-
1
-
-
0036643163
-
Dynamic lot sizing and tool management in automated manufacturing systems
-
DOI 10.1016/S0305-0548(00)00103-9, PII S0305054800001039
-
Akturk, M. and Onen, S., 2002. Dynamic lot sizing and tool management in automated manufacturing systems. Computers & Operations Research, 29 (8), 1059-1079. (Pubitemid 34196081)
-
(2002)
Computers and Operations Research
, vol.29
, Issue.8
, pp. 1059-1079
-
-
Akturk M.Selim1
Onen, S.2
-
2
-
-
34548460398
-
Single machine multi-product capacitated lot sizing with sequence-dependent setups
-
DOI 10.1080/00207540601094465, PII 772294284
-
Almada-Lobo, B., et al., 2007. Single machine multi-product capacitated lot sizing with sequencedependent setups. International Journal of Production Research, 45 (20), 4873-4894. (Pubitemid 47352796)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.20
, pp. 4873-4894
-
-
Almada-Lobo, B.1
Klabjan, D.2
Carravilla, M.A.3
Oliveira, J.F.4
-
3
-
-
35248840078
-
A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
-
DOI 10.1016/j.cor.2006.08.019, PII S0305054806002012
-
Almada-Lobo, B., Carravilla, M., and Oliveira, J., 2008. A note on 'The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times'. Computers & Operations Research, 35 (4), 1374-1376. (Pubitemid 47558962)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.4
, pp. 1374-1376
-
-
Almada-Lobo, B.1
Oliveira, J.F.2
Antonia Carravilla, M.3
-
4
-
-
45449120446
-
Production planning and scheduling in the glass container industry: A VNS approach
-
Almada-Lobo, B., Oliveira, J., and Carravilla, M., 2008b. Production planning and scheduling in the glass container industry: A VNS approach. International Journal of Production Economics, 114 (1), 363-375.
-
(2008)
International Journal of Production Economics
, vol.114
, Issue.1
, pp. 363-375
-
-
Almada-Lobo, B.1
Oliveira, J.2
Carravilla, M.3
-
5
-
-
0020832935
-
Mathematical programming approaches to capacity-constrained mrp systems: Review, formulation and problem reduction
-
Billington, P., McClain, J., and Thomas, L., 1983. Mathematical programming approach to capacity-constrained MRP systems: Review, formulation and problem reduction. Management Science, 29 (10), 1126-1141. (Pubitemid 14468571)
-
(1983)
Management Science
, vol.39
, Issue.10
, pp. 1126-1141
-
-
Billington Peter, J.1
McClain John, O.2
Thomas L.Joseph3
-
6
-
-
77349118693
-
Dynamic capacitated lot-sizing problems: A classification and review of solution approaches
-
Buschkü hl, L., et al., 2010. Dynamic capacitated lot-sizing problems: A classification and review of solution approaches. OR Spectrum, 32 (2), 231-261.
-
(2010)
OR Spectrum
, vol.32
, Issue.2
, pp. 231-261
-
-
Buschkühl, L.1
-
7
-
-
13844298234
-
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
-
DOI 10.1016/j.cor.2004.04.012, PII S0305054804000899
-
Dastidar, S. and Nagi, R., 2005. Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs. Computers & Operations Research, 32 (11), 2987-3005. (Pubitemid 40244558)
-
(2005)
Computers and Operations Research
, vol.32
, Issue.11
, pp. 2987-3005
-
-
Ghosh Dastidar, S.1
Nagi, R.2
-
8
-
-
0031170482
-
Lot sizing and scheduling - Survey and extensions
-
PII S0377221797000301
-
Drexl, A. and Kimms, A., 1997. Lot sizing and scheduling - survey and extensions. European Journal of Operational Research, 99 (2), 221-235. (Pubitemid 127418431)
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.2
, pp. 221-235
-
-
Drexl, A.1
Kimms, A.2
-
9
-
-
1342287292
-
Scheduling of wafer test processes in semiconductor manufacturing
-
Ellis, K.P., Lu, Y., and Bish, E.K., 2004. Scheduling of wafer test processes in semiconductor manufacturing. International Journal of Production Research, 42 (2), 215-242.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.2
, pp. 215-242
-
-
Ellis, K.P.1
Lu, Y.2
Bish, E.K.3
-
10
-
-
58149250389
-
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
-
Ferreira, D., Morabito, R., and Rangel, S., 2009. Solution approaches for the soft drink integrated production lot sizing and scheduling problem. European Journal of Operational Research, 196 (2), 697-706.
-
(2009)
European Journal of Operational Research
, vol.196
, Issue.2
, pp. 697-706
-
-
Ferreira, D.1
Morabito, R.2
Rangel, S.3
-
11
-
-
0008655177
-
The general lotsizing and scheduling problem
-
Fleischmann, B. and Meyr, H., 1997. The general lotsizing and scheduling problem. OR Spektrum, 19, 11-21.
-
(1997)
OR Spektrum
, vol.19
, pp. 11-21
-
-
Fleischmann, B.1
Meyr, H.2
-
12
-
-
0010775487
-
Capacitated lot-sizing with sequence dependent setup costs
-
Haase, K., 1996. Capacitated lot-sizing with sequence dependent setup costs. Operations Research Spektrum, 18, 51-59.
-
(1996)
Operations Research Spektrum
, vol.18
, pp. 51-59
-
-
Haase, K.1
-
13
-
-
0347899318
-
An industrial extension of the discrete lot-iszing and scheduling problem
-
Jans, R. and Degraeve, Z., 2004. An industrial extension of the discrete lot-iszing and scheduling problem. IIE Transactions, 36 (1), 47-58.
-
(2004)
IIE Transactions
, vol.36
, Issue.1
, pp. 47-58
-
-
Jans, R.1
Degraeve, Z.2
-
14
-
-
36448995797
-
Modeling industrial lot sizing problems: A review
-
DOI 10.1080/00207540600902262, PII 770289062
-
Jans, R. and Degraeve, Z., 2008. Modeling industrial lot sizing problems: A review. International Journal of Production Research, 46 (6), 1619-1643. (Pubitemid 350161679)
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1619-1643
-
-
Jans, R.1
Degraeve, Z.2
-
15
-
-
0032652235
-
Lotsizing and scheduling on parallel machines with sequence-dependent setup cost
-
Kang, S., Malik, K., and Thomas, L., 1999. Lotsizing and scheduling on parallel machines with sequence-dependent setup cost. Management Science, 45 (2), 273-289.
-
(1999)
Management Science
, vol.45
, Issue.2
, pp. 273-289
-
-
Kang, S.1
Malik, K.2
Thomas, L.3
-
16
-
-
0041511823
-
The capacitated lot sizing problem: A review of models and algorithms
-
DOI 10.1016/S0305-0483(03)00059-8, PII S0305048303000598
-
Karimi, B., Fatemi Ghomi, S., and Wilson, J., 2003. The capacitated lot sizing problem: Review of models and algorithms. OMEGA, 31 (5), 365-378. (Pubitemid 37007074)
-
(2003)
Omega
, vol.31
, Issue.5
, pp. 365-378
-
-
Karimi, B.1
Fatemi Ghomi, S.M.T.2
Wilson, J.M.3
-
17
-
-
79958772189
-
Capacitated lotsizing and scheduling with sequence-dependentperiod overlapping and non-triangular setups
-
Menezes, A.A., Clark, A., and Almada-Lobo, B., 2011. Capacitated lotsizing and scheduling with sequence-dependentperiod overlapping and non-triangular setups. Journal of Scheduling, 14 (2), 209-219.
-
(2011)
Journal of Scheduling
, vol.14
, Issue.2
, pp. 209-219
-
-
Menezes, A.A.1
Clark, A.2
Almada-Lobo, B.3
-
18
-
-
0036604813
-
Simultaneous lotsizing and scheduling on parallel machines
-
DOI 10.1016/S0377-2217(01)00373-3, PII S0377221701003733
-
Meyr, H., 2002. Simultaneous lotsizing and scheduling on parallel machines. European Journal of Operational Research, 139 (2), 277-292. (Pubitemid 34201239)
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 277-292
-
-
Meyr, H.1
-
19
-
-
11144322231
-
Scheduling-Framework für Jobs auf parallelen Maschinen in komplexen Produktionssystemen
-
Mönch, L., 2004. Scheduling-Framework fü r Jobs auf parallelen Maschinen in komplexen Produktionssystemen. Wirtschaftsinformatik, 46 (6), 470-480. (Pubitemid 40030836)
-
(2004)
Wirtschaftsinformatik
, vol.46
, Issue.6
, pp. 470-480
-
-
Monch, L.1
-
21
-
-
27944503347
-
Conceptual framework for lot-sizing and scheduling of flexible flow lines
-
DOI 10.1080/00207540500066762
-
Quadt, D. and Kuhn, H., 2005. Conceptual framework for lot-sizing and scheduling of flexible flow lines. International Journal of Production Research, 43 (11), 2291-2308. (Pubitemid 41663551)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.11
, pp. 2291-2308
-
-
Quadt, D.1
Kuhn, H.2
-
22
-
-
39449098494
-
Capacitated lot-sizing with extensions: A review
-
Quadt, D. and Kuhn, H., 2008. Capacitated lot-sizing with extensions: A review. 4OR, 6 (1), 61-83.
-
(2008)
4OR
, vol.6
, Issue.1
, pp. 61-83
-
-
Quadt, D.1
Kuhn, H.2
-
23
-
-
0141675994
-
The capacitated lot-sizing problems with linked lot sizes
-
Suerie, C. and Stadtler, H., 2003. The capacitated lot-sizing problems with linked lot sizes. Management Science, 49 (8), 1039-1054.
-
(2003)
Management Science
, vol.49
, Issue.8
, pp. 1039-1054
-
-
Suerie, C.1
Stadtler, H.2
-
24
-
-
41549111411
-
Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
-
DOI 10.1016/j.ijpe.2007.10.001, PII S092552730700299X
-
Tempelmeier, H. and Buschkü hl, L., 2008. Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. International Journal of Production Economics, 113 (1), 401-412. (Pubitemid 351467151)
-
(2008)
International Journal of Production Economics
, vol.113
, Issue.1
, pp. 401-412
-
-
Tempelmeier, H.1
Buschkuhl, L.2
-
25
-
-
68949180552
-
Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem
-
Toledo, C., et al., 2009. Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem. International Journal of Production Research, 47 (11), 3097-3119.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.11
, pp. 3097-3119
-
-
Toledo, C.1
|