메뉴 건너뛰기




Volumn 24, Issue 12, 1997, Pages 1141-1149

A fuzzy linear programming model for production planning in coal mines

Author keywords

[No Author keywords available]

Indexed keywords

COAL MINES; FUZZY SETS; LINEAR PROGRAMMING; MATHEMATICAL MODELS; PROBLEM SOLVING; SCHEDULING; STRATEGIC PLANNING;

EID: 0031357036     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(97)00024-5     Document Type: Article
Times cited : (39)

References (25)
  • 1
    • 0043185143 scopus 로고
    • Sequencing rules for productivity improvements in underground coal mining
    • Bernardo, J. J. and Gillenwater, E., Sequencing rules for productivity improvements in underground coal mining. Decision Sciences, 1991, 22, 3 620-634.
    • (1991) Decision Sciences , vol.22 , Issue.3 , pp. 620-634
    • Bernardo, J.J.1    Gillenwater, E.2
  • 4
    • 23644458344 scopus 로고
    • Open pit long range mine planning using O.R.E. computer methods for the 80s in the mineral industry
    • Sims, D. E., Open pit long range mine planning using O.R.E. computer methods for the 80s in the mineral industry. Society of Mining Engineers of A.I.M.E. Transactions, 1979, 359-370.
    • (1979) Society of Mining Engineers of A.I.M.E. Transactions , pp. 359-370
    • Sims, D.E.1
  • 8
    • 0021615135 scopus 로고
    • Production planning systems at the hanna mining company
    • Preprint No. 84-372
    • Decker, J., Garg, O. and Setele, J. Production planning systems at the hanna mining company. Society of Mining Engineers, Preprint No. 84-372 1984.
    • (1984) Society of Mining Engineers
    • Decker, J.1    Garg, O.2    Setele, J.3
  • 12
    • 0022663475 scopus 로고
    • Generalized multi-period MIP model for production scheduling and processing facilities selection and location
    • Barbaro, R. W. and Ramani, R. V., Generalized multi-period MIP model for production scheduling and processing facilities selection and location. Mining Engineering, 1986, 38, 2 107-114.
    • (1986) Mining Engineering , vol.38 , Issue.2 , pp. 107-114
    • Barbaro, R.W.1    Ramani, R.V.2
  • 13
    • 0001666373 scopus 로고
    • Long range mine sequencing with 0-1 programming
    • Berlin, Germany
    • Kim, Y. C. and Kai, W. L., Long range mine sequencing with 0-1 programming. In Proc. of the 22nd Int. APCOM, Vol. 1. Berlin, Germany, 1990, pp. 131-145.
    • (1990) Proc. of the 22nd Int. APCOM , vol.1 , pp. 131-145
    • Kim, Y.C.1    Kai, W.L.2
  • 14
    • 23644441953 scopus 로고
    • A generalized multiple period mathematical model to solve company-dealer-market production scheduling and inventory problems in a production industry
    • Pendharkar, P. C. and Rodger, J. A., A generalized multiple period mathematical model to solve company-dealer-market production scheduling and inventory problems in a production industry. Proc. of the Mid West Decision Sciences Institute, 1994.
    • (1994) Proc. of the Mid West Decision Sciences Institute
    • Pendharkar, P.C.1    Rodger, J.A.2
  • 15
    • 0020099927 scopus 로고
    • Choice of mine-mill capacities and production schedules using open-ended dynamic programming
    • Lizotte, Y. and Elbrond, J., Choice of mine-mill capacities and production schedules using open-ended dynamic programming. CIM Bulletin, 1982, 75, 839 154-163.
    • (1982) CIM Bulletin , vol.75 , Issue.839 , pp. 154-163
    • Lizotte, Y.1    Elbrond, J.2
  • 18
    • 0020272286 scopus 로고
    • Optimum scheduling of overburden removal in open pit mines
    • Yun, Q. and Yegulalp, T., Optimum scheduling of overburden removal in open pit mines. CIM Bulletin, 1982, 75, 848 80-83.
    • (1982) CIM Bulletin , vol.75 , Issue.848 , pp. 80-83
    • Yun, Q.1    Yegulalp, T.2
  • 21
    • 0027873596 scopus 로고
    • Fuzzy potential solutions in multicriteria and multiconstraint level linear programming problems
    • Shi, Y. and Liu, Y-H., Fuzzy potential solutions in multicriteria and multiconstraint level linear programming problems. Fuzzy Sets and Systems, 1993, 60, 163-179.
    • (1993) Fuzzy Sets and Systems , vol.60 , pp. 163-179
    • Shi, Y.1    Liu, Y.-H.2
  • 22
    • 0011091049 scopus 로고
    • A fuzzy programming approach for solving a multiple criteria and multiple constraint level linear programming problem
    • Liu, Y-H. and Shi, Y., A fuzzy programming approach for solving a multiple criteria and multiple constraint level linear programming problem. Fuzzy Sets and Systems, 1994, 65, 117-124.
    • (1994) Fuzzy Sets and Systems , vol.65 , pp. 117-124
    • Liu, Y.-H.1    Shi, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.