메뉴 건너뛰기




Volumn 66, Issue 2, 2000, Pages 159-169

Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; INTEGER PROGRAMMING; INVENTORY CONTROL; MATHEMATICAL MODELS; OPERATIONS RESEARCH; PLANNING; PROBLEM SOLVING; PRODUCTION CONTROL; SCHEDULING;

EID: 0033690423     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(99)00119-X     Document Type: Article
Times cited : (103)

References (11)
  • 1
    • 0042264308 scopus 로고
    • The multiproduct lot scheduling problem
    • in: M.A.H. Dempster et al. (Eds.), Dordrecht/Holland
    • L. Schrage, The multiproduct lot scheduling problem, in: M.A.H. Dempster et al. (Eds.), Deterministic and Stocastic Scheduling, Dordrecht/Holland, 1982, pp. 233-244.
    • (1982) Deterministic and Stocastic Scheduling , pp. 233-244
    • Schrage, L.1
  • 2
    • 0028769382 scopus 로고
    • The discrete lot-sizing and scheduling problem with sequence-dependent setup-costs
    • Fleischmann B. The discrete lot-sizing and scheduling problem with sequence-dependent setup-costs. European Journal of Operational Research. 75:1994;395-404.
    • (1994) European Journal of Operational Research , vol.75 , pp. 395-404
    • Fleischmann, B.1
  • 3
    • 0001532011 scopus 로고    scopus 로고
    • Solving the discrete lotsizing and scheduling with sequence dependent set-up costs and set-up times using the Travelling Salesman Problem with time windows
    • Salomon M., Solomon M.M., Van Wassenhove L.N., Dumas Y.D., Dauzere-Peres S. Solving the discrete lotsizing and scheduling with sequence dependent set-up costs and set-up times using the Travelling Salesman Problem with time windows. European Journal of Operational Research. 100:1997;494-513.
    • (1997) European Journal of Operational Research , vol.100 , pp. 494-513
    • Salomon, M.1    Solomon, M.M.2    Van Wassenhove, L.N.3    Dumas, Y.D.4    Dauzere-Peres, S.5
  • 4
    • 0032069649 scopus 로고    scopus 로고
    • Lotsizing and scheduling by batch sequencing
    • Jordan C., Drexl A. Lotsizing and scheduling by batch sequencing. Management Science. 44:1998;698-713.
    • (1998) Management Science , vol.44 , pp. 698-713
    • Jordan, C.1    Drexl, A.2
  • 6
    • 84985793300 scopus 로고
    • Joint lot sizing and scheduling of multiple items with sequence dependent setup costs
    • Dilts D.M., Ramsing K.D. Joint lot sizing and scheduling of multiple items with sequence dependent setup costs. Decision Sciences. 20:1989;120-133.
    • (1989) Decision Sciences , vol.20 , pp. 120-133
    • Dilts, D.M.1    Ramsing, K.D.2
  • 7
    • 0026895316 scopus 로고
    • The cyclic lot scheduling problem with sequence-dependent setups
    • Dobson G. The cyclic lot scheduling problem with sequence-dependent setups. Operations Research. 40:1992;736-749.
    • (1992) Operations Research , vol.40 , pp. 736-749
    • Dobson, G.1
  • 8
    • 0010775487 scopus 로고    scopus 로고
    • Capacitated lot-sizing with sequence dependent setup costs
    • Haase K. Capacitated lot-sizing with sequence dependent setup costs. OR Spektrum. 18:1996;51-59.
    • (1996) OR Spektrum , vol.18 , pp. 51-59
    • Haase, K.1
  • 9
    • 85031570393 scopus 로고    scopus 로고
    • Engpassorientierte Fertigungssteuerung bei reihenfolgeabhängigen Rüstvorgängen in einem Unternehmen der Satz- Und Drucktechnik
    • Haase K., Göpfert L. Engpassorientierte Fertigungssteuerung bei reihenfolgeabhängigen Rüstvorgängen in einem Unternehmen der Satz- und Drucktechnik. Zeitschrift für Betriebswirtschaft. 66:1996;1511-1526.
    • (1996) Zeitschrift für Betriebswirtschaft , vol.66 , pp. 1511-1526
    • Haase, K.1    Göpfert, L.2
  • 10
    • 0027582974 scopus 로고
    • A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup-times
    • Cattrysse D., Salomon M., Kuik R., Van Wassenhove L.N. A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup-times. Management Science. 39:1993;477-486.
    • (1993) Management Science , vol.39 , pp. 477-486
    • Cattrysse, D.1    Salomon, M.2    Kuik, R.3    Van Wassenhove, L.N.4
  • 11
    • 0001694846 scopus 로고    scopus 로고
    • Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing
    • Kimms A. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing. Omega. 26:1998;355-366.
    • (1998) Omega , vol.26 , pp. 355-366
    • Kimms, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.