메뉴 건너뛰기




Volumn 176, Issue 2, 2007, Pages 1205-1218

Using aggregation to optimize long-term production planning at an underground mine

Author keywords

Heuristic integer programming algorithms; Mining and metals industries; Production scheduling applications

Indexed keywords

COMPUTATION TIME; PLANNED PRODUCTION; UNDERGROUND MINE;

EID: 33749577061     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.09.008     Document Type: Article
Times cited : (61)

References (31)
  • 1
    • 33749545287 scopus 로고    scopus 로고
    • Almgren, T., 1994. An approach to long range production and development planning with application to the Kiruna mine, Sweden. Luleå University of Technology, Doctoral Thesis number 1994:143D.
  • 2
    • 0011043496 scopus 로고    scopus 로고
    • A new knapsack solution approach by integer equivalent aggregation and consistency determination
    • Babayev D., Glover F., and Ryan J. A new knapsack solution approach by integer equivalent aggregation and consistency determination. INFORMS Journal on Computing 9 1 (1997) 43-50
    • (1997) INFORMS Journal on Computing , vol.9 , Issue.1 , pp. 43-50
    • Babayev, D.1    Glover, F.2    Ryan, J.3
  • 3
    • 33749556707 scopus 로고    scopus 로고
    • Bell Laboratories, 2001. AMPL, Version 10.6.16.
  • 4
    • 0035410522 scopus 로고    scopus 로고
    • Modeling practical lot-sizing problems as mixed-integer programs
    • Belvaux G., and Wolsey L. Modeling practical lot-sizing problems as mixed-integer programs. Management Science 47 7 (2001) 993-1007
    • (2001) Management Science , vol.47 , Issue.7 , pp. 993-1007
    • Belvaux, G.1    Wolsey, L.2
  • 5
    • 0034244734 scopus 로고    scopus 로고
    • The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach
    • Bertsimas D., and Patterson S. The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach. Transportation Science 34 2 (2000) 239-255
    • (2000) Transportation Science , vol.34 , Issue.2 , pp. 239-255
    • Bertsimas, D.1    Patterson, S.2
  • 6
    • 0039192902 scopus 로고    scopus 로고
    • Underground planning at stillwater mining company
    • Carlyle M., and Eaves B. Underground planning at stillwater mining company. Interfaces 31 4 (2001) 50-60
    • (2001) Interfaces , vol.31 , Issue.4 , pp. 50-60
    • Carlyle, M.1    Eaves, B.2
  • 8
    • 0028482937 scopus 로고
    • Preliminary screening procedure for the MINLP synthesis of process systems-I. Aggregation and decomposition techniques
    • Daichendt M., and Grossmann I. Preliminary screening procedure for the MINLP synthesis of process systems-I. Aggregation and decomposition techniques. Computers and Chemical Engineering 18 8 (1994) 663-677
    • (1994) Computers and Chemical Engineering , vol.18 , Issue.8 , pp. 663-677
    • Daichendt, M.1    Grossmann, I.2
  • 11
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant production
    • Harjunkoski I., and Grossmann I. A decomposition approach for the scheduling of a steel plant production. Computers and Chemical Engineering 25 (2001) 1647-1660
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.2
  • 12
    • 33749547427 scopus 로고    scopus 로고
    • ILOG Corporation, 2001. CPLEX, Version 7.0.
  • 14
    • 0020588533 scopus 로고
    • Polynomial-time aggregation of integer programming problems
    • Kannan R. Polynomial-time aggregation of integer programming problems. Journal of the Association for Computing Machinery 30 1 (1983) 133-145
    • (1983) Journal of the Association for Computing Machinery , vol.30 , Issue.1 , pp. 133-145
    • Kannan, R.1
  • 15
    • 2442504659 scopus 로고    scopus 로고
    • Implementing a production schedule at LKAB's Kiruna mine
    • Kuchta M., Newman A., and Topal E. Implementing a production schedule at LKAB's Kiruna mine. Interfaces 34 2 (2004) 124-134
    • (2004) Interfaces , vol.34 , Issue.2 , pp. 124-134
    • Kuchta, M.1    Newman, A.2    Topal, E.3
  • 16
    • 0030241523 scopus 로고    scopus 로고
    • Multilocation plant sizing and timing problem: A study of spatial-temporal decomposition procedure
    • Kulkarni R., and Mohanty R. Multilocation plant sizing and timing problem: A study of spatial-temporal decomposition procedure. Production Planning and Control 7 5 (1996) 471-481
    • (1996) Production Planning and Control , vol.7 , Issue.5 , pp. 471-481
    • Kulkarni, R.1    Mohanty, R.2
  • 17
    • 0035328755 scopus 로고    scopus 로고
    • Aggregation and mixed integer rounding to solve MIPs
    • Marchand H., and Wolsey L. Aggregation and mixed integer rounding to solve MIPs. Operations Research 49 3 (2001) 363-371
    • (2001) Operations Research , vol.49 , Issue.3 , pp. 363-371
    • Marchand, H.1    Wolsey, L.2
  • 21
    • 33749583372 scopus 로고    scopus 로고
    • Newman, A., Kuchta, M., Martinez, M., 2005. Long- and short-term production at LKAB's Kiruna mine. Working Paper, Division of Economics and Business and Mining Engineering Department, Colorado School of Mines, Golden, CO, January.
  • 22
    • 0036563129 scopus 로고    scopus 로고
    • A stochastic convergence model for portfolio selection
    • Puelz A. A stochastic convergence model for portfolio selection. Operations Research 50 3 (2002) 462-476
    • (2002) Operations Research , vol.50 , Issue.3 , pp. 462-476
    • Puelz, A.1
  • 24
    • 0000606094 scopus 로고
    • Aggregation and disaggregation techniques and methodology in optimization
    • Rogers D., Plante R., Wong R., and Evans J. Aggregation and disaggregation techniques and methodology in optimization. Operations Research 39 4 (1991) 553-582
    • (1991) Operations Research , vol.39 , Issue.4 , pp. 553-582
    • Rogers, D.1    Plante, R.2    Wong, R.3    Evans, J.4
  • 25
    • 11844254419 scopus 로고    scopus 로고
    • The long-term mine production scheduling problem
    • Sarin S., and West-Hansen J. The long-term mine production scheduling problem. IIE Transactions 37 2 (2005) 109-121
    • (2005) IIE Transactions , vol.37 , Issue.2 , pp. 109-121
    • Sarin, S.1    West-Hansen, J.2
  • 26
    • 0032443047 scopus 로고    scopus 로고
    • Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX
    • Smith M. Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX. International Journal of Surface Mining (1998) 149-155
    • (1998) International Journal of Surface Mining , pp. 149-155
    • Smith, M.1
  • 27
    • 33749548503 scopus 로고    scopus 로고
    • Smith, M., Sheppard, I., Karunatillake, G., 2003. Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines. In: 31st International APCOM Symposium Proceedings, Capetown, South Africa, pp. 465-474.
  • 28
    • 0031275306 scopus 로고    scopus 로고
    • A procedure for optimizing tactical response in oil spill clean up operations
    • Srinivasa A., and Wilhelm W. A procedure for optimizing tactical response in oil spill clean up operations. European Journal of Operational Research 102 3 (1997) 554-574
    • (1997) European Journal of Operational Research , vol.102 , Issue.3 , pp. 554-574
    • Srinivasa, A.1    Wilhelm, W.2
  • 29
    • 33749568969 scopus 로고    scopus 로고
    • Topal, E., 1998. Long and short term production scheduling of the Kiruna iron ore mine, Kiruna, Sweden. Master of Science Thesis, Colorado School of Mines, Golden, Colorado.
  • 30
    • 33749558616 scopus 로고    scopus 로고
    • Trout, L., 1995. Underground mine production scheduling using mixed integer programming. In: 25th International APCOM Symposium Proceedings, Brisbane, Australia, pp. 395-400.
  • 31
    • 33749560113 scopus 로고    scopus 로고
    • Winkler, B., 1996. Using MILP to optimize period fix costs in complex mine sequencing and scheduling problems. In: 26th International APCOM Symposium Proceedings, Pennsylvania State University, University Park, Pennsylvania, pp. 441-446.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.