-
1
-
-
78650068281
-
Multiple machine continuous setup lotsizing with sequencedependent setups
-
DOI 10.1007/s10589-009-9235-8
-
Almada-Lobo, B., et al., 2009. Multiple machine continuous setup lotsizing with sequencedependent setups. Computational Optimization and Applications. DOI 10.1007/s10589-009-9235-8.
-
(2009)
Computational Optimization and Applications.
-
-
Almada-Lobo, B.1
-
2
-
-
0035410522
-
Modelling practical lot-sizing problems as mixed-integer programs
-
Belvaux, G. and Wolsey, L.A., 2001. Modelling practical lot-sizing problems as mixed integer progr (Pubitemid 34192821)
-
(2001)
Management Science
, vol.47
, Issue.7
, pp. 993-1007
-
-
Belvaux, G.1
Wolsey, L.A.2
-
3
-
-
13844298234
-
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
-
DOI 10.1016/j.cor.2004.04.012, PII S0305054804000899
-
Dastidar, S.G. and Nagi, R., 2005. Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs. Computers & Operations Research, 32 (11), 2987-3005. (Pubitemid 40244558)
-
(2005)
Computers and Operations Research
, vol.32
, Issue.11
, pp. 2987-3005
-
-
Ghosh Dastidar, S.1
Nagi, R.2
-
4
-
-
0031170482
-
Lot sizing and scheduling-survey and extensions
-
Drexl, A. and Kimms, A., 1997. Lot sizing and scheduling-survey and extensions. European Journal of Operational Research, 99 (2), 221-235.
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.2
, pp. 221-235
-
-
Drexl, A.1
Kimms, A.2
-
5
-
-
0023456043
-
SOLVING MULTI-ITEM CAPACITATED LOT-SIZING PROBLEMS USING VARIABLE REDEFINITION
-
Eppen, G.D. and Martin, R.K., 1987. Solving multi-item lot-sizing problems using variable redefinition. Operations Research, 35 (6), 832-848. (Pubitemid 18608631)
-
(1987)
Operations Research
, vol.35
, Issue.6
, pp. 832-848
-
-
Eppen Gary, D.1
Martin R.Kipp2
-
6
-
-
21344476870
-
Lotsizing and scheduling for production planning
-
Berlin, Springer-Verlag. IBM ILOG CPLEX 11 Parameters, Reference Manual
-
Haase, K., 1994. Lotsizing and scheduling for production planning, Lecture notes in economics and mathematical systems, Vol. 408, Berlin, Springer-Verlag. IBM ILOG, 2007. CPLEX 11 Parameters, Reference Manual.
-
(1994)
Lecture Notes in Economics and Mathematical Systems
, vol.408
, pp. 2007
-
-
Haase, K.1
-
7
-
-
67649921386
-
Solving lot-sizing problems on parallel identical machines using symmetry-breaking constraints
-
Jans, R., 2009. Solving lot-sizing problems on parallel identical machines using symmetry-breaking constraints. INFORMS Journal on Computing, 21 (1), 123-136.
-
(2009)
INFORMS Journal on Computing
, vol.21
, Issue.1
, pp. 123-136
-
-
Jans, R.1
-
8
-
-
36448995797
-
Modeling industrial lot sizing problems: A review
-
DOI 10.1080/00207540600902262, PII 770289062
-
Jans, R. and Degraeve, Z., 2008. Modeling industrial lot sizing problems: a review. International Journal of Production Research, 46 (6), 1619-1643. (Pubitemid 350161679)
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1619-1643
-
-
Jans, R.1
Degraeve, Z.2
-
9
-
-
79951848189
-
Partial coordination may increase overall costs in supply chains
-
Kaczmarczyk, W., 2008b. Partial coordination may increase overall costs in supply chains. Decision Making in Manufacturing and Services, 2 (1-2), 47-62.
-
(2008)
Decision Making in Manufacturing and Services
, vol.2
, Issue.1-2
, pp. 47-62
-
-
Kaczmarczyk, W.1
-
10
-
-
67651178676
-
Production planning and coordination in customer driven supply chains
-
Warsaw: Komitet Transportu Polskiej Akademii Nauk
-
Kaczmarczyk, W., et al., 2006. Production planning and coordination in customer driven supply chains. Wybrane Zagadnienia Logistyki Stosowanej. Vol. 3, Warsaw: Komitet Transportu Polskiej Akademii Nauk, 81-89.
-
(2006)
Wybrane Zagadnienia Logistyki Stosowanej.
, vol.3
, pp. 81-89
-
-
Kaczmarczyk, W.1
-
11
-
-
0022022738
-
DETERMINISTIC DYNAMIC PRODUCT CYCLING PROBLEM
-
Karmarkar, U.S. and Schrage, L., 1985. The Deterministic Dynamic Product Cycling Problem. Operations Research, 33 (2), 326-345. (Pubitemid 16471414)
-
(1985)
Operations Research
, vol.33
, Issue.2
, pp. 326-345
-
-
Karmarkar Uday, S.1
Schrage Linus2
-
12
-
-
0041175224
-
Proportional lot sizing and scheduling: Some extensions
-
Kimms, A. and Drexl, A., 1998. Proportional lot sizing and scheduling: some extensions. Networks, 32 (2), 85-101. (Pubitemid 128364727)
-
(1998)
Networks
, vol.32
, Issue.2
, pp. 85-101
-
-
Kimms, A.1
Drexl, A.2
-
13
-
-
0015095281
-
An efficient algorithm for multi-item scheduling
-
Lasdon, L. and Terjung, R., 1971. An efficient algorithm for multi-item scheduling. Operations Research, 19 (4), 946-969.
-
(1971)
Operations Research
, vol.19
, Issue.4
, pp. 946-969
-
-
Lasdon, L.1
Terjung, R.2
-
14
-
-
0036604813
-
Simultaneous lotsizing and scheduling on parallel machines
-
DOI 10.1016/S0377-2217(01)00373-3, PII S0377221701003733
-
Meyr, H., 2002. Simultaneous lotsizing and scheduling on parallel machines. European Journal of OperationalResearch, 139 (2), 277-292. (Pubitemid 34201239)
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 277-292
-
-
Meyr, H.1
-
16
-
-
67649794649
-
Capacitated lot-sizing and scheduling with parallel machines, backorders, and setup carry-over
-
Quadt, D. and Kuhn, H., 2009. Capacitated lot-sizing and scheduling with parallel machines, backorders, and setup carry-over. Naval Research Logistics, 56 (4), 366-384.
-
(2009)
Naval Research Logistics
, vol.56
, Issue.4
, pp. 366-384
-
-
Quadt, D.1
Kuhn, H.2
-
17
-
-
34247897041
-
Multi-objective master production scheduling in make-to-order manufacturing
-
DOI 10.1080/00207540600847152, PII 778110131
-
Sawik, T., 2007. Multi-objective master production scheduling in make-to-order manufacturing. International Journal of Production Research, 45 (12), 2629-2653. (Pubitemid 46693173)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.12
, pp. 2629-2653
-
-
Sawik, T.1
-
19
-
-
67651187320
-
Monolithic versus hierarchical approach to integrated scheduling in a supply chain
-
Sawik, T., 2009b. Monolithic versus hierarchical approach to integrated scheduling in a supply chain. International Journal of Production Research, 47 (21), 5881-5910.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.21
, pp. 5881-5910
-
-
Sawik, T.1
-
20
-
-
70449595763
-
Multi-objective due-date setting in a make-to-order environment
-
Sawik, T., 2009c. Multi-objective due-date setting in a make-to-order environment. International Journal of Production Research, 47 (22), 6205-6231.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.22
, pp. 6205-6231
-
-
Sawik, T.1
-
21
-
-
33746333266
-
Modeling of period overlapping setup times
-
DOI 10.1016/j.ejor.2005.03.033, PII S0377221705003772
-
Suerie, C., 2006. Modeling of period overlapping setup times. European Journal of Operational Research, 174 (2), 874-886. (Pubitemid 44109942)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.2
, pp. 874-886
-
-
Suerie, C.1
-
22
-
-
41549111411
-
Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
-
DOI 10.1016/j.ijpe.2007.10.001, PII S092552730700299X
-
Tempelmeier, H. and Buschkuhl, L., 2008. Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. International Journal of Production Economics, 113 (1), 401-412. (Pubitemid 351467151)
-
(2008)
International Journal of Production Economics
, vol.113
, Issue.1
, pp. 401-412
-
-
Tempelmeier, H.1
Buschkuhl, L.2
-
23
-
-
79951830680
-
Developing and deploying electronics assembly line optimization tools: A motorola case study
-
Tirpak, T.M., 2008. Developing and deploying electronics assembly line optimization tools: A motorola case study. Decision Making in Manufacturing and Services, 2 (12), 63-78.
-
(2008)
Decision Making in Manufacturing and Services
, vol.2
, Issue.12
, pp. 63-78
-
-
Tirpak, T.M.1
-
24
-
-
84974870120
-
Valid inequalities for the Lasdon-Terjung production model
-
Vanderbeck, F. and Wolsey, L.A., 1992. Valid inequalities for the Lasdon-Terjung production model. Journal of the Operational Research Society, 43 (5), 435-441.
-
(1992)
Journal of the Operational Research Society
, vol.43
, Issue.5
, pp. 435-441
-
-
Vanderbeck, F.1
Wolsey, L.A.2
-
25
-
-
0024735945
-
Uncapacitated lot-sizing problems with start-up costs
-
Wolsey, L.A., 1989. Uncapacitated lot-sizing problems with start-up costs. Operations Research, 37 (5), 741-747.
-
(1989)
Operations Research
, vol.37
, Issue.5
, pp. 741-747
-
-
Wolsey, L.A.1
-
26
-
-
0031139978
-
MIP modelling of changeovers in production planning and scheduling problems
-
PII S03772217962940
-
Wolsey, L.A., 1997. MIP modelling of changeovers in production planning and scheduling problems. European Journal ofOperational Research, 99 (1), 154-165. (Pubitemid 127443697)
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.1
, pp. 154-165
-
-
Wolsey, L.A.1
|