-
1
-
-
0003515463
-
-
Prentice-Hall: Englewood Cliffs, NJ
-
Ahuja, R.K., Magnanti, T.L. and Orlin, J.B., Network Flows: Theory, Algorithms, and Applications, 1993 (Prentice-Hall: Englewood Cliffs, NJ).
-
(1993)
Network Flows: Theory, Algorithms, and Applications
-
-
Ahuja, R.K.1
Magnanti, T.L.2
Orlin, J.B.3
-
2
-
-
35248840078
-
A note on 'The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times'
-
doi: 10.1016/j.cor.2006.08.019
-
Almada-Lobo, B., Oliveira, J.F. and Carravilla, M.A., A note on 'The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times'. Comput. Oper. Res., 2006 (doi: 10.1016/j.cor.2006.08.019).
-
(2006)
Comput. Oper. Res
-
-
Almada-Lobo, B.1
Oliveira, J.F.2
Carravilla, M.A.3
-
3
-
-
0021513251
-
Strong formulations for multi-item capacitated lot sizing
-
Barany, I., Vanroy, T.J. and Wolsey, L.A., Strong formulations for multi-item capacitated lot sizing. Mgmt Sci., 1984, 30, 1255-1261.
-
(1984)
Mgmt Sci
, vol.30
, pp. 1255-1261
-
-
Barany, I.1
Vanroy, T.J.2
Wolsey, L.A.3
-
4
-
-
0034631279
-
Rolling-horizon lot-sizing when set-up times are sequence-dependent
-
Clark, A.R. and Clark, S.J., Rolling-horizon lot-sizing when set-up times are sequence-dependent. Int. J. Prod. Res., 2000, 38, 2287-2307.
-
(2000)
Int. J. Prod. Res
, vol.38
, pp. 2287-2307
-
-
Clark, A.R.1
Clark, S.J.2
-
5
-
-
0031170482
-
Lot sizing and scheduling - survey and extensions
-
Drexl, A. and Kimms, A., Lot sizing and scheduling - survey and extensions. Eur. J. oper. Res., 1997, 99, 221-235.
-
(1997)
Eur. J. oper. Res
, vol.99
, pp. 221-235
-
-
Drexl, A.1
Kimms, A.2
-
6
-
-
0034692671
-
A modified framework for modelling set-up carryover in the capacitated lotsizing problem
-
Gopalakrishnan, M., A modified framework for modelling set-up carryover in the capacitated lotsizing problem. Int. J. Prod. Res., 2000, 38, 3421-3424.
-
(2000)
Int. J. Prod. Res
, vol.38
, pp. 3421-3424
-
-
Gopalakrishnan, M.1
-
7
-
-
0035382004
-
A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover
-
Gopalakrishnan, M., Ding, K., Bourjolly, J.M. and Mohan, S., A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover. Mgmt Sci., 2001, 47, 851-863.
-
(2001)
Mgmt Sci
, vol.47
, pp. 851-863
-
-
Gopalakrishnan, M.1
Ding, K.2
Bourjolly, J.M.3
Mohan, S.4
-
8
-
-
0029341661
-
A framework for modeling setup carryover in the capacitated lot-sizing problem
-
Gopalakrishnan, M., Miller, D.M. and Schmidt, C.P., A framework for modeling setup carryover in the capacitated lot-sizing problem. Int. J. Prod. Res., 1995, 33, 1973-1988.
-
(1995)
Int. J. Prod. Res
, vol.33
, pp. 1973-1988
-
-
Gopalakrishnan, M.1
Miller, D.M.2
Schmidt, C.P.3
-
9
-
-
5644274147
-
The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
-
Gupta, D. and Magnusson, T., The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Comput. Oper. Res., 2005, 32, 727-747.
-
(2005)
Comput. Oper. Res
, vol.32
, pp. 727-747
-
-
Gupta, D.1
Magnusson, T.2
-
11
-
-
0033690423
-
Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
-
Haase, K. and Kimms, A., Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. Int. J. Prod. Econ., 2000, 66, 159-169.
-
(2000)
Int. J. Prod. Econ
, vol.66
, pp. 159-169
-
-
Haase, K.1
Kimms, A.2
-
12
-
-
0038617642
-
An effective heuristic for the CLSP with set-up times
-
Hindi, K.S., Fleszar, K. and Charalambous, C., An effective heuristic for the CLSP with set-up times. J. oper. Res. Soc., 2003, 54, 490-498.
-
(2003)
J. oper. Res. Soc
, vol.54
, pp. 490-498
-
-
Hindi, K.S.1
Fleszar, K.2
Charalambous, C.3
-
13
-
-
0032652235
-
Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
-
Kang, S., Malik, K. and Thomas, L.J., Lotsizing and scheduling on parallel machines with sequence-dependent setup costs. Mgmt Sci., 1999, 45, 273-289.
-
(1999)
Mgmt Sci
, vol.45
, pp. 273-289
-
-
Kang, S.1
Malik, K.2
Thomas, L.J.3
-
15
-
-
0242301580
-
Multiperiod production planning carrying over set-up time
-
Porkka, P., Vepsalainen, A.P.J. and Kuula, M., Multiperiod production planning carrying over set-up time. Int. J. Prod. Res., 2003, 41, 1133-1148.
-
(2003)
Int. J. Prod. Res
, vol.41
, pp. 1133-1148
-
-
Porkka, P.1
Vepsalainen, A.P.J.2
Kuula, M.3
-
16
-
-
0032627684
-
The capacitated lot sizing problem with setup carry-over
-
Sox, C.R. and Gao, Y.B., The capacitated lot sizing problem with setup carry-over. IIE Trans., 1999, 31, 173-181.
-
(1999)
IIE Trans
, vol.31
, pp. 173-181
-
-
Sox, C.R.1
Gao, Y.B.2
-
17
-
-
0141675994
-
The capacitated lot-sizing problem with linked lot sizes
-
Suerie, C. and Stadtler, H., The capacitated lot-sizing problem with linked lot sizes. Mgmt Sci., 2003, 49, 1039-1054.
-
(2003)
Mgmt Sci
, vol.49
, pp. 1039-1054
-
-
Suerie, C.1
Stadtler, H.2
-
18
-
-
0013450308
-
Capacitated lot-sizing with setup times
-
Trigeiro, W.W., Thomas, L.J. and McClain, J.O., Capacitated lot-sizing with setup times. Mgmt Sci., 1989, 35, 353-366.
-
(1989)
Mgmt Sci
, vol.35
, pp. 353-366
-
-
Trigeiro, W.W.1
Thomas, L.J.2
McClain, J.O.3
|