-
1
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.M., and Whitin T.M. Dynamic version of the economic lot size model. Management Science 5 (1958) 89-96
-
(1958)
Management Science
, vol.5
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
4
-
-
84959054247
-
Mathematical programming models and formulations for deterministic production planning problems
-
Jünger M., and Naddef D. (Eds), Springer, Berlin
-
Pochet Y. Mathematical programming models and formulations for deterministic production planning problems. In: Jünger M., and Naddef D. (Eds). Computational combinatorial optimization. Lecture notes in computer science (2001), Springer, Berlin 57-111
-
(2001)
Computational combinatorial optimization. Lecture notes in computer science
, pp. 57-111
-
-
Pochet, Y.1
-
5
-
-
0021297957
-
Assigning looms in a textile weaving operation with changeover limitation
-
Dearingm P.M., and Henderson R.A. Assigning looms in a textile weaving operation with changeover limitation. Production and Inventory Management 25 (1984) 23-31
-
(1984)
Production and Inventory Management
, vol.25
, pp. 23-31
-
-
Dearingm, P.M.1
Henderson, R.A.2
-
6
-
-
0032044738
-
Batch sequencing and sizing with regular varying demand
-
Clark A.R. Batch sequencing and sizing with regular varying demand. Production Planning and Control 9 3 (1998) 260-266
-
(1998)
Production Planning and Control
, vol.9
, Issue.3
, pp. 260-266
-
-
Clark, A.R.1
-
7
-
-
0034631279
-
Rolling-horizon lot-sizing when set-up times are sequence dependent
-
Clark A.R., and Clark S.J. Rolling-horizon lot-sizing when set-up times are sequence dependent. International Journal of Production Research 38 10 (2000) 2287-2308
-
(2000)
International Journal of Production Research
, vol.38
, Issue.10
, pp. 2287-2308
-
-
Clark, A.R.1
Clark, S.J.2
-
8
-
-
0036604813
-
Simultaneous lot-sizing and scheduling on parallel machines
-
Meyr H. Simultaneous lot-sizing and scheduling on parallel machines. European Journal of Operational Research 139 (2002) 277-292
-
(2002)
European Journal of Operational Research
, vol.139
, pp. 277-292
-
-
Meyr, H.1
-
9
-
-
0033903519
-
Simultaneous lot-sizing and scheduling by combining local search with dual optimization
-
Meyr H. Simultaneous lot-sizing and scheduling by combining local search with dual optimization. European Journal of Operational Research 120 (2000) 311-326
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 311-326
-
-
Meyr, H.1
-
10
-
-
0008655177
-
The general lot sizing and scheduling problem
-
Fleischmann B., and Meyr H. The general lot sizing and scheduling problem. OR Spektrum 19 1 (1997) 11-21
-
(1997)
OR Spektrum
, vol.19
, Issue.1
, pp. 11-21
-
-
Fleischmann, B.1
Meyr, H.2
-
11
-
-
41149168263
-
-
Staggemeier AT, Clark AR, Aickelin U, Smith J. A hybrid genetic algorithm to solve a lot-sizing and scheduling problem. Report MS-2002-4. Intelligent Computer Systems Centre Group, University of the West of England, Bristol, Great Britain; 2002.
-
Staggemeier AT, Clark AR, Aickelin U, Smith J. A hybrid genetic algorithm to solve a lot-sizing and scheduling problem. Report MS-2002-4. Intelligent Computer Systems Centre Group, University of the West of England, Bristol, Great Britain; 2002.
-
-
-
-
12
-
-
0030182052
-
Scheduling jobs on several machines with the job splitting property
-
Serafini P. Scheduling jobs on several machines with the job splitting property. Operations Research 44 4 (1996) 617-628
-
(1996)
Operations Research
, vol.44
, Issue.4
, pp. 617-628
-
-
Serafini, P.1
-
13
-
-
0347934513
-
Parallel machine scheduling with splitting jobs
-
Xing W., and Zhang J. Parallel machine scheduling with splitting jobs. Discrete Applied Mathematics 103 (2000) 259-269
-
(2000)
Discrete Applied Mathematics
, vol.103
, pp. 259-269
-
-
Xing, W.1
Zhang, J.2
-
14
-
-
27644553525
-
A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent set-up times
-
Nait Tahar D., Yalaoui F., Chu C., and Amodeo L. A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent set-up times. International Journal of Production Economics 99 (2006) 63-73
-
(2006)
International Journal of Production Economics
, vol.99
, pp. 63-73
-
-
Nait Tahar, D.1
Yalaoui, F.2
Chu, C.3
Amodeo, L.4
-
15
-
-
84985823959
-
Scheduling parallel processors with set-up costs and resource limitations
-
Sumischrast R.T., and Frendewey J.O. Scheduling parallel processors with set-up costs and resource limitations. Decisions Science 19 (1988) 138-146
-
(1988)
Decisions Science
, vol.19
, pp. 138-146
-
-
Sumischrast, R.T.1
Frendewey, J.O.2
-
16
-
-
0033114757
-
A review of scheduling research involving setup consideration
-
Allahverdi A., Gupta J.N.D., and Aldowaisan T. A review of scheduling research involving setup consideration. Omega 27 (1999) 219-239
-
(1999)
Omega
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
17
-
-
0029404198
-
Rolling horizon algorithms for a single machine dynamic scheduling problem with sequence-dependent set-up times
-
Ovacik M., and Uzsoy R. Rolling horizon algorithms for a single machine dynamic scheduling problem with sequence-dependent set-up times. International Journal of Production Research 33 11 (1995) 3173-3192
-
(1995)
International Journal of Production Research
, vol.33
, Issue.11
, pp. 3173-3192
-
-
Ovacik, M.1
Uzsoy, R.2
-
18
-
-
27844491012
-
Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecast
-
Clark A.R. Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecast. Production Planning & Control 16 1 (2005) 81-97
-
(2005)
Production Planning & Control
, vol.16
, Issue.1
, pp. 81-97
-
-
Clark, A.R.1
-
21
-
-
41149170265
-
-
Clark AR, MorabitoNeto R, Toso EAV. Multi-period production setup-sequencing and lot-sizing through ATSP subtour elimination and patching. Proceedings of the 25th workshop of the UK planning and scheduling special interest group (PlanSIG 2006). December 14-15, 2006, University of Nottingham; p. 80-87. ISSN 1368-5708.
-
Clark AR, MorabitoNeto R, Toso EAV. Multi-period production setup-sequencing and lot-sizing through ATSP subtour elimination and patching. Proceedings of the 25th workshop of the UK planning and scheduling special interest group (PlanSIG 2006). December 14-15, 2006, University of Nottingham; p. 80-87. ISSN 1368-5708.
-
-
-
-
22
-
-
41149148218
-
-
Escudero LF, Salmeron J. On a fix-and-relax framework for large-scale resource-constrained project scheduling. Annals of Operations Research, 2002, forthcoming.
-
Escudero LF, Salmeron J. On a fix-and-relax framework for large-scale resource-constrained project scheduling. Annals of Operations Research, 2002, forthcoming.
-
-
-
|