1
-
-
0026880908
-
Expert System for Equipment Selection for Earthmoving operations
-
June
-
Amirkhanian, S. and Baker, N (1992), Expert System for Equipment Selection for Earthmoving operations, Journal of Construction Engineering and Management, 118(2), 318-331, June.
-
(1992)
Journal of Construction Engineering and Management
, vol.118
, Issue.2
, pp. 318-331
-
-
Amirkhanian, S.1
Baker, N.2
-
2
-
-
80053107437
-
Selection and sizing of mining equipment
-
Chapter 13.3, SME, Colorado, 2nd edition, 1992
-
Atkinson, T. (1992), Selection and sizing of mining equipment, Chapter 13.3, pp. 1311-1333, SME Mining Engineering Handbook, Vol 2. SME, Colorado, 2nd edition, 1992.
-
(1992)
SME Mining Engineering Handbook
, vol.2
, pp. 1311-1333
-
-
Atkinson, T.1
-
3
-
-
9144229659
-
An application of the analytic hierarchy process in equipment selection at Orhaneli open pit coal mine
-
June
-
Bascetin, A. (2004), An application of the analytic hierarchy process in equipment selection at Orhaneli open pit coal mine, Mining Technology, 113, A192-A199, June.
-
(2004)
Mining Technology
, vol.113
-
-
Bascetin, A.1
-
4
-
-
20244388109
-
A systematic decision making model for optimum surface mining equipment selection
-
Cebesoy, T., Gozen, M. and Yahsi, S. (1995), A systematic decision making model for optimum surface mining equipment selection, Mine Planning and Equipment Selection 1995, 369-377.
-
(1995)
Mine Planning and Equipment Selection
, vol.1995
, pp. 369-377
-
-
Cebesoy, T.1
Gozen, M.2
Yahsi, S.3
-
5
-
-
0032417263
-
An equipment selection and cost analysis system for openpit coal mines
-
Celebi, N. (1998), An equipment selection and cost analysis system for openpit coal mines, International Journal of Surface Mining, Reclamation and Environment, 12, 181-187.
-
(1998)
International Journal of Surface Mining, Reclamation and Environment
, vol.12
, pp. 181-187
-
-
Celebi, N.1
-
6
-
-
0028557665
-
Optimizing truck-loader matching
-
Gove, D. and Morgan, W. (1994), Optimizing truck-loader matching, Mining Engineering, 46(10), 1179-1185.
-
(1994)
Mining Engineering
, vol.46
, Issue.10
, pp. 1179-1185
-
-
Gove, D.1
Morgan, W.2
-
7
-
-
0028728388
-
Optimizing the number of Load-Haul-Dump machines in a Swedish mine by using queuing theory - A case study
-
Balkema: Rotterdam, 1994
-
Huang, Y. and Kumar, U. (1994), Optimizing the number of Load-Haul-Dump machines in a Swedish mine by using queuing theory - A case study, Mine Planning and Equipment Selection, Balkema: Rotterdam, 1994.
-
(1994)
Mine Planning and Equipment Selection
-
-
Huang, Y.1
Kumar, U.2
-
9
-
-
0025400898
-
Further development of integer programming in earthwork optimization
-
March
-
Jayawardane, A. and Harris, F. (1990), Further development of integer programming in earthwork optimization, Journal of Construction Engineering and Management, 116(1), 18-34, March.
-
(1990)
Journal of Construction Engineering and Management
, vol.116
, Issue.1
, pp. 18-34
-
-
Jayawardane, A.1
Harris, F.2
-
10
-
-
0034427864
-
Industry perspective on the role of equipment-based earthmoving simulation
-
Kannan, G., Schmitz, L. and Larsen, C. (2000), An industry perspective on the role of equipment-based earthmoving simulation, In Proceedings of the 2000 Winter Simulation Conference. 1945-1952. (Pubitemid 32869770)
-
(2000)
Winter Simulation Conference Proceedings
, vol.2
, pp. 1945-1952
-
-
Kannan, G.1
Schmitz, L.2
Larsen, C.3
-
11
-
-
18244389105
-
Truck Capacity Selection for Earthmoving
-
June
-
Karshenas, S. (1989), Truck Capacity Selection for Earthmoving, Journal of Construction Engineering and Management, 115(2), 212-227, June.
-
(1989)
Journal of Construction Engineering and Management
, vol.115
, Issue.2
, pp. 212-227
-
-
Karshenas, S.1
-
12
-
-
4243317709
-
Shovel-truck productivity and efficiency studies for overburden removal in an open-pit coal mine
-
Kesimal, A. (1998), Shovel-truck productivity and efficiency studies for overburden removal in an open-pit coal mine, Transactions of the Institute of Mining and Metallurgy A, 107, A37-A40.
-
(1998)
Transactions of the Institute of Mining and Metallurgy A
, vol.107
-
-
Kesimal, A.1
-
13
-
-
0012273372
-
-
Martin Consultants Inc., Colorado, USA
-
Martin, J., Martin, T., Bennett, T., and Martin, K. (1982), Surface Mining Equipment, Martin Consultants Inc., Colorado, USA.
-
(1982)
Surface Mining Equipment
-
-
Martin, J.1
Martin, T.2
Bennett, T.3
Martin, K.4
-
14
-
-
0009068346
-
Determining Shovel-Truck Productivity
-
December
-
Morgan, W. and Peterson, L. (1968), Determining Shovel-Truck Productivity, Mining Engineering, 76-80, December.
-
(1968)
Mining Engineering
, pp. 76-80
-
-
Morgan, W.1
Peterson, L.2
-
15
-
-
0035276606
-
Bunching transition in a time-headway model of a bus route
-
036115
-
Nagatani, T. (2001), Bunching transition in a time-headway model of a bus route, Physical Review E, 63(036115), 1-7.
-
(2001)
Physical Review E
, vol.63
, pp. 1-7
-
-
Nagatani, T.1
-
16
-
-
13944277455
-
A hybrid knowledge base system and genetic algorithms for equipment selection
-
Naoum, S. and Haidar, A. (2000), A hybrid knowledge base system and genetic algorithms for equipment selection, Engineering, Construction and Architectural Management, 7(1), 3-14.
-
(2000)
Engineering, Construction and Architectural Management
, vol.7
, Issue.1
, pp. 3-14
-
-
Naoum, S.1
Haidar, A.2
-
19
-
-
0006609394
-
A new earthworks estimating methodology
-
Smith, S., Wood, G. and Gould, M. (2000), A new earthworks estimating methodology, Construction Management and Economics, 18(2), 219-228.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.2
, pp. 219-228
-
-
Smith, S.1
Wood, G.2
Gould, M.3
-
20
-
-
3343004889
-
A hybrid knowledge based/optimization system for automated selection of materials handling system
-
Welgama, P. and Gibson, P. (1995), A hybrid knowledge based/optimization system for automated selection of materials handling system, Computers Industrial Engineering, 28(2), 205-217.
-
(1995)
Computers Industrial Engineering
, vol.28
, Issue.2
, pp. 205-217
-
-
Welgama, P.1
Gibson, P.2
|