메뉴 건너뛰기




Volumn 104, Issue 2, 2006, Pages 308-316

Simultaneous lot sizing and scheduling for multi-product multi-level production

Author keywords

Lot sizing and scheduling; Multi product multi level production; Production planning

Indexed keywords

JOB ANALYSIS; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING; THROUGHPUT;

EID: 33748884885     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.04.011     Document Type: Article
Times cited : (75)

References (14)
  • 1
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacitated constrained mrp systems: review, formulation and problem reduction
    • Billington P.J., McClain J.O., and Thomas L.J. Mathematical programming approaches to capacitated constrained mrp systems: review, formulation and problem reduction. Management Science 29 10 (1983) 1126-1141
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 3
    • 0023456043 scopus 로고
    • Solving multi-item capacitated lot-sizing problems using variable redefinition
    • Eppen G.D., and Martin R.K. Solving multi-item capacitated lot-sizing problems using variable redefinition. Operations Research 35 6 (1987) 832-848
    • (1987) Operations Research , vol.35 , Issue.6 , pp. 832-848
    • Eppen, G.D.1    Martin, R.K.2
  • 5
    • 0008655177 scopus 로고    scopus 로고
    • The general lotsizing and scheduling problem
    • Fleischmann B., and Meyr H. The general lotsizing and scheduling problem. OR Spektrum 19 (1997) 11-21
    • (1997) OR Spektrum , vol.19 , pp. 11-21
    • Fleischmann, B.1    Meyr, H.2
  • 6
    • 33748900120 scopus 로고    scopus 로고
    • Gutenberg, E., 1983. Grundlagen der Betriebswirtschaftslehre, Band I: Die Produktion, 24. Aufl., Berlin et al.
  • 7
    • 0010775487 scopus 로고    scopus 로고
    • Capacitated lot-sizing with sequence dependent setup costs
    • Haase K. Capacitated lot-sizing with sequence dependent setup costs. OR Spektrum 18 (1996) 51-59
    • (1996) OR Spektrum , vol.18 , pp. 51-59
    • Haase, K.1
  • 8
    • 33748883293 scopus 로고    scopus 로고
    • Kimms, A., 1993. Multi-level, single-machine lot sizing and scheduling (with initial inventory). Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel, No. 329, Kiel.
  • 9
    • 0042824640 scopus 로고    scopus 로고
    • Multi-level, single-machine lotsizing and scheduling (with initial inventory)
    • Kimms A. Multi-level, single-machine lotsizing and scheduling (with initial inventory). European Journal of Operational Research 89 (1996) 86-99
    • (1996) European Journal of Operational Research , vol.89 , pp. 86-99
    • Kimms, A.1
  • 10
    • 33748883667 scopus 로고    scopus 로고
    • Kimms, A., Drexl, A., 1996. Some insights into proportional lotsizing and scheduling. Manuskripte aus den Instituten der Universität Kiel, No. 406, Kiel.
  • 12
    • 0033903519 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
    • Meyr H. Simultaneous lotsizing and scheduling by combining local search with dual reoptimization. European Journal of Operational Research 120 (2000) 311-326
    • (2000) European Journal of Operational Research , vol.120 , pp. 311-326
    • Meyr, H.1
  • 13
    • 33748895772 scopus 로고    scopus 로고
    • Stammen-Hegener, C., 2002. Simultane Losgrößen- and Reihenfolgeplanung bei ein- and mehrstufiger Fertigung, Wiesbaden.
  • 14
    • 0012489199 scopus 로고
    • Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen and genereller Erzeugnisstruktur
    • Tempelmeier H., and Derstrof M. Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen and genereller Erzeugnisstruktur. OR Spektrum 15 (1993) 63-73
    • (1993) OR Spektrum , vol.15 , pp. 63-73
    • Tempelmeier, H.1    Derstrof, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.