-
1
-
-
0023343841
-
Determining lot sizes and resource requirements: A review
-
Bahl H.C., Ritzman L.P., and Gupta J.N.D. Determining lot sizes and resource requirements: A review. Operations Research 35 (1987) 329-345
-
(1987)
Operations Research
, Issue.35
, pp. 329-345
-
-
Bahl, H.C.1
Ritzman, L.P.2
Gupta, J.N.D.3
-
2
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker K.R., and Scudder G.D. Sequencing with earliness and tardiness penalties: A review. Operations Research 1 38 (1990) 22-36
-
(1990)
Operations Research
, vol.1
, Issue.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
3
-
-
0343971012
-
Remarks on: "some extensions of the discrete lotsizing and scheduling problem"
-
Bruggemann W., and Jahnke H. Remarks on: "some extensions of the discrete lotsizing and scheduling problem". Management Science 1 43 (1997) 122
-
(1997)
Management Science
, vol.1
, Issue.43
, pp. 122
-
-
Bruggemann, W.1
Jahnke, H.2
-
4
-
-
0027582974
-
A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup times
-
Cattrysse D., Salomon M., Kuik R., and Wassenhove V. A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup times. Management Science 4 39 (1993) 477-486
-
(1993)
Management Science
, vol.4
, Issue.39
, pp. 477-486
-
-
Cattrysse, D.1
Salomon, M.2
Kuik, R.3
Wassenhove, V.4
-
5
-
-
0010907503
-
Simultaneous batching and scheduling for chemical processing with earliness and tardiness penalties
-
Winter
-
Dessouky M., Kijowski B.A., and Verma S. Simultaneous batching and scheduling for chemical processing with earliness and tardiness penalties. Production and Operations Management 4 8 (1999) 433-444 Winter
-
(1999)
Production and Operations Management
, vol.4
, Issue.8
, pp. 433-444
-
-
Dessouky, M.1
Kijowski, B.A.2
Verma, S.3
-
8
-
-
0028769382
-
The discrete lot-sizing and scheduling problem with sequence-dependent setup costs
-
Fleishmann B. The discrete lot-sizing and scheduling problem with sequence-dependent setup costs. European Journal of Operational Research 8 75 (1994) 395-404
-
(1994)
European Journal of Operational Research
, vol.8
, Issue.75
, pp. 395-404
-
-
Fleishmann, B.1
-
9
-
-
0028769355
-
A linear description of the discrete lot-sizing and scheduling problem
-
Hoesel S.V., and Kolen A. A linear description of the discrete lot-sizing and scheduling problem. European Journal of Operational Research 75 (1994) 342-353
-
(1994)
European Journal of Operational Research
, Issue.75
, pp. 342-353
-
-
Hoesel, S.V.1
Kolen, A.2
-
10
-
-
0032069649
-
Discrete lotsizing and scheduling by batch sequencing
-
Jordan C., and Drexl A. Discrete lotsizing and scheduling by batch sequencing. Management Science 5 44 (1998) 698-713
-
(1998)
Management Science
, vol.5
, Issue.44
, pp. 698-713
-
-
Jordan, C.1
Drexl, A.2
-
11
-
-
85033471977
-
A hybrid genetic approach for single machine scheduling with distinct due dates and release times
-
Kim J. A hybrid genetic approach for single machine scheduling with distinct due dates and release times. Korea-Russia International Symposium on Science and Technology (1999) 245-248
-
(1999)
Korea-Russia International Symposium on Science and Technology
, pp. 245-248
-
-
Kim, J.1
-
12
-
-
0015095281
-
An efficient algorithm for multi-item scheduling
-
Lasdon L.S., and Terjung R.C. An efficient algorithm for multi-item scheduling. Operations Research 19 (1971) 946-969
-
(1971)
Operations Research
, Issue.19
, pp. 946-969
-
-
Lasdon, L.S.1
Terjung, R.C.2
-
13
-
-
0000902813
-
A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights
-
Lee C.Y., and Choi J.Y. A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Computers & Operations Research 22 8 (1995) 857-869
-
(1995)
Computers & Operations Research
, vol.22
, Issue.8
, pp. 857-869
-
-
Lee, C.Y.1
Choi, J.Y.2
-
14
-
-
0035922497
-
Sequence-dependent batch chemical scheduling with earliness an tardiness penalties
-
McGraw K.E., and Dessouky M.M. Sequence-dependent batch chemical scheduling with earliness an tardiness penalties. International Journal of Production Research 14 9 (2001) 3085-3107
-
(2001)
International Journal of Production Research
, vol.14
, Issue.9
, pp. 3085-3107
-
-
McGraw, K.E.1
Dessouky, M.M.2
-
15
-
-
0000967878
-
Some extensions of the discrete lotsizing and scheduling problem
-
Salomon M., Kroon L.G., Kuik R., and Van Wassenhove L.N. Some extensions of the discrete lotsizing and scheduling problem. Management Science 7 37 (1991) 801-812
-
(1991)
Management Science
, vol.7
, Issue.37
, pp. 801-812
-
-
Salomon, M.1
Kroon, L.G.2
Kuik, R.3
Van Wassenhove, L.N.4
-
16
-
-
84977334714
-
Optimal timing schedules in earliness-tardiness single machine sequencing
-
Szwarc W., and Mukhopadhyay S.K. Optimal timing schedules in earliness-tardiness single machine sequencing. Naval Research Logistics 42 (1995) 1109-1114
-
(1995)
Naval Research Logistics
, vol.42
, pp. 1109-1114
-
-
Szwarc, W.1
Mukhopadhyay, S.K.2
|