Scheduling subject to resource constraints: Classification and complexity
-
[Blazewicz et al.83]
-
[Blazewicz et al.83] Blazewicz, J., Lenstra J. and Rinnooy Kan A.H.G., Scheduling subject to resource constraints: classification and complexity, Discrete Applied Mathematics 5 (1983) 11-24.
-
(1983)
Discrete Applied Mathematics
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.2
Rinnooy Kan, A.H.G.3
-
2
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several resource-duration modes
-
[Doctor 93]
-
[Doctor 93] Doctor, F.F., Heuristics for scheduling projects with resource restrictions and several resource-duration modes, International Journal of Production Research 31 (1993) 2547-2558.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2547-2558
-
-
Doctor, F.F.1
-
3
-
-
0030124780
-
A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
-
[Doctor 96a]
-
[Doctor 96a] Doctor F.F., A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes, European Journal of Operational Research 90 (1996) 349-361.
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 349-361
-
-
Doctor, F.F.1
-
4
-
-
0030216966
-
Resource-constrained project scheduling by simulated annealing
-
[Doctor 96b]
-
[Doctor 96b] Doctor F.F., Resource-constrained project scheduling by simulated annealing, International Journal of Production Research 34 (1996) 2335-2351.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2335-2351
-
-
Doctor, F.F.1
-
5
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
[Demeulemeester et al.92]
-
[Demeulemeester et al.92] Demeulemeester, E. and Herroelen, W., A branch-and-bound procedure for the multiple resource-constrained project scheduling problem, Management Science 38 (1992) 1803-1818.
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
6
-
-
0034311599
-
The discrete time/resource trade-off problem in project networks: A branch-and-bound approach
-
[Demeulemeester et al.00]
-
[Demeulemeester et al.00] Demeulemeester, E., De Reyck, D. and Herroelen, W., The discrete time/resource trade-off problem in project networks: a branch-and-bound approach, HE Transactions 32 (2000) 1059-1069.
-
(2000)
HE Transactions
, vol.32
, pp. 1059-1069
-
-
Demeulemeester, E.1
De Reyck, D.2
Herroelen, W.3
-
7
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
[Drexl et al.93]
-
[Drexl et al.93] Drexl A. and Grünewald, J., Nonpreemptive multi-mode resource-constrained project scheduling, HE Transactions 25 (1993) 74-81.
-
(1993)
HE Transactions
, vol.25
, pp. 74-81
-
-
Drexl, A.1
Grünewald, J.2
-
8
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
[Hartmann 98]
-
[Hartmann 98] Hartmann S., A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 45 (1998) 733-750.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
9
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
[Hartmann 01]
-
[Hartmann 01] Hartmann, S., Project scheduling with multiple modes: a genetic algorithm, Annals of Operations Research 102 (2001)111-135.
-
(2001)
Annals of Operations Research
, vol.102
, pp. 111-135
-
-
Hartmann, S.1
-
10
-
-
0002866635
-
The critical-path method: Resources planning and scheduling
-
[Kelley 63] Prentice Hall, New Jersey
-
[Kelley 63] Kelley, J.E., The critical-path method: Resources planning and scheduling, in: Industrial Scheduling, Prentice Hall, New Jersey, 1963, pp. 347-365.
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley, J.E.1
-
12
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
[Kolisch 96]
-
[Kolisch 96] Kolisch, R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation, European Journal of Operational Research 90/2 (1996) 320-333.
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 320-333
-
-
Kolisch, R.1
-
13
-
-
0001896880
-
Adaptive search for solving hard project scheduling problems
-
[Kolisch et al. 96]
-
[Kolisch et al. 96] Kolisch, R. and Drexl, A., Adaptive search for solving hard project scheduling problems, Naval Research Logistics 43 (1996) 23-40.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 23-40
-
-
Kolisch, R.1
Drexl, A.2
-
14
-
-
0031276875
-
Local search for nonpreemptive multi-mode resource-constrained project scheduling
-
[Kolisch et al. 97]
-
[Kolisch et al. 97] Kolisch, R. and Drexl, A., Local search for nonpreemptive multi-mode resource-constrained project scheduling, IIE Transactions 29 (1997) 987-999.
-
(1997)
IIE Transactions
, vol.29
, pp. 987-999
-
-
Kolisch, R.1
Drexl, A.2
-
15
-
-
0035599853
-
Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling
-
[Lova et al.01a]
-
[Lova et al.01a] Lova, A. and Tormos P., Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling, Annals of Operations Research 102 (2001) 263-286.
-
(2001)
Annals of Operations Research
, vol.102
, pp. 263-286
-
-
Lova, A.1
Tormos, P.2
-
16
-
-
84860040422
-
A robust heuristic method for scheduling resource-constrained projects with multiple execution modes
-
[Lova et al.01b] Artiba, A., Martel, A. (Eds.), Université Lavai and Facultés Universitaires Catholiques de Mons, Québec
-
[Lova et al.01b] Lova A. and P. Tormos, A robust heuristic method for scheduling resource-constrained projects with multiple execution modes. In: Artiba, A., Martel, A. (Eds.), Proceedings of the International Conference on Industrial Engineering and Production Management, Université Lavai and Facultés Universitaires Catholiques de Mons, Québec, Vol 2,(2001), pp. 778-787.
-
(2001)
Proceedings of the International Conference on Industrial Engineering and Production Management
, vol.2
, pp. 778-787
-
-
Lova, A.1
Tormos, P.2
-
17
-
-
0001787824
-
The evolution of software quality in project scheduling
-
[Maroto et al.99] Weglarz, J: (Ed.), Kluwer, Dordrecht
-
[Maroto et al.99] Maroto, C., Tormos, P. And Lova, A, The evolution of software quality in project scheduling. IN: Weglarz, J: (Ed.), Handbook on Recent Advances in Project Scheduling. Kluwer, Dordrecht, 1999, pp. 239-260.
-
(1999)
Handbook on Recent Advances in Project Scheduling
, pp. 239-260
-
-
Maroto, C.1
Tormos, P.2
Lova, A.3
-
18
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
[Mori et al.97]
-
[Mori et al.97] Mori, M and Tseng, C.C., A genetic algorithm for multi-mode resource constrained project scheduling problem, European Journal of Operational Research 100 (1997) 134-141.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
19
-
-
0002614325
-
A genetic algorithm approach to a general category project scheduling problem
-
[Özdamar 99]
-
[Özdamar 99] Özdamar L., A genetic algorithm approach to a general category project scheduling problem, IEEE Transactions on systems, man and cybernetics - part C 29 (1999) 44-59.
-
(1999)
IEEE Transactions on Systems, Man and Cybernetics - Part C
, vol.29
, pp. 44-59
-
-
Özdamar, L.1
-
20
-
-
0009627197
-
A local constraint based analysis approach to project scheduling under general resource constraints
-
[Özdamar et al. 94]
-
[Özdamar et al. 94] Özdamar, L. and Ulusoy G., A local constraint based analysis approach to project scheduling under general resource constraints, European Journal of Operational Research 79 (1994) 287-298.
-
(1994)
European Journal of Operational Research
, vol.79
, pp. 287-298
-
-
Özdamar, L.1
Ulusoy, G.2
-
21
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problems
-
[Patterson et al.89] R. Slowinski and J.Weglarz, (eds), chapterl
-
[Patterson et al.89] Patterson, J.H., R. Slowinski, F.B. Talbot and Weglarz, J., An algorithm for a general class of precedence and resource constrained scheduling problems, In R. Slowinski and J.Weglarz, (eds), Advances in project scheduling (Amsterdam: Elsevier), chapterl, 1989, pp. 3-28
-
(1989)
Advances in Project Scheduling (Amsterdam: Elsevier)
, pp. 3-28
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
22
-
-
0042511276
-
Multiobjective project scheduling under multiple-category resource constraints
-
[Slowinski 89] R. Slowinski and J.Weglarz, (eds), chapter7
-
[Slowinski 89] Slowinski, R., Multiobjective project scheduling under multiple-category resource constraints., In R. Slowinski and J.Weglarz, (eds), Advances in project scheduling (Amsterdam: Elsevier), chapter7, 1989, pp. 151-167
-
(1989)
Advances in Project Scheduling (Amsterdam: Elsevier)
, pp. 151-167
-
-
Slowinski, R.1
-
23
-
-
33746101954
-
An exact algorithm for project scheduling with multiple modes
-
[Sprecher et al.97]
-
[Sprecher et al.97] Sprecher, A, Hartmann, S. and Drexl, A., An exact algorithm for project scheduling with multiple modes, OR Spektrum 19 (1997) 195-203.
-
(1997)
OR Spektrum
, vol.19
, pp. 195-203
-
-
Sprecher, A.1
Hartmann, S.2
Drexl, A.3
-
24
-
-
0032096811
-
Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
-
[Sprecher et al.98]
-
[Sprecher et al.98] Sprecher, A. and Drexl, A., Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm, European Journal of Operational Research 107 (1998) 431-450.
-
(1998)
European Journal of Operational Research
, vol.107
, pp. 431-450
-
-
Sprecher, A.1
Drexl, A.2
-
25
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
[Talbot 82]
-
[Talbot 82] Talbot, B., Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case, Management Science 28 (1982) 1197-1210.
-
(1982)
Management Science
, vol.28
, pp. 1197-1210
-
-
Talbot, B.1
-
26
-
-
0010844250
-
Heuristic performance in large resource-constrained projects
-
[Valls et al.92] Departament d'Estadística i Investigació Operativa, Universitat de Valencia, Spain
-
[Valls et al.92] Valls, V., M.A. Perez and M.S. Quintanilla, Heuristic performance in large resource-constrained projects, Working Paper, Nr.2-92. Departament d'Estadística i Investigació Operativa, Universitat de Valencia, Spain, 1992.
-
(1992)
Working Paper
, vol.2
, Issue.92
-
-
Valls, V.1
Perez, M.A.2
Quintanilla, M.S.3
|