature review IIE Transactions 38 11 2006 987 1007 (Pubitemid 44355862)
    • (2006) IIE Transactions (Institute of Industrial Engineers) , vol.38 , Issue.11 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.