1
-
-
34548666552
-
A strategic production scheduling method for an open pit mine.
-
C. Dardano, M. Francisco, J. Proud, eds., Littleton, CO
-
Akaike, A., K. Dagdelen. 1999. A strategic production scheduling method for an open pit mine. C. Dardano, M. Francisco, J. Proud, eds. Proc. 28th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 729-738.
-
(1999)
Proc. 28th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME
, pp. 729-738
-
-
Akaike, A.1
Dagdelen., K.2
-
2
-
-
0036505584
-
Overview of solution strategies used in truck dispatching systems for open pit mines
-
Alarie, S., M. Gamache. 2002. Overview of solution strategies used in truck dispatching systems for open pit mines. Internat. J. Surface Mining Reclamation Environ. 16(1) 59-76.
-
(2002)
Internat. J. Surface Mining Reclamation Environ.
, vol.16
, Issue.1
, pp. 59-76
-
-
Alarie, S.1
Gamache., M.2
-
4
-
-
84864681466
-
A scalable approach to optimal block scheduling
-
Vancouver. CIM, Montréal. Forthcoming
-
Amaya, J., D. Espinoza, M. Goycoolea, E. Moreno, T. Prevost, E. Rubio. 2010. A scalable approach to optimal block scheduling. Proc. 35th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., Vancouver. CIM, Montréal. Forthcoming.
-
(2010)
Proc. 35th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
-
-
Amaya, J.1
Espinoza, D.2
Goycoolea, M.3
Moreno, E.4
Prevost, T.5
Rubio., E.6
-
6
-
-
0021595773
-
Two-phase optimization of coal strategies at a power station
-
Baker, W. R., H. G. Daellenbach. 1984. Two-phase optimization of coal strategies at a power station. Eur. J. Oper. Res. 18(3) 304-314.
-
(1984)
Eur. J. Oper. Res.
, vol.18
, Issue.3
, pp. 304-314
-
-
Baker, W.R.1
Daellenbach., H.G.2
-
7
-
-
0022663475
-
Generalized multiperiod MIP model for production scheduling and processing facilities selection and location
-
Barbaro, R., R. Ramani. 1986. Generalized multiperiod MIP model for production scheduling and processing facilities selection and location. Mining Engrg. 38(2) 107-114.
-
(1986)
Mining Engrg.
, vol.38
, Issue.2
, pp. 107-114
-
-
Barbaro, R.1
Ramani., R.2
-
8
-
-
77954420210
-
Solving LP relaxations of largescale precedence constrained problems
-
Lecture Notes in Computer Science. Springer, Berlin. Forthcoming
-
Bienstock, D., M. Zuckerberg. 2010. Solving LP relaxations of largescale precedence constrained problems. Proc. 14th Conf. Integer Programming Combin. Optim. (IPCO 2010). Lecture Notes in Computer Science. Springer, Berlin. Forthcoming.
-
(2010)
Proc. 14th Conf. Integer Programming Combin. Optim. (IPCO 2010)
-
-
Bienstock, D.1
Zuckerberg., M.2
-
9
-
-
0032659201
-
A queuing model for the design and analysis of a mining stockyard
-
Kluwer Academic Publishers, Boston
-
Binkowski, M., B. McCarragher. 1999. A queuing model for the design and analysis of a mining stockyard. Discrete Event Dynamic Systems: Theory and Applications, Chapter 9. Kluwer Academic Publishers, Boston, 75-98.
-
(1999)
Discrete Event Dynamic Systems: Theory and Applications, Chapter 9
, pp. 75-98
-
-
Binkowski, M.1
McCarragher., B.2
-
10
-
-
33846884212
-
Progress in computational mixed integer programming-a look back from the other side of the tipping point
-
Bixby, R., E. Rothberg. 2007. Progress in computational mixed integer programming-a look back from the other side of the tipping point. Ann. Oper. Res. 149(1) 37-41.
-
(2007)
Ann. Oper. Res.
, vol.149
, Issue.1
, pp. 37-41
-
-
Bixby, R.1
Rothberg., E.2
-
11
-
-
75449087521
-
A strengthened formulation and cutting planes for the open pit mine production scheduling problem
-
Bley, A., N. Boland, C. Fricke, G. Froyland. 2010. A strengthened formulation and cutting planes for the open pit mine production scheduling problem. Comput. Oper. Res. 37(9) 1641-1647.
-
(2010)
Comput. Oper. Res.
, vol.37
, Issue.9
, pp. 1641-1647
-
-
Bley, A.1
Boland, N.2
Fricke, C.3
Froyland., G.4
-
12
-
-
77953602968
-
Comparing MIQCP solvers to a specialised algorithm for mine production scheduling
-
ZIB, Berlin. Retrieved January
-
Bley, A., A. M. Gleixner, T. Koch, S. Vigerske. 2009. Comparing MIQCP solvers to a specialised algorithm for mine production scheduling. ZIB Report 09-32, ZIB, Berlin. Retrieved January 1, 2010, http://opus.kobv.de/zib/ volltexte/2009/1206/.
-
(2009)
ZIB Report 09-32
, vol.1
, pp. 2010
-
-
Bley, A.1
Gleixner, A.M.2
Koch, T.3
Vigerske., S.4
-
13
-
-
77953568149
-
-
Working paper. Retrieved January
-
Boland, N., I. Dumitrescu, G. Froyland. 2010. A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology. Working paper. Retrieved January 20, 2010, http://www.optimization- online.org/DB-FILE/2008/10/2123.pdf.
-
(2010)
A Multistage Stochastic Programming Approach to Open Pit Mine Production Scheduling with Uncertain Geology
, vol.20
, pp. 2010
-
-
Boland, N.1
Dumitrescu, I.2
Froyland, G.3
-
14
-
-
54449094718
-
LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
-
Boland, N., I. Dumitrescu, G. Froyland, A. M. Gleixner. 2009. LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity. Comput. Oper. Res. 36(4) 1064-1089.
-
(2009)
Comput. Oper. Res.
, vol.36
, Issue.4
, pp. 1064-1089
-
-
Boland, N.1
Dumitrescu, I.2
Froyland, G.3
Gleixner., A.M.4
-
15
-
-
0022186448
-
Sizing storage facilities for open pit coal mines
-
Bradley, C. E., S. G. Taylor, W. I. Gray. 1985. Sizing storage facilities for open pit coal mines. IIE Trans. 17(4) 320-326.
-
(1985)
IIE Trans.
, vol.17
, Issue.4
, pp. 320-326
-
-
Bradley, C.E.1
Taylor, S.G.2
Gray, W.I.3
-
16
-
-
33947601760
-
Network optimization for the design of underground mines
-
Brazil, M., D. A. Thomas. 2007. Network optimization for the design of underground mines. Networks 49(1) 40-50.
-
(2007)
Networks
, vol.49
, Issue.1
, pp. 40-50
-
-
Brazil, M.1
Thomas., D.A.2
-
17
-
-
1242265094
-
Optimising declines in underground mines
-
Brazil, M., D. H. Lee, M. Van Leuven, J. H. Rubinstein, D. A. Thomas, N. C. Wormald. 2003. Optimising declines in underground mines. Mining Tech.: IMM Trans. Sect. A 112(3) A164-A170.
-
(2003)
Mining Tech.: IMM Trans. Sect. A
, vol.112
, Issue.3
-
-
Brazil, M.1
Lee, D.H.2
Van Leuven, M.3
Rubinstein, J.H.4
Thomas, D.A.5
Wormald, N.C.6
-
18
-
-
0001603924
-
Evaluating natural resource investments
-
Brennan, M. J., E. S. Schwartz. 1985. Evaluating natural resource investments. J. Bus. 58(2) 135-157.
-
(1985)
J. Bus.
, vol.58
, Issue.2
, pp. 135-157
-
-
Brennan, M.J.1
Schwartz., E.S.2
-
19
-
-
80053106076
-
Models for mining equipment selection
-
A. Zerger, R. M. Argent, eds., Modelling and Simulation Society of Australia and New Zealand
-
Burt, C., L. Caccetta, S. Hill, P. Welgama. 2005. Models for mining equipment selection. A. Zerger, R. M. Argent, eds. MODSIM 2005 Internat. Congress Modeling Simulation. Modelling and Simulation Society of Australia and New Zealand, 1730-1736.
-
(2005)
MODSIM 2005 Internat. Congress Modeling Simulation
, pp. 1730-1736
-
-
Burt, C.1
Caccetta, L.2
Hill, S.3
Welgama., P.4
-
21
-
-
0042929889
-
An application of branch and cut to open pit mine scheduling
-
Caccetta, L., S. P. Hill. 2003. An application of branch and cut to open pit mine scheduling. J. Global Optim. 27(2-3) 349-365.
-
(2003)
J. Global Optim.
, vol.27
, Issue.2-3
, pp. 349-365
-
-
Caccetta, L.1
Hill., S.P.2
-
22
-
-
0035785597
-
Design of open-pit phases with consideration of schedule constraints
-
H. Xie, Y. Wang, Y. Jiang, eds., CUMT, Beijing
-
Cai, W. 2001. Design of open-pit phases with consideration of schedule constraints. H. Xie, Y. Wang, Y. Jiang, eds. Proc. 29th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., CUMT, Beijing, 217-221.
-
(2001)
Proc. 29th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 217-221
-
-
Cai, W.1
-
23
-
-
0039192902
-
Underground planning at stillwater mining company
-
Carlyle, W. M., B. C. Eaves. 2001. Underground planning at Stillwater Mining Company. Interfaces 31(4) 50-60.
-
(2001)
Interfaces
, vol.31
, Issue.4
, pp. 50-60
-
-
Carlyle, W.M.1
Eaves, B.C.2
-
24
-
-
77953585097
-
An integrated approach to the long-term planning process in the copper mining industry
-
A. Weintraub, C. Romero, T. Bjorndal, R. Epstein, eds., Springer, New York
-
Caro, R., R. Epstein, P. Santibañez, A. Weintraub. 2007. An integrated approach to the long-term planning process in the copper mining industry. A. Weintraub, C. Romero, T. Bjorndal, R. Epstein, eds. Handbook of Operations Research in Natural Resources. Springer, New York, 595-609.
-
(2007)
Handbook of Operations Research in Natural Resources
, pp. 595-609
-
-
Caro, R.1
Epstein, R.2
Santibañez, P.3
Weintraub., A.4
-
25
-
-
77953552768
-
-
Working Paper 11, Institute Milenium Complex Engineering Systems, Santiago, Chile
-
Carvallo, F., A. Alonso, L. Escudero, M. Guignard-Spielberg, A. Weintraub. 2009. Lagrangian relaxation decomposes a stochastic mining problem. Working Paper 11, Institute Milenium Complex Engineering Systems, Santiago, Chile.
-
(2009)
Lagrangian Relaxation Decomposes A Stochastic Mining Problem
-
-
Carvallo, F.1
Alonso, A.2
Escudero, L.3
Guignard-Spielberg, M.4
Weintraub., A.5
-
26
-
-
0025573858
-
An application of integer programming and simulation to production planning for a stratiform ore body
-
Chanda, E. K. C. 1990. An application of integer programming and simulation to production planning for a stratiform ore body. Mining Sci. Tech. 11(2) 165-172.
-
(1990)
Mining Sci. Tech.
, vol.11
, Issue.2
, pp. 165-172
-
-
Chanda, E.K.C.1
-
27
-
-
1542714363
-
Optimization principle of combined surface and underground mining and its applications
-
Chen, J., D. Gu, J. Li. 2003. Optimization principle of combined surface and underground mining and its applications. J. Central South Univ. Tech. (China) 10(3) 222-225.
-
(2003)
J. Central South Univ. Tech. (China)
, vol.10
, Issue.3
, pp. 222-225
-
-
Chen, J.1
Gu, D.2
Li, J.3
-
28
-
-
77953566722
-
-
Working paper, Universidad Adolfo Ibañez and Universidad de Chile, Santiago
-
Chicoisne, R., D. Espinoza, M. Goycoolea, E. Moreno, E. Rubio. 2009. A new algorithm for the open-pit mine scheduling problem. Working paper, Universidad Adolfo Ibañez and Universidad de Chile, Santiago.
-
(2009)
A New Algorithm for the Open-pit Mine Scheduling Problem
-
-
Chicoisne, R.1
Espinoza, D.2
Goycoolea, M.3
Moreno, E.4
Rubio., E.5
-
29
-
-
0032138633
-
Evaluating environmental investments: A real options approach
-
Cortazar, G., E. S. Schwartz, M. Salinas. 1998. Evaluating environmental investments: A real options approach. Management Sci. 44(8) 1059-1070.
-
(1998)
Management Sci.
, vol.44
, Issue.8
, pp. 1059-1070
-
-
Cortazar, G.1
Schwartz, E.S.2
Salinas., M.3
-
30
-
-
0022890680
-
Optimum open pit mine production scheduling by Lagrangian parameterization
-
SME, Littleton, CO
-
Dagdelen, K., T. Johnson. 1986. Optimum open pit mine production scheduling by Lagrangian parameterization. Proc. 19th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 127-141.
-
(1986)
Proc. 19th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 127-141
-
-
Dagdelen, K.1
Johnson, T.2
-
31
-
-
77953556774
-
Datamine
-
Bedfordshire, UK
-
Datamine. 2009. NPV scheduler. Bedfordshire, UK. http://www.datamine.co. uk/products/PDF-Flyers/NPVScheduler4-LoRes-Sep07-LoRes-English.pdf.
-
(2009)
NPV Scheduler
-
-
-
32
-
-
0028121944
-
Open-pit design and scheduling by use of genetic algorithms
-
Denby, B., D. Schofield. 1994. Open-pit design and scheduling by use of genetic algorithms. Mining Tech.: IMM Trans. Sect. A 103 A21-A26.
-
(1994)
Mining Tech.: IMM Trans. Sect. A
, vol.103
-
-
Denby, B.1
Schofield., D.2
-
33
-
-
77953570787
-
The place of geostatistical simulation in resource/reserve estimation
-
University of Chile and the Catholic University of Chile, Santiago
-
Deutsch, C. 2004. The place of geostatistical simulation in resource/reserve estimation. Proc. Internat. Conf. Mining Innovation (MININ), University of Chile and the Catholic University of Chile, Santiago.
-
(2004)
Proc. Internat. Conf. Mining Innovation (MININ)
-
-
Deutsch, C.1
-
34
-
-
34147120474
-
A note on two problems in connection with graphs
-
Dijkstra, E. W. 1959. A note on two problems in connection with graphs. Numerische Mathematik 1(1) 269-271.
-
(1959)
Numerische Mathematik
, vol.1
, Issue.1
, pp. 269-271
-
-
Dijkstra, E.W.1
-
35
-
-
0024168608
-
An adaptive control scheme-expert system- that optimizes the operation of a proposed underground coal mining system with applications to shortwall, longwall and room pillar mining systems
-
Cybernetics. International Academic Publishers, Pergamon Press, Beijing
-
Dornetto, L. D. 1988. An adaptive control scheme-expert system- that optimizes the operation of a proposed underground coal mining system with applications to shortwall, longwall and room pillar mining systems. Proc. 1988 IEEE Internat. Conf. Systems Man, Cybernetics. International Academic Publishers, Pergamon Press, Beijing, 209-214.
-
(1988)
Proc. 1988 IEEE Internat. Conf. Systems Man
, pp. 209-214
-
-
Dornetto, L.D.1
-
36
-
-
0027601871
-
Open-pit optimization, part 1: Optimal open-pit design
-
Dowd, P., A. Onur. 1993. Open-pit optimization, part 1: Optimal open-pit design. Mining Tech.: IMM Trans. Sect. A 102 A95-A104.
-
(1993)
Mining Tech.: IMM Trans. Sect. A
, vol.102
-
-
Dowd, P.1
Onur., A.2
-
37
-
-
0029419666
-
Open pit mine design and extraction sequencing by use of or and AI concepts
-
Elevli, B. 1995. Open pit mine design and extraction sequencing by use of OR and AI concepts. Internat. J. Surface Mining Reclamation Environ. 9(4) 149-153.
-
(1995)
Internat. J. Surface Mining Reclamation Environ.
, vol.9
, Issue.4
, pp. 149-153
-
-
Elevli, B.1
-
38
-
-
77953585729
-
Optimizing long term planning for underground copper mines
-
Santiago, Chile, CIM and the Chilean Institute of Mining
-
Epstein, R., S. Gaete, F. Caro, A. Weintraub, P. Santibañez, J. Catalan. 2003. Optimizing long term planning for underground copper mines. Proc. Copper 2003-Cobre 2003, 5th Internat. Conf., Vol I, Santiago, Chile, CIM and the Chilean Institute of Mining, 265-279.
-
(2003)
Proc. Copper 2003-Cobre 2003, 5th Internat. Conf.
, vol.1
, pp. 265-279
-
-
Epstein, R.1
Gaete, S.2
Caro, F.3
Weintraub, A.4
Santibañez, P.5
Catalan., J.6
-
39
-
-
0035485573
-
A simulative model for optimum pit design
-
Erarslan, K., N. Çelebi. 2001. A simulative model for optimum pit design. CIM Bull. 94(1055) 59-68.
-
(2001)
CIM Bull.
, vol.94
, Issue.1055
, pp. 59-68
-
-
Erarslan, K.1
Çelebi, N.2
-
40
-
-
0030410309
-
Reducing the environmental and economic costs of handling iron ore
-
C. A. Brebbia, P. Zannetti, eds., VI, Como, Italy
-
Everett, J. 1996. Reducing the environmental and economic costs of handling iron ore. C. A. Brebbia, P. Zannetti, eds. Proc. Internat. Conf. Development Appl. Comput. Techniques Environ. Stud. VI, Como, Italy, 573-582.
-
(1996)
Proc. Internat. Conf. Development Appl. Comput. Techniques Environ. Stud.
, pp. 573-582
-
-
Everett, J.1
-
43
-
-
0023399309
-
Optimization of open pit short- and long-range production scheduling
-
Fytas, K., C. Pelley, P. Calder. 1987. Optimization of open pit short- and long-range production scheduling. CIM Bull. 80(904) 55-61.
-
(1987)
CIM Bull.
, vol.80
, Issue.904
, pp. 55-61
-
-
Fytas, K.1
Pelley, C.2
Calder., P.3
-
44
-
-
13544265333
-
A shortest-path algorithm for solving the fleet management problem in underground mines
-
Gamache, M., R. Grimard, P. Cohen. 2005. A shortest-path algorithm for solving the fleet management problem in underground mines. Eur. J. Oper. Res. 166(2) 497-506.
-
(2005)
Eur. J. Oper. Res.
, vol.166
, Issue.2
, pp. 497-506
-
-
Gamache, M.1
Grimard, R.2
Cohen., P.3
-
46
-
-
0012299968
-
Heuristic approaches for mine planning and production scheduling
-
Gershon, M. 1987. Heuristic approaches for mine planning and production scheduling. Internat. J. Mining Geological Engrg. 5(1) 1-13.
-
(1987)
Internat. J. Mining Geological Engrg.
, vol.5
, Issue.1
, pp. 1-13
-
-
Gershon, M.1
-
47
-
-
0024961583
-
Optimizing single hole mine cuts by dynamic programming
-
Gershon, M., F. Murphy. 1989. Optimizing single hole mine cuts by dynamic programming. Eur. J. Oper. Res. 38(1) 56-62.
-
(1989)
Eur. J. Oper. Res.
, vol.38
, Issue.1
, pp. 56-62
-
-
Gershon, M.1
Murphy., F.2
-
48
-
-
35548971614
-
Using chance constrained binary integer programming in optimizing long term production scheduling for open pit mine design
-
Gholamnejad, J., M. Osanloo. 2007. Using chance constrained binary integer programming in optimizing long term production scheduling for open pit mine design. Mining Tech.: IMM Trans. Sect. A 116(2) 58-66.
-
(2007)
Mining Tech.: IMM Trans. Sect. A
, vol.116
, Issue.2
, pp. 58-66
-
-
Gholamnejad, J.1
Osanloo., M.2
-
50
-
-
77953583075
-
Using mathematical programming to develop optimal overburden transport strategies in a surface coal mining operation
-
Goodman, G. V. R., S. C. Sarin. 1988. Using mathematical programming to develop optimal overburden transport strategies in a surface coal mining operation. Internat. J. Surface Mining Reclamation Environ. 2(1) 51-58.
-
(1988)
Internat. J. Surface Mining Reclamation Environ
, vol.2
, Issue.1
, pp. 51-58
-
-
Goodman, G.V.R.1
Sarin., S.C.2
-
52
-
-
35548958284
-
Managing grade risk in stope design optimization: Probabilistic mathematical programming model and application in sublevel stoping
-
Grieco, N., R. Dimitrakopoulos. 2007. Managing grade risk in stope design optimization: Probabilistic mathematical programming model and application in sublevel stoping. Mining Tech.: IMM Trans. Sect. A 116(2) 49-57.
-
(2007)
Mining Tech.: IMM Trans. Sect. A
, vol.116
, Issue.2
, pp. 49-57
-
-
Grieco, N.1
Dimitrakopoulos, R.2
-
53
-
-
34547437028
-
A model of discounted profit variation of open pit production sequencing optimization
-
R. Ganguli, S. Dessureault, V. Kecojevic, J. Dwyer, eds., SME, Littleton, CO
-
Halatchev, R. 2005. A model of discounted profit variation of open pit production sequencing optimization. R. Ganguli, S. Dessureault, V. Kecojevic, J. Dwyer, eds. Proc. 32nd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 315-323.
-
(2005)
Proc. 32nd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 315-323
-
-
Halatchev, R.1
-
54
-
-
0038073806
-
Underground mining methods and applications
-
W. A. Hustrulid, R. L. Bullock, eds., SME, Littleton, CO
-
Hamrin, H. 2001. Underground mining methods and applications. W. A. Hustrulid, R. L. Bullock, eds. Underground Mining Methods: Engineering Fundamentals and International Case Studies. SME, Littleton, CO, 3-14.
-
(2001)
Underground Mining Methods: Engineering Fundamentals and International Case Studies
, pp. 3-14
-
-
Hamrin, H.1
-
55
-
-
0034313704
-
Performance analysis and best implementations of old and new algorithms for the open-pit mining problem
-
Hochbaum, D. S., A. Chen. 2000. Performance analysis and best implementations of old and new algorithms for the open-pit mining problem. Oper. Res. 48(6) 894-914.
-
(2000)
Oper. Res.
, vol.48
, Issue.6
, pp. 894-914
-
-
Hochbaum, D.S.1
Chen., A.2
-
56
-
-
0032756179
-
Mine planning at Newmont's Nevada operations
-
Hoerger, S., L. Hoffman, F. Seymour. 1999. Mine planning at Newmont's Nevada operations. Mining Engrg. 51(10) 26-30.
-
(1999)
Mining Engrg.
, vol.51
, Issue.10
, pp. 26-30
-
-
Hoerger, S.1
Hoffman, L.2
Seymour., F.3
-
57
-
-
0028728388
-
Optimizing the number of load-hauldump machines in a Swedish mine by using queuing theory- A case study
-
Huang, Y., U. Kumar. 1994. Optimizing the number of load-hauldump machines in a Swedish mine by using queuing theory- A case study. Internat. J. Surface Mining Reclamation Environ. 8(4) 171-174.
-
(1994)
Internat. J. Surface Mining Reclamation Environ.
, vol.8
, Issue.4
, pp. 171-174
-
-
Huang, Y.1
Kumar., U.2
-
58
-
-
77953565736
-
-
IBM. Incline Village, NV
-
IBM. 2009. ILOG CPLEX. Incline Village, NV. http://www-01.ibm.com/ software/integration/optimization/cplex.
-
(2009)
ILOG CPLEX
-
-
-
59
-
-
77953570786
-
Pit limits optimization using a stochastic process
-
Jalali, S. E., M. Ataee-pour, K. Shahriar. 2006. Pit limits optimization using a stochastic process. CIM Magazine 1(6) 90.
-
(2006)
CIM Magazine
, vol.1
, Issue.6
, pp. 90
-
-
Jalali, S.E.1
Ataee-Pour, M.2
Shahriar., K.3
-
60
-
-
0038393634
-
Optimal production planning in underground coal mines through goal programming: A case study from an Indian mine
-
J. Elbrond, X. Tang, eds., CIM, Montréal
-
Jawed, M. 1993. Optimal production planning in underground coal mines through goal programming: A case study from an Indian mine. J. Elbrond, X. Tang, eds. Proc. 24th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., CIM, Montréal, 44-50.
-
(1993)
Proc. 24th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 44-50
-
-
Jawed, M.1
-
64
-
-
84974868021
-
Integer programming for optimal phosphate-mining strategies
-
Klingman, D., N. Phillips. 1988. Integer programming for optimal phosphate-mining strategies. J. Oper. Res. Soc. 39(9) 805-810.
-
(1988)
J. Oper. Res. Soc.
, vol.39
, Issue.9
, pp. 805-810
-
-
Klingman, D.1
Phillips., N.2
-
65
-
-
0000455229
-
A statistical approach to some basic mine valuation problems on the Witwatersrand
-
Krige, D. G. 1951. A statistical approach to some basic mine valuation problems on the Witwatersrand. J. Chemical Metallurgical Mining Soc. South Africa 52(6) 119-139.
-
(1951)
J. Chemical Metallurgical Mining Soc. South Africa
, vol.52
, Issue.6
, pp. 119-139
-
-
Krige, D.G.1
-
66
-
-
2442504659
-
Implementing a production schedule at LKAB's Kiruna Mine
-
Kuchta, M., A. Newman, E. Topal. 2004. Implementing a production schedule at LKAB's Kiruna Mine. Interfaces 34(2) 124-134.
-
(2004)
Interfaces
, vol.34
, Issue.2
, pp. 124-134
-
-
Kuchta, M.1
Newman, A.2
Topal., E.3
-
67
-
-
21944454908
-
Reliability-based optimisation of a mine production system using genetic algorithms
-
Kumral, M. 2005. Reliability-based optimisation of a mine production system using genetic algorithms. J. Loss Prevention Process Indust. 18(3) 186-189.
-
(2005)
J. Loss Prevention Process Indust.
, vol.18
, Issue.3
, pp. 186-189
-
-
Kumral, M.1
-
68
-
-
0012352810
-
The economic definition of ore: Cutoff grade in theory and practice
-
London
-
Lane, K. 1988. The Economic Definition of Ore: Cutoff Grade in Theory and Practice. Mining Journal Books Limited, London.
-
(1988)
Mining Journal Books Limited
-
-
Lane, K.1
-
69
-
-
85098580707
-
-
B. Kennedy, ed. Surface Mining, Chapter 5.2. Port City Press, Baltimore
-
Laurich, R. 1990. Planning and design of surface mines. B. Kennedy, ed. Surface Mining, Chapter 5.2. Port City Press, Baltimore, 465-469.
-
(1990)
Planning and Design of Surface Mines
, pp. 465-469
-
-
Laurich, R.1
-
70
-
-
77953576685
-
An integrated evaluation system for mine planning under uncertainty
-
E. Magri, ed., Gecamin Ltda., Santiago, Chile
-
Lemelin, B., S. A. Abdel Sabour, R. Poulin. 2007. An integrated evaluation system for mine planning under uncertainty. E. Magri, ed. Proc. 33rd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., Gecamin Ltda., Santiago, Chile, 262-269.
-
(2007)
Proc. 33rd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 262-269
-
-
Lemelin, B.1
Abdel Sabour, S.A.2
Poulin., R.3
-
72
-
-
77953604577
-
-
Accessed March 17, 2010
-
Lindo. LINGO optimization software. Accessed March 17, 2010, http://www.lindo.com/index.php?option=com-content&view= article&id= 136&Itemid=54.
-
Lindo. LINGO Optimization Software
-
-
-
73
-
-
0021855815
-
Optimal layout of underground mining levels
-
Lizotte, Y., J. Elbrond. 1985. Optimal layout of underground mining levels. CIM Bull. 78(873) 41-48.
-
(1985)
CIM Bull.
, vol.78
, Issue.873
, pp. 41-48
-
-
Lizotte, Y.1
Elbrond., J.2
-
74
-
-
0028380686
-
Mathematical model for estimating the economic effectiveness of production process in coal panels and an example of its practical application
-
Magda, R. 1994. Mathematical model for estimating the economic effectiveness of production process in coal panels and an example of its practical application. Internat. J. Prod. Econom. 34(1) 47-55.
-
(1994)
Internat. J. Prod. Econom.
, vol.34
, Issue.1
, pp. 47-55
-
-
Magda, R.1
-
75
-
-
77953584759
-
-
Maptek Software Pty Ltd. Vulcan Chronos. Sydney, Australia
-
Maptek. 2009. Maptek Software Pty Ltd. Vulcan Chronos. Sydney, Australia. http://maptek.com/products/vulcan/scheduling/chronos-reserving-scheduling- odule.html.
-
(2009)
Maptek
-
-
-
76
-
-
61349194374
-
Front Range Aggregates optimizes feeder movements at its quarry
-
McKenzie, P., A. M. Newman, L. Tenorio. 2008. Front Range Aggregates optimizes feeder movements at its quarry. Interfaces 38(6) 436-447.
-
(2008)
Interfaces
, vol.38
, Issue.6
, pp. 436-447
-
-
McKenzie, P.1
Newman, A.M.2
Tenorio., L.3
-
77
-
-
0034226039
-
Simulation of a conveyor belt network at an underground coal mine
-
McNearny, R., Z. Nie. 2000. Simulation of a conveyor belt network at an underground coal mine. Mineral Resources Engrg. 9(3) 343-355.
-
(2000)
Mineral Resources Engrg.
, vol.9
, Issue.3
, pp. 343-355
-
-
McNearny, R.1
Nie., Z.2
-
78
-
-
77953574410
-
-
MineMax Software Pty Ltd. Perth, Australia
-
MineMax. 2006. MineMax Software Pty Ltd. Perth, Australia. http://www.minemax.com/.
-
(2006)
MineMax
-
-
-
80
-
-
0027596785
-
Use of object-oriented simulation model to assess operating and equipment options for underground mine transport system
-
Mutagwaba, W., J. Hudson. 1993. Use of object-oriented simulation model to assess operating and equipment options for underground mine transport system. Mining Tech. IMM Trans. Sect. A 102 89-94.
-
(1993)
Mining Tech. IMM Trans. Sect. A
, vol.102
, pp. 89-94
-
-
Mutagwaba, W.1
Hudson., J.2
-
81
-
-
77953547129
-
Capacity constrained production scheduling.
-
M. Cardu, R. Ciccu, E. Lovera, E. Michelotti, eds., FIORDO S.r.l., Torino, Italy
-
Najor, J., P. Hagan. 2006. Capacity constrained production scheduling. M. Cardu, R. Ciccu, E. Lovera, E. Michelotti, eds. Proc. 15th Internat. Sympos. Mine Planning Equipment Selection (MPES), FIORDO S.r.l., Torino, Italy, 1173-1178.
-
(2006)
Proc. 15th Internat. Sympos. Mine Planning Equipment Selection (MPES)
, pp. 1173-1178
-
-
Najor, J.1
Hagan., P.2
-
82
-
-
13944277455
-
A hybrid knowledge base system and genetic algorithms for equipment selection
-
Naoum, S., A. Haidar. 2000. A hybrid knowledge base system and genetic algorithms for equipment selection. Engrg. Construction Architectural Management 7(1) 3-14.
-
(2000)
Engrg. Construction Architectural Management
, vol.7
, Issue.1
, pp. 3-14
-
-
Naoum, S.1
Haidar., A.2
-
83
-
-
33749577061
-
Using aggregation to optimize longterm production planning at an underground mine
-
Newman, A., M. Kuchta. 2007. Using aggregation to optimize longterm production planning at an underground mine. Eur. J. Oper. Res. 176(2) 1205-1218.
-
(2007)
Eur. J. Oper. Res.
, vol.176
, Issue.2
, pp. 1205-1218
-
-
Newman, A.1
Kuchta., M.2
-
84
-
-
84859585366
-
-
Working paper, Colorado School of Mines, Golden
-
Newman, A., C. Yano, E. Rubio. 2009. Mining above and below ground: Timing the transition.Working paper, Colorado School of Mines, Golden.
-
(2009)
Mining above and below Ground: Timing the Transition
-
-
Newman, A.1
Yano, C.2
Rubio., E.3
-
85
-
-
0027599370
-
Open-pit optimization part 2: Production scheduling and inclusion of roadways
-
Onur, A., P. Dowd. 1993. Open-pit optimization part 2: Production scheduling and inclusion of roadways. Mining Tech.: IMM Trans. Sect. A 102 105-113.
-
(1993)
Mining Tech.: IMM Trans. Sect. A
, vol.102
, pp. 105-113
-
-
Onur, A.1
Dowd., P.2
-
86
-
-
71249090947
-
Fuzzy model for truck allocation in surface mines
-
M. Hardygora, G. Paszkowska, M. Sikora, eds., Wroclaw, Poland
-
Oraee, K., B. Asi. 2004. Fuzzy model for truck allocation in surface mines. M. Hardygora, G. Paszkowska, M. Sikora, eds. Proc. 13th Internat. Sympos. Mine Planning Equipment Selection (MPES), Wroclaw, Poland, 585-591.
-
(2004)
Proc. 13th Internat. Sympos. Mine Planning Equipment Selection (MPES)
, pp. 585-591
-
-
Oraee, K.1
Asi., B.2
-
88
-
-
0031357036
-
A fuzzy linear programming model for production planning in coal mines
-
Pendharkar, P. 1997. A fuzzy linear programming model for production planning in coal mines. Comput. Oper. Res. 24(12) 1141-1149.
-
(1997)
Comput. Oper. Res.
, vol.24
, Issue.12
, pp. 1141-1149
-
-
Pendharkar, P.1
-
89
-
-
0034389011
-
Nonlinear programming and genetic search application for production scheduling in coal mines
-
Pendharkar, P. C., J. A. Rodger. 2000. Nonlinear programming and genetic search application for production scheduling in coal mines. Ann. Oper. Res. 95(1-4) 251-267.
-
(2000)
Ann. Oper. Res.
, vol.95
, Issue.1-4
, pp. 251-267
-
-
Pendharkar, P.C.1
Rodger., J.A.2
-
90
-
-
77953552031
-
Optimization of underground mining methods using grey theory and neural networks
-
W. Hennies, L. Ayres da Silva, A. Chaves, eds. 5th Internat., Sao Paulo, Brazil
-
Qinglin, C., B. Stillborg, C. Li. 1996. Optimization of underground mining methods using grey theory and neural networks. W. Hennies, L. Ayres da Silva, A. Chaves, eds. 5th Internat. Sympos. Mine Planning Equipment Selection (MPES), Sao Paulo, Brazil, 393-398.
-
(1996)
Sympos. Mine Planning Equipment Selection (MPES)
, pp. 393-398
-
-
Qinglin, C.1
Stillborg C Li., B.2
-
91
-
-
77953568148
-
The use of mixed integer linear programming for long-term scheduling in block caving mines
-
F. Camisani-Calzolari, ed., SAIMM, Cape Town, South Africa
-
Rahal, D., M. Smith, G. Van Hout, A. Von Johannides. 2003. The use of mixed integer linear programming for long-term scheduling in block caving mines. F. Camisani-Calzolari, ed. Proc 31st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SAIMM, Cape Town, South Africa, 123-131.
-
(2003)
Proc 31st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 123-131
-
-
Rahal, D.1
Smith, M.2
Van Hout, G.3
Von, A.Johannides.4
-
92
-
-
33750463056
-
The new fundamental tree algorithm for production scheduling of open pit mines
-
Ramazan, S. 2007. The new fundamental tree algorithm for production scheduling of open pit mines. Eur. J. Oper. Res. 177(2) 1153-1166.
-
(2007)
Eur. J. Oper. Res.
, vol.177
, Issue.2
, pp. 1153-1166
-
-
Ramazan, S.1
-
93
-
-
4544233521
-
Traditional and new MIP models for production scheduling with in-situ grade variability
-
Ramazan, S., R. Dimitrakopoulos. 2004. Traditional and new MIP models for production scheduling with in-situ grade variability. Internat. J. Surface Mining Reclamation Environ. 18(2) 85-98.
-
(2004)
Internat. J. Surface Mining Reclamation Environ.
, vol.18
, Issue.2
, pp. 85-98
-
-
Ramazan, S.1
Dimitrakopoulos, R.2
-
94
-
-
77953575378
-
Mill feed optimization for multiple processing facilities using integer linear programming
-
M. Cardu, R. Ciccu, E. Lovera, E. Michelotti, eds.. FIORDO S.r.l., Torino, Italy
-
Rubio, E. 2006. Mill feed optimization for multiple processing facilities using integer linear programming. M. Cardu, R. Ciccu, E. Lovera, E. Michelotti, eds. Proc. 15th Internat. Sympos. Mine Planning Equipment Selection (MPES). FIORDO S.r.l., Torino, Italy, 1206-1212.
-
(2006)
Proc. 15th Internat. Sympos. Mine Planning Equipment Selection (MPES)
, pp. 1206-1212
-
-
Rubio, E.1
-
95
-
-
77953579410
-
Block cave production planning using operation research tools
-
A. Karzulovic, M. Alfaro, eds., Instituto de Ingenieros de Chile, Santiago, Chile
-
Rubio, E., E. Diering. 2004. Block cave production planning using operation research tools. A. Karzulovic, M. Alfaro, eds. Proc. MassMin 2004, Instituto de Ingenieros de Chile, Santiago, Chile, 141-149.
-
(2004)
Proc. MassMin 2004
, pp. 141-149
-
-
Rubio, E.1
Diering., E.2
-
96
-
-
77953553683
-
A genetic algorithms approach for grade control planning in a bauxite deposit
-
R. Ganguli, S. Dessureault, V. Kecojevic, J. Dwyer, eds., SME, Littleton, CO
-
Samanta, B., A. Bhattacherjee, R. Ganguli. 2005. A genetic algorithms approach for grade control planning in a bauxite deposit. R. Ganguli, S. Dessureault, V. Kecojevic, J. Dwyer, eds. Proc. 32nd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 337-342.
-
(2005)
Proc. 32nd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 337-342
-
-
Samanta, B.1
Bhattacherjee, A.2
Ganguli., R.3
-
97
-
-
11844254419
-
The long-term mine production scheduling problem
-
Sarin, S. C., J. West-Hansen. 2005. The long-term mine production scheduling problem. IIE Trans. 37(2) 109-121.
-
(2005)
IIE Trans.
, vol.37
, Issue.2
, pp. 109-121
-
-
Sarin, S.C.1
West-Hansen., J.2
-
98
-
-
0022825830
-
Evaluation of underground coarse-coal slurry transportation systems by a simulation model
-
Sevim, H. 1987. Evaluation of underground coarse-coal slurry transportation systems by a simulation model. AIME Trans.: Part A-Oper. Res. 280 1817-1822.
-
(1987)
AIME Trans.: Part A-Oper. Res.
, vol.280
, pp. 1817-1822
-
-
Sevim, H.1
-
99
-
-
0031995238
-
The problem of production planning in open pit mines
-
Sevim, H., D. Lei. 1998. The problem of production planning in open pit mines. Infor. Systems Oper. Res. (INFOR) J. 36(1-2) 1-12.
-
(1998)
Infor. Systems Oper. Res. (INFOR) J.
, vol.36
, Issue.1-2
, pp. 1-12
-
-
Sevim, H.1
Lei., D.2
-
100
-
-
43049130393
-
Determination of the most effective longwall equipment combination in longwall top coal caving (LTCC) method by simulation modeling
-
Simsir, F., M. K. Ozfirat. 2008. Determination of the most effective longwall equipment combination in longwall top coal caving (LTCC) method by simulation modeling. Internat. J. Rock Mech. Mining Sci. 45(6) 1015-1023.
-
(2008)
Internat. J. Rock Mech. Mining Sci.
, vol.45
, Issue.6
, pp. 1015-1023
-
-
Simsir, F.1
Ozfirat., M.K.2
-
101
-
-
7544220457
-
Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines
-
F. Camisani-Calzolari, ed., SAIMM, Cape Town, South Africa
-
Smith, M., I. Sheppard, G. Karunatillake. 2003. Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines. F. Camisani-Calzolari, ed. Proc. 31st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SAIMM, Cape Town, South Africa, 465-474.
-
(2003)
Proc. 31st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 465-474
-
-
Smith, M.1
Sheppard, I.2
Karunatillake, G.3
-
103
-
-
0029390692
-
Blast schedule planning and shiftwise production scheduling of an opencast iron ore mine
-
Sundar, D. K., D. Acharya. 1995. Blast schedule planning and shiftwise production scheduling of an opencast iron ore mine. Comput. Indust. Engrg. 28(4) 927-935.
-
(1995)
Comput. Indust. Engrg.
, vol.28
, Issue.4
, pp. 927-935
-
-
Sundar, D.K.1
Acharya., D.2
-
104
-
-
27144489688
-
A stochastic optimization approach to mine truck allocation
-
Ta, C., J. Kresta, J. Forbes, H. Marquez. 2005. A stochastic optimization approach to mine truck allocation. Internat. J. Surface Mining Reclamation Environ. 19(3) 162-175.
-
(2005)
Internat. J. Surface Mining Reclamation Environ.
, vol.19
, Issue.3
, pp. 162-175
-
-
Ta, C.1
Kresta, J.2
Forbes, J.3
Marquez., H.4
-
105
-
-
58049182835
-
Optimization models for scheduling ore and waste production in open pit mines
-
SME, Littleton, CO
-
Tan, S., R. Ramani. 1992. Optimization models for scheduling ore and waste production in open pit mines. Proc. 23rd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 781-791.
-
(1992)
Proc. 23rd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 781-791
-
-
Tan, S.1
Ramani., R.2
-
106
-
-
0020312013
-
Comparison of two underground haulage systems
-
SME, Littleton, CO
-
Topuz, E., C. Breeds, M. Karmis, C. Haycocks. 1982. Comparison of two underground haulage systems. Proc. 17th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 614-619.
-
(1982)
Proc. 17th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 614-619
-
-
Topuz, E.1
Breeds, C.2
Karmis, M.3
Haycocks., C.4
-
107
-
-
77953594119
-
A survey of operations research applications in the mining industry
-
Topuz, E., C. Duan. 1989. A survey of operations research applications in the mining industry. CIM Bull. 82(925) 48-50.
-
(1989)
CIM Bull.
, vol.82
, Issue.925
, pp. 48-50
-
-
Topuz, E.1
Duan., C.2
-
109
-
-
0026254120
-
Dispatch control of a fleet of remotecontrolled/ automatic load-haul-dump vehicles in underground mines
-
Vagenas, N. 1991. Dispatch control of a fleet of remotecontrolled/ automatic load-haul-dump vehicles in underground mines. Internat. J. Prod. Res. 29(11) 2347-2363.
-
(1991)
Internat. J. Prod. Res.
, vol.29
, Issue.11
, pp. 2347-2363
-
-
Vagenas, N.1
-
110
-
-
0035786156
-
A theorem on open-pit planning optimization and its application
-
H. Xie, Y. Wang, Y. Jiang, eds., CUMT, Beijing
-
Wang, Q., H. Sun. 2001. A theorem on open-pit planning optimization and its application. H. Xie, Y. Wang, Y. Jiang, eds. Proc. 29th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., CUMT, Beijing, 295-298.
-
(2001)
Proc. 29th Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 295-298
-
-
Wang, Q.1
Sun., H.2
-
111
-
-
0039043141
-
A truck dispatching system for a large open pit mine
-
G. Rand, ed., North Holland, Amsterdam
-
Weintraub, A., L. Barros, A. Magendzo, F. Ibarra, C. Ortiz. 1987. A truck dispatching system for a large open pit mine. G. Rand, ed. Proc. 11th Internat. Conf. Oper. Res. North Holland, Amsterdam, 650-662.
-
(1987)
Proc. 11th Internat. Conf. Oper. Res.
, pp. 650-662
-
-
Weintraub, A.1
Barros, L.2
Magendzo, A.3
Ibarra, F.4
Ortiz., C.5
-
112
-
-
39149115369
-
A priori and a posteriori aggregation procedures to reduce model size in MIP mine planning models
-
Weintraub, A., M. Pereira, X. Schultz. 2008. A priori and a posteriori aggregation procedures to reduce model size in MIP mine planning models. Electronic Notes Discrete Math. 30 297-302.
-
(2008)
Electronic Notes Discrete Math.
, vol.30
, pp. 297-302
-
-
Weintraub, A.1
Pereira, M.2
Schultz., X.3
-
113
-
-
11544264207
-
On improving truck/shovel productivity in open pit mines
-
SME, Littleton, CO
-
White, J., J. Olson. 1992. On improving truck/shovel productivity in open pit mines. Proc. 23rd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 739-746.
-
(1992)
Proc. 23rd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 739-746
-
-
White, J.1
Olson., J.2
-
116
-
-
0024861325
-
Dynamic programming in open pit mining sequence planning: A case study
-
A. Weiss, ed., SME, Littleton, CO
-
Wright, E. 1989. Dynamic programming in open pit mining sequence planning: A case study. A. Weiss, ed. Proc. 21st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., SME, Littleton, CO, 415-422.
-
(1989)
Proc. 21st Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, pp. 415-422
-
-
Wright, E.1
-
117
-
-
84859607277
-
Optimization of planning and design in underground mines
-
Technische Universität Berlin, Berlin
-
Yun, Q., J. Liu, Y. Chen, G. Huang. 1990. Optimization of planning and design in underground mines. Proc. 22nd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos., Technische Universität Berlin, Berlin, 255.
-
(1990)
Proc. 22nd Internat. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) Sympos.
, vol.255
-
-
Yun, Q.1
Liu, J.2
Chen, Y.3
Huang., G.4
-
118
-
-
77953589997
-
Combining genetic algorithms and topological sort to optimize open-pit mine plans
-
M. Cardu, R. Ciccu, E. Lovera, E. Michelotti, eds., FIORDO S.r.l., Torino, Italy
-
Zhang, M. 2006. Combining genetic algorithms and topological sort to optimize open-pit mine plans. M. Cardu, R. Ciccu, E. Lovera, E. Michelotti, eds., Proc. 15th Internat. Sympos. Mine Planning Equipment Selection (MPES), FIORDO S.r.l., Torino, Italy, 1234-1239.
-
(2006)
Proc. 15th Internat. Sympos. Mine Planning Equipment Selection (MPES)
, pp. 1234-1239
-
-
Zhang, M.1
-
119
-
-
0032072202
-
A mathematical programming viewpoint for solving the ultimate pit problem
-
Underwood, R., B. Tolwinski. 1998. A mathematical programming viewpoint for solving the ultimate pit problem. Eur. J. Oper. Res. 107(1) 96-107.
-
(1998)
Eur. J. Oper. Res.
, vol.107
, Issue.1
, pp. 96-107
-
-
Underwood, R.1
Tolwinski, B.2
|