-
1
-
-
58149236318
-
-
ABIR., Associação Brasileira das Indústrias de Refrigerantes e de Bebidas Não Alcoólicas, Dados de Mercado, available at: http://www.abir.gov.br (last visit 01/02/2007).
-
ABIR., Associação Brasileira das Indústrias de Refrigerantes e de Bebidas Não Alcoólicas, Dados de Mercado, available at: http://www.abir.gov.br (last visit 01/02/2007).
-
-
-
-
2
-
-
34547145422
-
Joint rolling-horizon scheduling of materials processing and lot sizing with sequence-dependent setups
-
Araujo S.A., Arenales M.N., and Clark A.R. Joint rolling-horizon scheduling of materials processing and lot sizing with sequence-dependent setups. Journal of Heuristics 13 (2007) 337-358
-
(2007)
Journal of Heuristics
, vol.13
, pp. 337-358
-
-
Araujo, S.A.1
Arenales, M.N.2
Clark, A.R.3
-
3
-
-
0020194024
-
Computational complexity of the lot size problem
-
Bitran G.R., and Yanasse H.H. Computational complexity of the lot size problem. Management Science 28 10 (1982) 1174-1186
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
4
-
-
0346724484
-
Hybrid heuristics for planning lot setups and sizes
-
Clark A.R. Hybrid heuristics for planning lot setups and sizes. Computers & Industrial Engineering 45 (2003) 545-562
-
(2003)
Computers & Industrial Engineering
, vol.45
, pp. 545-562
-
-
Clark, A.R.1
-
5
-
-
0028769399
-
On practical resource allocation for production planning and scheduling with period overlapping setups
-
Dillenberger C., Escudero L.F., and Wu Zhang A.W. On practical resource allocation for production planning and scheduling with period overlapping setups. European Journal of Operational Research 75 (1994) 275-286
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 275-286
-
-
Dillenberger, C.1
Escudero, L.F.2
Wu Zhang, A.W.3
-
7
-
-
28244454159
-
On a fix-and-relax framework for a class of project scheduling problems
-
Escudero L.F., and Salmeron J. On a fix-and-relax framework for a class of project scheduling problems. Annals of Operations Research 140 (2005) 163-188
-
(2005)
Annals of Operations Research
, vol.140
, pp. 163-188
-
-
Escudero, L.F.1
Salmeron, J.2
-
8
-
-
38549131391
-
Progressive interval heuristics for multi-item capacitated lot sizing problems
-
Federgruen A., Meissner J., and Tzur M. Progressive interval heuristics for multi-item capacitated lot sizing problems. Operations Research 55 3 (2007) 490-502
-
(2007)
Operations Research
, vol.55
, Issue.3
, pp. 490-502
-
-
Federgruen, A.1
Meissner, J.2
Tzur, M.3
-
9
-
-
58149220747
-
-
Ferreira, D., 2006. Abordagens para o problema integrado de dimensionamento e sequenciamento de lotes da produção de bebidas, Ph.D. Thesis, Universidade Federal de São Carlos, Departamento de Engenharia de Produção, Brazil.
-
Ferreira, D., 2006. Abordagens para o problema integrado de dimensionamento e sequenciamento de lotes da produção de bebidas, Ph.D. Thesis, Universidade Federal de São Carlos, Departamento de Engenharia de Produção, Brazil.
-
-
-
-
10
-
-
0008655177
-
The general lot sizing and scheduling problem
-
Fleischmann B., and Meyr H. The general lot sizing and scheduling problem. OR Spektrum 19 (1997) 11-21
-
(1997)
OR Spektrum
, vol.19
, pp. 11-21
-
-
Fleischmann, B.1
Meyr, H.2
-
12
-
-
0003404231
-
-
The Scientific Press, Danvers, Massachusetts
-
Fourer R., Gay M.D., and Kernighan B.W. AMPL - A Modeling Language for Mathematical Programming (1993), The Scientific Press, Danvers, Massachusetts
-
(1993)
AMPL - A Modeling Language for Mathematical Programming
-
-
Fourer, R.1
Gay, M.D.2
Kernighan, B.W.3
-
13
-
-
58149259823
-
-
ILOG - ILOG CPLEX, Mathematical Programming Optimizers, version 10.0, 2006.
-
ILOG - ILOG CPLEX, Mathematical Programming Optimizers, version 10.0, 2006.
-
-
-
-
15
-
-
58149217788
-
-
Luche, J.R., Morabito, R., Pureza, V., submitted for publication. Combining process selection and lot sizing models for the production scheduling of electrofused grains.
-
Luche, J.R., Morabito, R., Pureza, V., submitted for publication. Combining process selection and lot sizing models for the production scheduling of electrofused grains.
-
-
-
-
16
-
-
0033903519
-
Simultaneous lot sizing and scheduling by combining local search with dual reoptimization
-
Meyr H. Simultaneous lot sizing and scheduling by combining local search with dual reoptimization. European Journal of Operational Research 120 (2000) 311-326
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 311-326
-
-
Meyr, H.1
-
17
-
-
0036604813
-
Simultaneous lot sizing and scheduling on parallel production lines
-
Meyr H. Simultaneous lot sizing and scheduling on parallel production lines. European Journal of Operational Research 39 (2002) 277-292
-
(2002)
European Journal of Operational Research
, vol.39
, pp. 277-292
-
-
Meyr, H.1
-
18
-
-
58149239519
-
-
Montag, L., 2005. Global soft beverage industry, Moody's Investors Service, Inc., August 2005. available at: http://www.moodys.com.br/brasil/pdf/soft%20beverage.pdf (last visit: June, 2007).
-
Montag, L., 2005. Global soft beverage industry, Moody's Investors Service, Inc., August 2005. available at: http://www.moodys.com.br/brasil/pdf/soft%20beverage.pdf (last visit: June, 2007).
-
-
-
-
19
-
-
26944479655
-
Hybrid tabu search for lot sizing problems
-
Blesa M., Blum C., Roli A., and Sampels M. (Eds), Springer, Berlin/Heidelberg
-
Pedroso J.P., and Kubo M. Hybrid tabu search for lot sizing problems. In: Blesa M., Blum C., Roli A., and Sampels M. (Eds). Lecture Notes in Computer Science vol. 3636 (2005), Springer, Berlin/Heidelberg 66-77
-
(2005)
Lecture Notes in Computer Science
, vol.3636
, pp. 66-77
-
-
Pedroso, J.P.1
Kubo, M.2
-
22
-
-
58149254100
-
-
Toledo, C.F.M., 2005. Problema conjunto de dimensionamento de lotes e programação da produção, Ph.D. Thesis, Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica e Computação, Brazil.
-
Toledo, C.F.M., 2005. Problema conjunto de dimensionamento de lotes e programação da produção, Ph.D. Thesis, Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica e Computação, Brazil.
-
-
-
-
23
-
-
33748422386
-
A Lagrangian-based heuristic for the capacitated lot sizing problem in parallel machines
-
Toledo F.M.B., and Armentano V.A. A Lagrangian-based heuristic for the capacitated lot sizing problem in parallel machines. European Journal of Operational Research 175 (2006) 1070-1083
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 1070-1083
-
-
Toledo, F.M.B.1
Armentano, V.A.2
-
24
-
-
58149219443
-
-
Toledo, C.F.M., França, P.M., Kimms, A., Morabito, R., submitted for publication. A mathematical model for the synchronized and integrated two-level lot sizing and scheduling problem.
-
Toledo, C.F.M., França, P.M., Kimms, A., Morabito, R., submitted for publication. A mathematical model for the synchronized and integrated two-level lot sizing and scheduling problem.
-
-
-
-
25
-
-
58149259292
-
-
Toledo, C.F.M., França, P.M., Morabito, R., Kimms, A., in press. A multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem. International Journal of Production Research.
-
Toledo, C.F.M., França, P.M., Morabito, R., Kimms, A., in press. A multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem. International Journal of Production Research.
-
-
-
-
26
-
-
58149249659
-
-
Toso, E.A.V., Morabito, R., Clark, A.R., submitted for publication. Production setup-sequencing and lot sizing through ATSP subtour elimination and patching.
-
Toso, E.A.V., Morabito, R., Clark, A.R., submitted for publication. Production setup-sequencing and lot sizing through ATSP subtour elimination and patching.
-
-
-
|