Almgren, T., 1994. An approach to long range production and development planning with application to the Kiruna mine, Sweden. Luleå University of Technology, Doctoral Thesis number 1994:143D.
-
-
-
-
2
-
-
0011043496
-
A new knapsack solution approach by integer equivalent aggregation and consistency determination
-
Babayev D., Glover F., and Ryan J. A new knapsack solution approach by integer equivalent aggregation and consistency determination. INFORMS Journal on Computing 9 1 (1997) 43-50
-
(1997)
INFORMS Journal on Computing
, vol.9
, Issue.1
, pp. 43-50
-
-
Babayev, D.1
Glover, F.2
Ryan, J.3
-
3
-
-
33749556707
-
-
Bell Laboratories, 2001. AMPL, Version 10.6.16.
-
-
-
-
4
-
-
0035410522
-
Modeling practical lot-sizing problems as mixed-integer programs
-
Belvaux G., and Wolsey L. Modeling practical lot-sizing problems as mixed-integer programs. Management Science 47 7 (2001) 993-1007
-
(2001)
Management Science
, vol.47
, Issue.7
, pp. 993-1007
-
-
Belvaux, G.1
Wolsey, L.2
-
5
-
-
0034244734
-
The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach
-
Bertsimas D., and Patterson S. The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach. Transportation Science 34 2 (2000) 239-255
-
(2000)
Transportation Science
, vol.34
, Issue.2
, pp. 239-255
-
-
Bertsimas, D.1
Patterson, S.2
-
6
-
-
0039192902
-
Underground planning at stillwater mining company
-
Carlyle M., and Eaves B. Underground planning at stillwater mining company. Interfaces 31 4 (2001) 50-60
-
(2001)
Interfaces
, vol.31
, Issue.4
, pp. 50-60
-
-
Carlyle, M.1
Eaves, B.2
-
7
-
-
2442525326
-
Linear programming model applied to scheduling of iron ore production at the Kiruna mine, Kiruna, Sweden
-
Dagdelen K., Kuchta M., and Topal E. Linear programming model applied to scheduling of iron ore production at the Kiruna mine, Kiruna, Sweden. Transactions of the Society for Mining, Metallurgy, and Exploration, Inc. 312 (2001) 194-198
-
(2001)
Transactions of the Society for Mining, Metallurgy, and Exploration, Inc.
, vol.312
, pp. 194-198
-
-
Dagdelen, K.1
Kuchta, M.2
Topal, E.3
-
8
-
-
0028482937
-
Preliminary screening procedure for the MINLP synthesis of process systems-I. Aggregation and decomposition techniques
-
Daichendt M., and Grossmann I. Preliminary screening procedure for the MINLP synthesis of process systems-I. Aggregation and decomposition techniques. Computers and Chemical Engineering 18 8 (1994) 663-677
-
(1994)
Computers and Chemical Engineering
, vol.18
, Issue.8
, pp. 663-677
-
-
Daichendt, M.1
Grossmann, I.2
-
11
-
-
0035890549
-
A decomposition approach for the scheduling of a steel plant production
-
Harjunkoski I., and Grossmann I. A decomposition approach for the scheduling of a steel plant production. Computers and Chemical Engineering 25 (2001) 1647-1660
-
(2001)
Computers and Chemical Engineering
, vol.25
, pp. 1647-1660
-
-
Harjunkoski, I.1
Grossmann, I.2
-
12
-
-
33749547427
-
-
ILOG Corporation, 2001. CPLEX, Version 7.0.
-
-
-
-
14
-
-
0020588533
-
Polynomial-time aggregation of integer programming problems
-
Kannan R. Polynomial-time aggregation of integer programming problems. Journal of the Association for Computing Machinery 30 1 (1983) 133-145
-
(1983)
Journal of the Association for Computing Machinery
, vol.30
, Issue.1
, pp. 133-145
-
-
Kannan, R.1
-
15
-
-
2442504659
-
Implementing a production schedule at LKAB's Kiruna mine
-
Kuchta M., Newman A., and Topal E. Implementing a production schedule at LKAB's Kiruna mine. Interfaces 34 2 (2004) 124-134
-
(2004)
Interfaces
, vol.34
, Issue.2
, pp. 124-134
-
-
Kuchta, M.1
Newman, A.2
Topal, E.3
-
16
-
-
0030241523
-
Multilocation plant sizing and timing problem: A study of spatial-temporal decomposition procedure
-
Kulkarni R., and Mohanty R. Multilocation plant sizing and timing problem: A study of spatial-temporal decomposition procedure. Production Planning and Control 7 5 (1996) 471-481
-
(1996)
Production Planning and Control
, vol.7
, Issue.5
, pp. 471-481
-
-
Kulkarni, R.1
Mohanty, R.2
-
17
-
-
0035328755
-
Aggregation and mixed integer rounding to solve MIPs
-
Marchand H., and Wolsey L. Aggregation and mixed integer rounding to solve MIPs. Operations Research 49 3 (2001) 363-371
-
(2001)
Operations Research
, vol.49
, Issue.3
, pp. 363-371
-
-
Marchand, H.1
Wolsey, L.2
-
21
-
-
33749583372
-
-
Newman, A., Kuchta, M., Martinez, M., 2005. Long- and short-term production at LKAB's Kiruna mine. Working Paper, Division of Economics and Business and Mining Engineering Department, Colorado School of Mines, Golden, CO, January.
-
-
-
-
22
-
-
0036563129
-
A stochastic convergence model for portfolio selection
-
Puelz A. A stochastic convergence model for portfolio selection. Operations Research 50 3 (2002) 462-476
-
(2002)
Operations Research
, vol.50
, Issue.3
, pp. 462-476
-
-
Puelz, A.1
-
24
-
-
0000606094
-
Aggregation and disaggregation techniques and methodology in optimization
-
Rogers D., Plante R., Wong R., and Evans J. Aggregation and disaggregation techniques and methodology in optimization. Operations Research 39 4 (1991) 553-582
-
(1991)
Operations Research
, vol.39
, Issue.4
, pp. 553-582
-
-
Rogers, D.1
Plante, R.2
Wong, R.3
Evans, J.4
-
25
-
-
11844254419
-
The long-term mine production scheduling problem
-
Sarin S., and West-Hansen J. The long-term mine production scheduling problem. IIE Transactions 37 2 (2005) 109-121
-
(2005)
IIE Transactions
, vol.37
, Issue.2
, pp. 109-121
-
-
Sarin, S.1
West-Hansen, J.2
-
26
-
-
0032443047
-
Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX
-
Smith M. Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX. International Journal of Surface Mining (1998) 149-155
-
(1998)
International Journal of Surface Mining
, pp. 149-155
-
-
Smith, M.1
-
27
-
-
33749548503
-
-
Smith, M., Sheppard, I., Karunatillake, G., 2003. Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines. In: 31st International APCOM Symposium Proceedings, Capetown, South Africa, pp. 465-474.
-
-
-
-
28
-
-
0031275306
-
A procedure for optimizing tactical response in oil spill clean up operations
-
Srinivasa A., and Wilhelm W. A procedure for optimizing tactical response in oil spill clean up operations. European Journal of Operational Research 102 3 (1997) 554-574
-
(1997)
European Journal of Operational Research
, vol.102
, Issue.3
, pp. 554-574
-
-
Srinivasa, A.1
Wilhelm, W.2
-
29
-
-
33749568969
-
-
Topal, E., 1998. Long and short term production scheduling of the Kiruna iron ore mine, Kiruna, Sweden. Master of Science Thesis, Colorado School of Mines, Golden, Colorado.
-
-
-
-
30
-
-
33749558616
-
-
Trout, L., 1995. Underground mine production scheduling using mixed integer programming. In: 25th International APCOM Symposium Proceedings, Brisbane, Australia, pp. 395-400.
-
-
-
-
31
-
-
33749560113
-
-
Winkler, B., 1996. Using MILP to optimize period fix costs in complex mine sequencing and scheduling problems. In: 26th International APCOM Symposium Proceedings, Pennsylvania State University, University Park, Pennsylvania, pp. 441-446.
-
-
-
|