-
2
-
-
0003465839
-
-
Appelegate, R., Bixby, R., Chvatal, V. and Cook, W. (1995) Finding Cuts in the TSP (A Preliminary Report), pp. 95-105.
-
(1995)
Finding Cuts in the TSP (A Preliminary Report)
, pp. 95-105
-
-
Appelegate, R.1
Bixby, R.2
Chvatal, V.3
Cook, W.4
-
3
-
-
0003787146
-
-
Princeton University Press, Princeton, NJ
-
Bellman, R. E. (1957) Dynamic Programming, Princeton University Press, Princeton, NJ
-
(1957)
Dynamic Programming
-
-
Bellman, R.E.1
-
4
-
-
39649101819
-
Comparative analysis of open pit mine scheduling techniques for strategic mine planning of TINTAYA copper mine in Peru
-
Bernabe, D. and Dagdelen, K. Comparative analysis of open pit mine scheduling techniques for strategic mine planning of TINTAYA copper mine in Peru. SME Annual Meeting
-
SME Annual Meeting
-
-
Bernabe, D.1
Dagdelen, K.2
-
5
-
-
0042929889
-
An application of branch and cut to open pit mine scheduling
-
Caccetta, L. and Hill, S. P. (2003) An application of branch and cut to open pit mine scheduling. J. Global Optim., 27, pp. 349-365.
-
(2003)
J. Global Optim.
, vol.27
, pp. 349-365
-
-
Caccetta, L.1
Hill, S.P.2
-
7
-
-
39649086402
-
Open pit optimization - Strategies for improving economics of mining projects through mine planning
-
Dagdelen, K. (2000) Open pit optimization-strategies for improving economics of mining projects through mine planning. Application Computers for Mining Industry
-
(2000)
Application Computers for Mining Industry
-
-
Dagdelen, K.1
-
13
-
-
0011775861
-
Genetic algorithms for flexible scheduling of open pit operations
-
Denby, B., Schofield, D. and Surme, T. (1998) Genetic algorithms for flexible scheduling of open pit operations. Proceedings of APCOM'98, pp. 473-483.
-
(1998)
Proceedings of APCOM'98
, pp. 473-483
-
-
Denby, B.1
Schofield, D.2
Surme, T.3
-
14
-
-
0032434061
-
Conditional simulation algorithms for modeling orebody uncertainty in open pit optimization
-
Dimitrakopoulos, R. (1998) Conditional simulation algorithms for modeling orebody uncertainty in open pit optimization. Int. J. Surf. Mining, Reclam. Environ., 12, pp. 173-179.
-
(1998)
Int. J. Surf. Mining, Reclam. Environ.
, vol.12
, pp. 173-179
-
-
Dimitrakopoulos, R.1
-
16
-
-
0028555571
-
Risk assessment in reserve estimation and open pit planning
-
Dowd, P. A. (1994) Risk assessment in reserve estimation and open pit planning. Trans. Inst. Min. Metall. (Sec. A: Min. Industry), 103, pp. A148-A154.
-
(1994)
Trans. Inst. Min. Metall. (Sec. A: Min. Industry)
, vol.103
-
-
Dowd, P.A.1
-
18
-
-
0029419666
-
Open pit mine design and extraction sequencing by use of OR and AI concept
-
Elevli, B. (1995) Open pit mine design and extraction sequencing by use of OR and AI concept. Int. J. Surf. Mining, Reclam. Environ., 9, pp. 149-153.
-
(1995)
Int. J. Surf. Mining, Reclam. Environ.
, vol.9
, pp. 149-153
-
-
Elevli, B.1
-
19
-
-
0035485573
-
A simulative model for optimum open pit design
-
Erarslan, K. and Celebi, N. (2001) A simulative model for optimum open pit design. CIM Bull., 94, pp. 59-68.
-
(2001)
CIM Bull.
, vol.94
, pp. 59-68
-
-
Erarslan, K.1
Celebi, N.2
-
20
-
-
21644464661
-
Optimal mine production scheduling: Evaluation of large scale mathematical programming approaches
-
Gershon, M. E. (1983) Optimal mine production scheduling: Evaluation of large scale mathematical programming approaches. Int. J. Mining Eng., 1, pp. 315-329.
-
(1983)
Int. J. Mining Eng.
, vol.1
, pp. 315-329
-
-
Gershon, M.E.1
-
21
-
-
0023399320
-
An open pit production scheduler: Algorithm and implementation
-
Gershon, M. E. (1987) An open pit production scheduler: Algorithm and implementation. Mining Eng., pp. 793-796.
-
(1987)
Mining Eng.
, pp. 793-796
-
-
Gershon, M.E.1
-
22
-
-
33645821456
-
A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments
-
Gholamnejad, J., Osanloo, M. and Karimi, B. (2006) A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments. J. S. Afr. Inst. Mining Metall., 106, pp. 117-126.
-
(2006)
J. S. Afr. Inst. Mining Metall.
, vol.106
, pp. 117-126
-
-
Gholamnejad, J.1
Osanloo, M.2
Karimi, B.3
-
23
-
-
39649100537
-
Managing risk and waste mining in long-term production scheduling of open pit mine
-
Gody, M. and Dimitrakopoulos, R. Managing risk and waste mining in long-term production scheduling of open pit mine. SME Annual Meeting & Exhibition
-
SME Annual Meeting & Exhibition
-
-
Gody, M.1
Dimitrakopoulos, R.2
-
24
-
-
0016025814
-
Validation of sub-gradient optimization
-
North-Holland, Amsterdam
-
Held, M., Wolf, P. and Crowder, H. P. (1974) Validation of sub-gradient optimization. Mathematical Programming, 6, pp. 62-88. North-Holland, Amsterdam
-
(1974)
Mathematical Programming
, vol.6
, pp. 62-88
-
-
Held, M.1
Wolf, P.2
Crowder, H.P.3
-
29
-
-
0343911134
-
Choosing the optimum cutoff grade
-
Lane, K. F. (1964) Choosing the optimum cutoff grade. Colorado Sch. Mines Quart., 59, pp. 811-829.
-
(1964)
Colorado Sch. Mines Quart.
, vol.59
, pp. 811-829
-
-
Lane, K.F.1
-
30
-
-
0001886845
-
Optimum design of open-pit mines
-
Lerchs, H. and Grossman, F. (1965) Optimum design of open-pit mines. Trans. CIM, 58, pp. 47-54.
-
(1965)
Trans. CIM
, vol.58
, pp. 47-54
-
-
Lerchs, H.1
Grossman, F.2
-
32
-
-
84934305308
-
Optimum production scale and scheduling of open pit mines using revised 4D net work relaxation method
-
Mogi, G., Adachi, T., Akaike, A. and Yamatomi, J. Optimum production scale and scheduling of open pit mines using revised 4D net work relaxation method. Proceedings of the 17th International Symposium on Mine Planning and Equipment Selection, pp. 337-344.
-
Proceedings of the 17th International Symposium on Mine Planning and Equipment Selection
, pp. 337-344
-
-
Mogi, G.1
Adachi, T.2
Akaike, A.3
Yamatomi, J.4
-
33
-
-
0027599370
-
Open pit optimization-part 2: Production scheduling and inclusion of roadways
-
Onur, A. H. and Dowd, P. A. (1993) Open pit optimization-part 2: production scheduling and inclusion of roadways. Trans. Inst. Min. Metall. (Sec. A: Min. Industry), 102, pp. A105-A113.
-
(1993)
Trans. Inst. Min. Metall. (Sec. A: Min. Industry)
, vol.102
-
-
Onur, A.H.1
Dowd, P.A.2
-
34
-
-
84857346353
-
Determination of optimum cutoff grade of multiple metal deposits by iterated grid search method
-
Osanloo, M. and Ataei, M. (2002) Determination of optimum cutoff grade of multiple metal deposits by iterated grid search method. Int. J. Eng. Sci., 97, pp. 79-88.
-
(2002)
Int. J. Eng. Sci.
, vol.97
, pp. 79-88
-
-
Osanloo, M.1
Ataei, M.2
-
35
-
-
0347410996
-
Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits
-
Osanloo, M. and Ataei, M. (2003) Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits. Miner. Eng., 16, pp. 771-776.
-
(2003)
Miner. Eng.
, vol.16
, pp. 771-776
-
-
Osanloo, M.1
Ataei, M.2
-
36
-
-
0742322665
-
Combination of genetic algorithm and grid search method to determine optimum cutoff grades of multiple metal deposits
-
Osanloo, M. and Ataei, M. (2003) Combination of genetic algorithm and grid search method to determine optimum cutoff grades of multiple metal deposits. Int. J. Surf. Mining, Reclam. Environ., 18, pp. 60-78.
-
(2003)
Int. J. Surf. Mining, Reclam. Environ.
, vol.18
, pp. 60-78
-
-
Osanloo, M.1
Ataei, M.2
-
37
-
-
0348144716
-
Determination of optimum cutoff grades of multiple metal deposits by using golden section search method
-
Osanloo, M. and Ataei, M. (2003) Determination of optimum cutoff grades of multiple metal deposits by using golden section search method. J. S. Afr. Inst. Mining Metall., pp. 493-499.
-
(2003)
J. S. Afr. Inst. Mining Metall.
, pp. 493-499
-
-
Osanloo, M.1
Ataei, M.2
-
39
-
-
4544233521
-
Traditional and new MIP models for production scheduling with in-situ grade variability
-
Ramazan, S. and Dimitrakopoulos, R. (2004) Traditional and new MIP models for production scheduling with in-situ grade variability. Int. J. Surf. Mining, Reclam. Environ., 18, pp. 85-98.
-
(2004)
Int. J. Surf. Mining, Reclam. Environ.
, vol.18
, pp. 85-98
-
-
Ramazan, S.1
Dimitrakopoulos, R.2
-
40
-
-
21644439243
-
Fundamental tree algorithm in optimizing production scheduling for open pit mine design
-
Ramazan, S., Dagdelen, K. and Johnson, T. B. (2005) Fundamental tree algorithm in optimizing production scheduling for open pit mine design. Trans. Inst. Min. Metall. (Sec. A: Mining Technol.), 114, pp. A45-A114.
-
(2005)
Trans. Inst. Min. Metall. (Sec. A: Mining Technol.)
, vol.114
-
-
Ramazan, S.1
Dagdelen, K.2
Johnson, T.B.3
-
46
-
-
21644445377
-
Scheduling production for open pit mines
-
Tolwinski, B. (1998) Scheduling production for open pit mines. Proceedings of APCOM'98, pp. 19-23.
-
(1998)
Proceedings of APCOM'98
, pp. 19-23
-
-
Tolwinski, B.1
-
49
-
-
33646116556
-
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains
-
Torabi, S. A., Ghomi, S. M.T. Fatemi and Karimi, B. (2006) A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Eur. J. Oper. Res., 173, pp. 173-189.
-
(2006)
Eur. J. Oper. Res.
, vol.173
, pp. 173-189
-
-
Torabi, S.A.1
Ghomi, S.M.T.F.2
Karimi, B.3
-
50
-
-
19944366600
-
The common cycle economic lot scheduling in flexible job shops: The finite horizon case
-
Torabi, S. A., Karimi, B. and Ghomi, S. M.T. Fatemi (2005) The common cycle economic lot scheduling in flexible job shops: The finite horizon case. Int. J. Prod. Econ., 97, pp. 52-65.
-
(2005)
Int. J. Prod. Econ.
, vol.97
, pp. 52-65
-
-
Torabi, S.A.1
Karimi, B.2
Ghomi, S.M.T.3
Fatemi4
-
51
-
-
0034021292
-
Mineral resource+engineering, economic and legal feasibility=ore reserve
-
Vallee, M. (2000) Mineral resource+engineering, economic and legal feasibility=ore reserve. CIM Bull., 90, pp. 53-61.
-
(2000)
CIM Bull.
, vol.90
, pp. 53-61
-
-
Vallee, M.1
-
52
-
-
84937425948
-
Meta-Heuristics: The State of the Art
-
Voss, S. (2001) Meta-Heuristics: The State of the Art. Local Search for Planning and Scheduling, LNAI 2148, pp. 1-23.
-
(2001)
Local Search for Planning and Scheduling
, vol.2148 LNAI
, pp. 1-23
-
-
Voss, S.1
-
53
-
-
0012339635
-
Alternative to parameterization in finding a series of maximum-metal pits for production planning
-
Wang, Q. and Sevim, H. (1995) Alternative to parameterization in finding a series of maximum-metal pits for production planning. Mining Eng., pp. 178-182.
-
(1995)
Mining Eng.
, pp. 178-182
-
-
Wang, Q.1
Sevim, H.2
-
54
-
-
39649115534
-
What they don't teach you in mining school: Tips and tricks with pit optimizers
-
South African Institute of Mining and Metallurgy, Johannesburg
-
Wharton, C. L. (1996) What they don't teach you in mining school: Tips and tricks with pit optimizers. Surface Mining, pp. 17-22. South African Institute of Mining and Metallurgy, Johannesburg
-
(1996)
Surface Mining
, pp. 17-22
-
-
Wharton, C.L.1
|