메뉴 건너뛰기




Volumn , Issue , 2005, Pages 315-323

A model of discounted profit variation of open pit production sequencing optimization

Author keywords

[No Author keywords available]

Indexed keywords

C++ (PROGRAMMING LANGUAGE); COMPUTER SOFTWARE; METAL RECOVERY; MINERALS; MULTITASKING; OPEN PIT MINING; OPERATIONS RESEARCH; PRODUCTION CONTROL; PROFITABILITY; SCHEDULING;

EID: 34547437028     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1201/9781439833407.ch41     Document Type: Conference Paper
Times cited : (12)

References (15)
  • 1
    • 84866010859 scopus 로고
    • Optimum open pit production sequencing - The current state of the art
    • Littleton: Society of Mining, Metallurgy and Exploitation: Preprint N-94-224
    • Kim, Y.C. & Zhao, Y. 1994. Optimum open pit production sequencing - the current state of the art. Proc. SME Annual Meeting. Littleton: Society of Mining, Metallurgy and Exploitation: Preprint N-94-224.
    • (1994) Proc. SME Annual Meeting
    • Kim, Y.C.1    Zhao, Y.2
  • 2
    • 84856850026 scopus 로고    scopus 로고
    • The time aspect of the optimum long-term open pit production sequencing
    • Littleton: Society of Mining, Metallurgy and Exploitation
    • Halatchev, R. 2002. The time aspect of the optimum long-term open pit production sequencing. Proc. 30th APCOM. Littleton: Society of Mining, Metallurgy and Exploitation: 133-146.
    • (2002) Proc. 30th APCOM , pp. 133-146
    • Halatchev, R.1
  • 3
    • 0031121356 scopus 로고    scopus 로고
    • Option pricing: A new approach to valuing mining projects
    • Armstrong, M. & Galli, A. 1997. Option pricing: a new approachtovaluing miningprojects. CIM Bulletin, Vol.90, No.1009: 37-44. (Pubitemid 127535034)
    • (1997) CIM Bulletin , vol.90 , Issue.1009 , pp. 37-44
    • Armstrong, M.1    Galli, A.2
  • 6
    • 84856892433 scopus 로고    scopus 로고
    • Factor of compromise in the assessment of open pit long-term production plans
    • Johannesburg: The South African Institute of Mining and Metallurgy
    • Halatchev, R. 1996. Factor of compromise in the assessment of open pit long-term production plans. Proc. Surface Mining'96 Conference. Johannesburg: The South African Institute of Mining and Metallurgy: 31-35.
    • (1996) Proc. Surface Mining'96 Conference , pp. 31-35
    • Halatchev, R.1
  • 7
    • 84856819292 scopus 로고    scopus 로고
    • Company strategy - A basis for production scheduling of an open pit complex
    • Halatchev, R. 1999. Company strategy - a basis for production scheduling of an open pit complex. Proc. Strategic Mine Planning Conference: 81-96.
    • (1999) Proc. Strategic Mine Planning Conference , pp. 81-96
    • Halatchev, R.1
  • 8
    • 84856820187 scopus 로고    scopus 로고
    • The mining aspect of the optimum productionrate of open pit mines
    • in press (Section A: Mining industry)
    • Halatchev, R. in press. The mining aspect of the optimum productionrate of open pit mines. Trans. Instn Min. Metall. (Section A: Mining industry).
    • Trans. Instn Min. Metall.
    • Halatchev, R.1
  • 9
    • 84856840210 scopus 로고    scopus 로고
    • Open pit production scheduling: Pseudo-economic discretization versus technological discretization
    • Littleton; Society of Mining, Metallurgy and Exploitation: Preprint 03-052
    • Halatchev, R. 2003. Open pit production scheduling: pseudo-economic discretization versus technological discretization. Proc. SME Annual Meeting, Littleton; Society of Mining, Metallurgy and Exploitation: Preprint 03-052.
    • (2003) Proc. SME Annual Meeting
    • Halatchev, R.1
  • 10
    • 0030081623 scopus 로고    scopus 로고
    • Optimum scheduling of waste and ore production
    • Halatchev, R. & Moustakerov, I. 1996. Optimum scheduling of waste and ore production. Mining Technology Journal, Vol. 78, No. 894: 61-64.
    • (1996) Mining Technology Journal , vol.78 , Issue.894 , pp. 61-64
    • Halatchev, R.1    Moustakerov, I.2
  • 11
    • 84856854891 scopus 로고    scopus 로고
    • Coal production scheduling optimization of single seam open-cast mining
    • Melbourne: The Australasian Institute of Mining and Metallurgy
    • Halatchev, R. & Kozan, E. 2003. Coal production scheduling optimization of single seam open-cast mining. Proc. 5th Large Open Pit Conference. Melbourne: The Australasian Institute of Mining and Metallurgy: 99-109.
    • (2003) Proc. 5th Large Open Pit Conference , pp. 99-109
    • Halatchev, R.1    Kozan, E.2
  • 12
    • 2942520991 scopus 로고    scopus 로고
    • The optimum production equipment scale for open pit coal mining
    • Littleton: Society of Mining, Metallurgy and Exploitation: Preprint 04-128
    • Halatchev, R. & Lever P. 2004. The optimum production equipment scale for open pit coal mining. Proc. SME Annual Meeting. Littleton: Society of Mining, Metallurgy and Exploitation: Preprint 04-128.
    • (2004) Proc. SME Annual Meeting
    • Halatchev, R.1    Lever, P.2
  • 13
    • 84856876890 scopus 로고
    • AusIMM. 1988. VALMIN Code: www.ausimm.com.au/codes.
    • (1988) VALMIN Code


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.