메뉴 건너뛰기




Volumn 21, Issue 1, 2007, Pages 35-49

Modelling open pit dynamics using discrete simulation

Author keywords

Open pit mining; Stochastic simulation; Strategic and tactical mine planning

Indexed keywords

DISCRETE EVENT SIMULATION; GENETIC ALGORITHMS; HEURISTIC METHODS; INDUSTRIAL ECONOMICS; MATLAB; OPERATIONS RESEARCH; OPTIMIZATION; REINFORCEMENT LEARNING; STOCHASTIC MODELS; STRATEGIC PLANNING;

EID: 34547401920     PISSN: 17480930     EISSN: 17480949     Source Type: Journal    
DOI: 10.1080/17480930600720206     Document Type: Article
Times cited : (29)

References (32)
  • 3
    • 0042929889 scopus 로고    scopus 로고
    • An application of branch and cut to open pit mine scheduling
    • Caccetta, L. and Hill, S. P. (2003) An application of branch and cut to open pit mine scheduling. J. Global Optimiz., 27, pp. 349-365.
    • (2003) J. Global Optimiz. , vol.27 , pp. 349-365
    • Caccetta, L.1    Hill, S.P.2
  • 4
    • 0000688427 scopus 로고
    • Optimal blending of mine production using goal programming and interactive graphics system
    • Chanda, E. K. and Dagdelen, K. (1995) Optimal blending of mine production using goal programming and interactive graphics system. Int. J. Surf. Mining, Reclam. Environ., 9, pp. 203-208.
    • (1995) Int. J. Surf. Mining, Reclam. Environ. , vol.9 , pp. 203-208
    • Chanda, E.K.1    Dagdelen, K.2
  • 5
    • 0006896720 scopus 로고
    • An EPD model of open pit short term production scheduling optimization for stratiform orebodies
    • Chanda, E. K. and Wilke, F. L. (1992) An EPD model of open pit short term production scheduling optimization for stratiform orebodies. Proceedings of 23rd APCOM Symposium, SME, pp. 759-768.
    • (1992) Proceedings of 23rd APCOM Symposium, SME , pp. 759-768
    • Chanda, E.K.1    Wilke, F.L.2
  • 6
    • 34547471760 scopus 로고    scopus 로고
    • Optimum multi-period open pit mine production scheduling by Lagrangian parameterization
    • Dagdelen, K. Optimum multi-period open pit mine production scheduling by Lagrangian parameterization
    • Dagdelen, K.1
  • 7
    • 0028121944 scopus 로고
    • Open-pit design and scheduling by use of genetic algorithms
    • Denby, B. and Schofield, D. (1994) Open-pit design and scheduling by use of genetic algorithms. Trans. IMM, 103, pp. A21-A26.
    • (1994) Trans. IMM , vol.103
    • Denby, B.1    Schofield, D.2
  • 10
    • 0016911674 scopus 로고
    • Application of dynamic and stochastic programming to optimize cutoff grades and production rates
    • Dowd, P. A. (1976) Application of dynamic and stochastic programming to optimize cutoff grades and production rates. Trans. IMM, 85, pp. A22-A31.
    • (1976) Trans. IMM , vol.85
    • Dowd, P.A.1
  • 11
    • 0023438263 scopus 로고
    • Dynamic programming applied to grade control in sub-level open stopping
    • Dowd, P. A. and Elvan, L. (1987) Dynamic programming applied to grade control in sub-level open stopping. Trans. IMM, 96, pp. A171-A178.
    • (1987) Trans. IMM , vol.96
    • Dowd, P.A.1    Elvan, L.2
  • 12
    • 0029419666 scopus 로고
    • Open pit mine design and extraction sequencing by use of OR and AI concepts
    • Elveli, B. (1995) Open pit mine design and extraction sequencing by use of OR and AI concepts. Int. J. Surf. Mining, Reclam. Environ., 9, pp. 149-153.
    • (1995) Int. J. Surf. Mining, Reclam. Environ. , vol.9 , pp. 149-153
    • Elveli, B.1
  • 14
    • 2542427578 scopus 로고    scopus 로고
    • Open pit optimization including mineral dressing criteria using 0-1 non-linear goal programming
    • Esfandiari, B., Aryanezhad, M. B. and Abrishamifar, S. A. (2004) Open pit optimization including mineral dressing criteria using 0-1 non-linear goal programming. Trans. IMM, 113, pp. A3-A13.
    • (2004) Trans. IMM , vol.113
    • Esfandiari, B.1    Aryanezhad, M.B.2    Abrishamifar, S.A.3
  • 16
    • 0346972151 scopus 로고    scopus 로고
    • Numerical simulation of surface mine production system using pit shell simulator
    • Frimpong, S., Asa, E. and Suglo, R. S. (2001) Numerical simulation of surface mine production system using pit shell simulator. Miner. Res. Eng., 10, pp. 185-203.
    • (2001) Miner. Res. Eng. , vol.10 , pp. 185-203
    • Frimpong, S.1    Asa, E.2    Suglo, R.S.3
  • 17
    • 0032418511 scopus 로고    scopus 로고
    • MULSOPS: Multivariate optimized pit shells simulator for tactical mine planning
    • Frimpong, S., Asa, E. and Szymanski, J. (1998) MULSOPS: Multivariate optimized pit shells simulator for tactical mine planning. Int. J. Surf. Mining, Reclam. Environ., 12, pp. 163-169.
    • (1998) Int. J. Surf. Mining, Reclam. Environ. , vol.12 , pp. 163-169
    • Frimpong, S.1    Asa, E.2    Szymanski, J.3
  • 19
    • 0020735786 scopus 로고
    • Mine scheduling optimization with mixed integer programming
    • Gershon, M. (1983) Mine scheduling optimization with mixed integer programming. Mining Eng., 35, pp. 351-354.
    • (1983) Mining Eng. , vol.35 , pp. 351-354
    • Gershon, M.1
  • 26
    • 0027599370 scopus 로고
    • Open pit optimization - Part 2: Production scheduling and inclusion of roadways
    • Onur, A. H. and Dowd, P. A. (1993) Open pit optimization - part 2: production scheduling and inclusion of roadways. Trans. IMM, 102, pp. A105-A113.
    • (1993) Trans. IMM , vol.102
    • Onur, A.H.1    Dowd, P.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.