-
1
-
-
84866010859
-
Optimum open pit production sequencing - The current state of the art
-
Littleton: Society of Mining, Metallurgy and Exploitation: Preprint N-94-224
-
Kim, Y.C. & Zhao, Y. 1994. Optimum open pit production sequencing - the current state of the art. Proc. SME Annual Meeting. Littleton: Society of Mining, Metallurgy and Exploitation: Preprint N-94-224.
-
(1994)
Proc. SME Annual Meeting
-
-
Kim, Y.C.1
Zhao, Y.2
-
2
-
-
84856850026
-
The time aspect of the optimum long-term open pit production sequencing
-
Littleton: Society of Mining, Metallurgy and Exploitation
-
Halatchev, R. 2002. The time aspect of the optimum long-term open pit production sequencing. Proc. 30th APCOM. Littleton: Society of Mining, Metallurgy and Exploitation: 133-146.
-
(2002)
Proc. 30th APCOM
, pp. 133-146
-
-
Halatchev, R.1
-
3
-
-
0031121356
-
Option pricing: A new approach to valuing mining projects
-
Armstrong, M. & Galli, A. 1997. Option pricing: a new approachtovaluing miningprojects. CIM Bulletin, Vol.90, No.1009: 37-44. (Pubitemid 127535034)
-
(1997)
CIM Bulletin
, vol.90
, Issue.1009
, pp. 37-44
-
-
Armstrong, M.1
Galli, A.2
-
6
-
-
84856892433
-
Factor of compromise in the assessment of open pit long-term production plans
-
Johannesburg: The South African Institute of Mining and Metallurgy
-
Halatchev, R. 1996. Factor of compromise in the assessment of open pit long-term production plans. Proc. Surface Mining'96 Conference. Johannesburg: The South African Institute of Mining and Metallurgy: 31-35.
-
(1996)
Proc. Surface Mining'96 Conference
, pp. 31-35
-
-
Halatchev, R.1
-
7
-
-
84856819292
-
Company strategy - A basis for production scheduling of an open pit complex
-
Halatchev, R. 1999. Company strategy - a basis for production scheduling of an open pit complex. Proc. Strategic Mine Planning Conference: 81-96.
-
(1999)
Proc. Strategic Mine Planning Conference
, pp. 81-96
-
-
Halatchev, R.1
-
8
-
-
84856820187
-
The mining aspect of the optimum productionrate of open pit mines
-
in press (Section A: Mining industry)
-
Halatchev, R. in press. The mining aspect of the optimum productionrate of open pit mines. Trans. Instn Min. Metall. (Section A: Mining industry).
-
Trans. Instn Min. Metall.
-
-
Halatchev, R.1
-
9
-
-
84856840210
-
Open pit production scheduling: Pseudo-economic discretization versus technological discretization
-
Littleton; Society of Mining, Metallurgy and Exploitation: Preprint 03-052
-
Halatchev, R. 2003. Open pit production scheduling: pseudo-economic discretization versus technological discretization. Proc. SME Annual Meeting, Littleton; Society of Mining, Metallurgy and Exploitation: Preprint 03-052.
-
(2003)
Proc. SME Annual Meeting
-
-
Halatchev, R.1
-
10
-
-
0030081623
-
Optimum scheduling of waste and ore production
-
Halatchev, R. & Moustakerov, I. 1996. Optimum scheduling of waste and ore production. Mining Technology Journal, Vol. 78, No. 894: 61-64.
-
(1996)
Mining Technology Journal
, vol.78
, Issue.894
, pp. 61-64
-
-
Halatchev, R.1
Moustakerov, I.2
-
11
-
-
84856854891
-
Coal production scheduling optimization of single seam open-cast mining
-
Melbourne: The Australasian Institute of Mining and Metallurgy
-
Halatchev, R. & Kozan, E. 2003. Coal production scheduling optimization of single seam open-cast mining. Proc. 5th Large Open Pit Conference. Melbourne: The Australasian Institute of Mining and Metallurgy: 99-109.
-
(2003)
Proc. 5th Large Open Pit Conference
, pp. 99-109
-
-
Halatchev, R.1
Kozan, E.2
-
12
-
-
2942520991
-
The optimum production equipment scale for open pit coal mining
-
Littleton: Society of Mining, Metallurgy and Exploitation: Preprint 04-128
-
Halatchev, R. & Lever P. 2004. The optimum production equipment scale for open pit coal mining. Proc. SME Annual Meeting. Littleton: Society of Mining, Metallurgy and Exploitation: Preprint 04-128.
-
(2004)
Proc. SME Annual Meeting
-
-
Halatchev, R.1
Lever, P.2
-
13
-
-
84856876890
-
-
AusIMM. 1988. VALMIN Code: www.ausimm.com.au/codes.
-
(1988)
VALMIN Code
-
-
|