-
1
-
-
33750462063
-
-
Bernabe, D., 2001. Comparative analysis of open pit mine scheduling techniques for strategic mine planning of a copper mine in Southern Peru. M.Sc. Thesis, Colorado School of Mines, Golden CO.
-
-
-
-
2
-
-
33750433626
-
-
Dagdelen, K., 1985. Optimum multi-period open pit mine production scheduling by Lagrangian parameterization. Ph.D. Thesis, Colorado School of Mines, Golden, CO.
-
-
-
-
3
-
-
0001391104
-
Decomposition principle for linear programs
-
Dantzig G.B., and Wolfe P. Decomposition principle for linear programs. Operations Research 8 1 (1960) 101-111
-
(1960)
Operations Research
, vol.8
, Issue.1
, pp. 101-111
-
-
Dantzig, G.B.1
Wolfe, P.2
-
4
-
-
35548992349
-
Uncertainty based production scheduling in open pit mining
-
Dimitrakopoulos R., and Ramazan S. Uncertainty based production scheduling in open pit mining. SME Transactions 316 (2004)
-
(2004)
SME Transactions
, vol.316
-
-
Dimitrakopoulos, R.1
Ramazan, S.2
-
5
-
-
21644464661
-
Optimal mine production scheduling evaluation of large scale mathematical programming approaches
-
Gershon M.E. Optimal mine production scheduling evaluation of large scale mathematical programming approaches. International Journal of Mining Engineering 1 (1983) 315-329
-
(1983)
International Journal of Mining Engineering
, vol.1
, pp. 315-329
-
-
Gershon, M.E.1
-
6
-
-
33750463822
-
Managing risk and waste mining in long-term production scheduling
-
Godoy M., and Dimitrakopoulos R. Managing risk and waste mining in long-term production scheduling. SME Transactions 316 (2004)
-
(2004)
SME Transactions
, vol.316
-
-
Godoy, M.1
Dimitrakopoulos, R.2
-
7
-
-
0034313704
-
Performance analysis and best implementations of old and new algorithms for the open-pit mining problem
-
Hochbaum D.S., and Chen A. Performance analysis and best implementations of old and new algorithms for the open-pit mining problem. Operations Research 48 (2000) 894-913
-
(2000)
Operations Research
, vol.48
, pp. 894-913
-
-
Hochbaum, D.S.1
Chen, A.2
-
8
-
-
33750468745
-
-
Johnson, T.B., 1968. Optimum open pit mine production scheduling. Ph.D. Dissertation, University of California, Berkeley, CA.
-
-
-
-
9
-
-
33750477051
-
-
Lemieux, M., 1979. Moving Cone Optimizing Algorithm. Computer methods for the 80's in the mineral industry. In: Weiss A. (Ed.), SME-AIME, pp. 329-345.
-
-
-
-
11
-
-
33750484367
-
-
Ramazan, S., 1996. A new push back design algorithm in open pit mining. M.Sc. Thesis, Colorado School of Mines, Golden, CO.
-
-
-
-
12
-
-
33750432225
-
-
Ramazan, S., 2001. Open pit mine scheduling based on fundamental tree algorithm. Ph.D. Thesis, Colorado School of Mines, Golden, CO.
-
-
-
-
13
-
-
21644484543
-
Recent applications of operations research and efficient MIP formulations in open pit mining
-
Ramazan S., and Dimitrakopoulos R. Recent applications of operations research and efficient MIP formulations in open pit mining. SME Transactions 316 (2004)
-
(2004)
SME Transactions
, vol.316
-
-
Ramazan, S.1
Dimitrakopoulos, R.2
-
14
-
-
33750452385
-
-
Seymour, F., 1995. Pit limit parameterization from modified 3D Lerchs-Grossmann algorithm. SME Preprint Number: 95-96.
-
-
-
-
15
-
-
33750471251
-
-
Tolwinski, B., 1998. Scheduling production for open pit mines. In: Proc. 27th Internat. APCOM Symp., pp. 651-662.
-
-
-
-
16
-
-
33750438864
-
-
Wang, Q., Sevim, H., 1993. An alternative to parameterization in finding a series of maximum-metal pits for production planning. In: Proc. 24th Internat. APCOM Symp., pp. 168-175.
-
-
-
-
17
-
-
33750451309
-
-
Warton, C., 2000. Add value to your mine through improved long term scheduling. In: Whittle North American Mine Planning Conference, CO.
-
-
-
-
18
-
-
33750490153
-
-
Whittle, J., 1988. Beyond optimisation in open pit design. In: Proc. Canadian Conf. on Computer Applications in the Mineral Industries, Rotterdam, pp. 331-337.
-
-
-
-
19
-
-
33750470465
-
-
Whittle, D., 2000. Proteus environment: Sensitivity work made easy. In: Whittle North American Mine Planning Conference, CO.
-
-
-
|