Long-term open pit mine production planning: A review of models and algorithms

Author keywords

Deterministic approach; Long term production planning; Open pit mine; Uncertainty based approach

Indexed keywords

ALGORITHMS; MATHEMATICAL MODELS; OPTIMIZATION; PRODUCTION ENGINEERING; UNCERTAIN SYSTEMS;

EID: 39649091627     PISSN: 17480930     EISSN: 17480949     Source Type: Journal    
DOI: 10.1080/17480930601118947     Document Type: Review
Times cited : (139)

References (58)
  • 3
    • 0003787146 scopus 로고
    • Princeton University Press, Princeton, NJ
    • Bellman, R. E. (1957) Dynamic Programming, Princeton University Press, Princeton, NJ
    • (1957) Dynamic Programming
    • Bellman, R.E.1
  • 4
    • 39649101819 scopus 로고    scopus 로고
    • Comparative analysis of open pit mine scheduling techniques for strategic mine planning of TINTAYA copper mine in Peru
    • Bernabe, D. and Dagdelen, K. Comparative analysis of open pit mine scheduling techniques for strategic mine planning of TINTAYA copper mine in Peru. SME Annual Meeting
    • SME Annual Meeting
    • Bernabe, D.1    Dagdelen, K.2
  • 5
    • 0042929889 scopus 로고    scopus 로고
    • An application of branch and cut to open pit mine scheduling
    • Caccetta, L. and Hill, S. P. (2003) An application of branch and cut to open pit mine scheduling. J. Global Optim., 27, pp. 349-365.
    • (2003) J. Global Optim. , vol.27 , pp. 349-365
    • Caccetta, L.1    Hill, S.P.2
  • 7
    • 39649086402 scopus 로고    scopus 로고
    • Open pit optimization - Strategies for improving economics of mining projects through mine planning
    • Dagdelen, K. (2000) Open pit optimization-strategies for improving economics of mining projects through mine planning. Application Computers for Mining Industry
    • (2000) Application Computers for Mining Industry
    • Dagdelen, K.1
  • 13
    • 0011775861 scopus 로고    scopus 로고
    • Genetic algorithms for flexible scheduling of open pit operations
    • Denby, B., Schofield, D. and Surme, T. (1998) Genetic algorithms for flexible scheduling of open pit operations. Proceedings of APCOM'98, pp. 473-483.
    • (1998) Proceedings of APCOM'98 , pp. 473-483
    • Denby, B.1    Schofield, D.2    Surme, T.3
  • 14
    • 0032434061 scopus 로고    scopus 로고
    • Conditional simulation algorithms for modeling orebody uncertainty in open pit optimization
    • Dimitrakopoulos, R. (1998) Conditional simulation algorithms for modeling orebody uncertainty in open pit optimization. Int. J. Surf. Mining, Reclam. Environ., 12, pp. 173-179.
    • (1998) Int. J. Surf. Mining, Reclam. Environ. , vol.12 , pp. 173-179
    • Dimitrakopoulos, R.1
  • 16
  • 18
    • 0029419666 scopus 로고
    • Open pit mine design and extraction sequencing by use of OR and AI concept
    • Elevli, B. (1995) Open pit mine design and extraction sequencing by use of OR and AI concept. Int. J. Surf. Mining, Reclam. Environ., 9, pp. 149-153.
    • (1995) Int. J. Surf. Mining, Reclam. Environ. , vol.9 , pp. 149-153
    • Elevli, B.1
  • 19
    • 0035485573 scopus 로고    scopus 로고
    • A simulative model for optimum open pit design
    • Erarslan, K. and Celebi, N. (2001) A simulative model for optimum open pit design. CIM Bull., 94, pp. 59-68.
    • (2001) CIM Bull. , vol.94 , pp. 59-68
    • Erarslan, K.1    Celebi, N.2
  • 20
    • 21644464661 scopus 로고
    • Optimal mine production scheduling: Evaluation of large scale mathematical programming approaches
    • Gershon, M. E. (1983) Optimal mine production scheduling: Evaluation of large scale mathematical programming approaches. Int. J. Mining Eng., 1, pp. 315-329.
    • (1983) Int. J. Mining Eng. , vol.1 , pp. 315-329
    • Gershon, M.E.1
  • 21
    • 0023399320 scopus 로고
    • An open pit production scheduler: Algorithm and implementation
    • Gershon, M. E. (1987) An open pit production scheduler: Algorithm and implementation. Mining Eng., pp. 793-796.
    • (1987) Mining Eng. , pp. 793-796
    • Gershon, M.E.1
  • 22
    • 33645821456 scopus 로고    scopus 로고
    • A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments
    • Gholamnejad, J., Osanloo, M. and Karimi, B. (2006) A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments. J. S. Afr. Inst. Mining Metall., 106, pp. 117-126.
    • (2006) J. S. Afr. Inst. Mining Metall. , vol.106 , pp. 117-126
    • Gholamnejad, J.1    Osanloo, M.2    Karimi, B.3
  • 23
    • 39649100537 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling of open pit mine
    • Gody, M. and Dimitrakopoulos, R. Managing risk and waste mining in long-term production scheduling of open pit mine. SME Annual Meeting & Exhibition
    • SME Annual Meeting & Exhibition
    • Gody, M.1    Dimitrakopoulos, R.2
  • 24
    • 0016025814 scopus 로고
    • Validation of sub-gradient optimization
    • North-Holland, Amsterdam
    • Held, M., Wolf, P. and Crowder, H. P. (1974) Validation of sub-gradient optimization. Mathematical Programming, 6, pp. 62-88. North-Holland, Amsterdam
    • (1974) Mathematical Programming , vol.6 , pp. 62-88
    • Held, M.1    Wolf, P.2    Crowder, H.P.3
  • 29
    • 0343911134 scopus 로고
    • Choosing the optimum cutoff grade
    • Lane, K. F. (1964) Choosing the optimum cutoff grade. Colorado Sch. Mines Quart., 59, pp. 811-829.
    • (1964) Colorado Sch. Mines Quart. , vol.59 , pp. 811-829
    • Lane, K.F.1
  • 30
    • 0001886845 scopus 로고
    • Optimum design of open-pit mines
    • Lerchs, H. and Grossman, F. (1965) Optimum design of open-pit mines. Trans. CIM, 58, pp. 47-54.
    • (1965) Trans. CIM , vol.58 , pp. 47-54
    • Lerchs, H.1    Grossman, F.2
  • 33
    • 0027599370 scopus 로고
    • Open pit optimization-part 2: Production scheduling and inclusion of roadways
    • Onur, A. H. and Dowd, P. A. (1993) Open pit optimization-part 2: production scheduling and inclusion of roadways. Trans. Inst. Min. Metall. (Sec. A: Min. Industry), 102, pp. A105-A113.
    • (1993) Trans. Inst. Min. Metall. (Sec. A: Min. Industry) , vol.102
    • Onur, A.H.1    Dowd, P.A.2
  • 34
    • 84857346353 scopus 로고    scopus 로고
    • Determination of optimum cutoff grade of multiple metal deposits by iterated grid search method
    • Osanloo, M. and Ataei, M. (2002) Determination of optimum cutoff grade of multiple metal deposits by iterated grid search method. Int. J. Eng. Sci., 97, pp. 79-88.
    • (2002) Int. J. Eng. Sci. , vol.97 , pp. 79-88
    • Osanloo, M.1    Ataei, M.2
  • 35
    • 0347410996 scopus 로고    scopus 로고
    • Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits
    • Osanloo, M. and Ataei, M. (2003) Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits. Miner. Eng., 16, pp. 771-776.
    • (2003) Miner. Eng. , vol.16 , pp. 771-776
    • Osanloo, M.1    Ataei, M.2
  • 36
    • 0742322665 scopus 로고    scopus 로고
    • Combination of genetic algorithm and grid search method to determine optimum cutoff grades of multiple metal deposits
    • Osanloo, M. and Ataei, M. (2003) Combination of genetic algorithm and grid search method to determine optimum cutoff grades of multiple metal deposits. Int. J. Surf. Mining, Reclam. Environ., 18, pp. 60-78.
    • (2003) Int. J. Surf. Mining, Reclam. Environ. , vol.18 , pp. 60-78
    • Osanloo, M.1    Ataei, M.2
  • 37
    • 0348144716 scopus 로고    scopus 로고
    • Determination of optimum cutoff grades of multiple metal deposits by using golden section search method
    • Osanloo, M. and Ataei, M. (2003) Determination of optimum cutoff grades of multiple metal deposits by using golden section search method. J. S. Afr. Inst. Mining Metall., pp. 493-499.
    • (2003) J. S. Afr. Inst. Mining Metall. , pp. 493-499
    • Osanloo, M.1    Ataei, M.2
  • 39
    • 4544233521 scopus 로고    scopus 로고
    • Traditional and new MIP models for production scheduling with in-situ grade variability
    • Ramazan, S. and Dimitrakopoulos, R. (2004) Traditional and new MIP models for production scheduling with in-situ grade variability. Int. J. Surf. Mining, Reclam. Environ., 18, pp. 85-98.
    • (2004) Int. J. Surf. Mining, Reclam. Environ. , vol.18 , pp. 85-98
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 46
    • 21644445377 scopus 로고    scopus 로고
    • Scheduling production for open pit mines
    • Tolwinski, B. (1998) Scheduling production for open pit mines. Proceedings of APCOM'98, pp. 19-23.
    • (1998) Proceedings of APCOM'98 , pp. 19-23
    • Tolwinski, B.1
  • 49
    • 33646116556 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains
    • Torabi, S. A., Ghomi, S. M.T. Fatemi and Karimi, B. (2006) A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Eur. J. Oper. Res., 173, pp. 173-189.
    • (2006) Eur. J. Oper. Res. , vol.173 , pp. 173-189
    • Torabi, S.A.1    Ghomi, S.M.T.F.2    Karimi, B.3
  • 50
    • 19944366600 scopus 로고    scopus 로고
    • The common cycle economic lot scheduling in flexible job shops: The finite horizon case
    • Torabi, S. A., Karimi, B. and Ghomi, S. M.T. Fatemi (2005) The common cycle economic lot scheduling in flexible job shops: The finite horizon case. Int. J. Prod. Econ., 97, pp. 52-65.
    • (2005) Int. J. Prod. Econ. , vol.97 , pp. 52-65
    • Torabi, S.A.1    Karimi, B.2    Ghomi, S.M.T.3    Fatemi4
  • 51
    • 0034021292 scopus 로고    scopus 로고
    • Mineral resource+engineering, economic and legal feasibility=ore reserve
    • Vallee, M. (2000) Mineral resource+engineering, economic and legal feasibility=ore reserve. CIM Bull., 90, pp. 53-61.
    • (2000) CIM Bull. , vol.90 , pp. 53-61
    • Vallee, M.1
  • 52
    • 84937425948 scopus 로고    scopus 로고
    • Meta-Heuristics: The State of the Art
    • Voss, S. (2001) Meta-Heuristics: The State of the Art. Local Search for Planning and Scheduling, LNAI 2148, pp. 1-23.
    • (2001) Local Search for Planning and Scheduling , vol.2148 LNAI , pp. 1-23
    • Voss, S.1
  • 53
    • 0012339635 scopus 로고
    • Alternative to parameterization in finding a series of maximum-metal pits for production planning
    • Wang, Q. and Sevim, H. (1995) Alternative to parameterization in finding a series of maximum-metal pits for production planning. Mining Eng., pp. 178-182.
    • (1995) Mining Eng. , pp. 178-182
    • Wang, Q.1    Sevim, H.2
  • 54
    • 39649115534 scopus 로고    scopus 로고
    • What they don't teach you in mining school: Tips and tricks with pit optimizers
    • South African Institute of Mining and Metallurgy, Johannesburg
    • Wharton, C. L. (1996) What they don't teach you in mining school: Tips and tricks with pit optimizers. Surface Mining, pp. 17-22. South African Institute of Mining and Metallurgy, Johannesburg
    • (1996) Surface Mining , pp. 17-22
    • Wharton, C.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.