메뉴 건너뛰기




Volumn 34, Issue 2, 2004, Pages 124-134

Implementing a production schedule at LKAB's Kiruna Mine

Author keywords

Production and scheduling: applications

Indexed keywords


EID: 2442504659     PISSN: 00922102     EISSN: None     Source Type: Journal    
DOI: 10.1287/inte.1030.0059     Document Type: Review
Times cited : (62)

References (25)
  • 2
    • 2442470718 scopus 로고    scopus 로고
    • Version 10.6.16, Bell Laboratories, Murray Hill, New Jersey
    • AMPL Optimization LLC. 2001. Version 10.6.16, Bell Laboratories, Murray Hill, New Jersey.
    • (2001) AMPL Optimization LLC
  • 3
    • 2442580021 scopus 로고    scopus 로고
    • http://sg01.atlascopco.com/SGSite/Default.asp?cookie%5Ftest=1
    • Atlas Copco. 2001. Atlas Copco Rock Drills AB. www.atlascopco.com. Retrieved April 25, 2002 http://sg01.atlascopco.com/SGSite/Default.asp?cookie%5Ftest=1.
    • (2001) Atlas Copco Rock Drills AB
  • 4
    • 0039192902 scopus 로고    scopus 로고
    • Underground planning at Stillwater Mining Company
    • Carlyle, M., B. C. Eaves. 2001. Underground planning at Stillwater Mining Company. Interfaces 31(4) 50-60.
    • (2001) Interfaces , vol.31 , Issue.4 , pp. 50-60
    • Carlyle, M.1    Eaves, B.C.2
  • 5
    • 2442525326 scopus 로고    scopus 로고
    • Linear programming model applied to scheduling of iron ore production at the Kiruna Mine, Kiruna, Sweden
    • Dagdelen, K., M. Kuchta, E. Topal. 2002. Linear programming model applied to scheduling of iron ore production at the Kiruna Mine, Kiruna, Sweden. Trans. Soc. Mining, Metallurgy, Exploration, Inc. 312 194-198.
    • (2002) Trans. Soc. Mining, Metallurgy, Exploration, Inc. , vol.312 , pp. 194-198
    • Dagdelen, K.1    Kuchta, M.2    Topal, E.3
  • 8
    • 0038393634 scopus 로고
    • Optimal production planning in underground coal mines through goal programming - A case study from an Indian mine
    • Montreal, Quebec, Canada
    • Jawed, M. 1993. Optimal production planning in underground coal mines through goal programming - A case study from an Indian mine. 24th Internat. Appl. Comput. Oper. Res. in Mineral Indust. (APCOM) Sympos. Proc., Montreal, Quebec, Canada, 43-50.
    • (1993) 24th Internat. Appl. Comput. Oper. Res. in Mineral Indust. (APCOM) Sympos. Proc. , pp. 43-50
    • Jawed, M.1
  • 13
    • 2442579742 scopus 로고    scopus 로고
    • Loussavaara-Kiirunavaara Aktiebolag, Kiruna, Sweden
    • LKAB. 2001. Internal promotional material. Loussavaara-Kiirunavaara Aktiebolag, Kiruna, Sweden.
    • (2001) Internal Promotional Material
  • 14
    • 2442466589 scopus 로고    scopus 로고
    • Eliminating variables and using aggregation to improve the performance of an integer programming production scheduling model for an underground mine
    • Colorado School of Mines, Golden, CO
    • Newman, A., M. Kuchta. 2003. Eliminating variables and using aggregation to improve the performance of an integer programming production scheduling model for an underground mine. Working paper, Colorado School of Mines, Golden, CO.
    • (2003) Working Paper
    • Newman, A.1    Kuchta, M.2
  • 15
    • 0032443047 scopus 로고    scopus 로고
    • Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX
    • Smith, M. L. 1998. Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX. Internat. J. Surface Mining 12(4) 149-155.
    • (1998) Internat. J. Surface Mining , vol.12 , Issue.4 , pp. 149-155
    • Smith, M.L.1
  • 20
    • 0032072202 scopus 로고    scopus 로고
    • A mathematical programming viewpoint for solving the ultimate pit problem
    • Underwood, R., B. Tolwinski. 1998. A mathematical programming viewpoint for solving the ultimate pit problem. Eur. J. Oper. Res. 107(1) 96-107.
    • (1998) Eur. J. Oper. Res. , vol.107 , Issue.1 , pp. 96-107
    • Underwood, R.1    Tolwinski, B.2
  • 23
    • 0038055258 scopus 로고    scopus 로고
    • Using MILP to optimize period fix costs in complex mine sequencing and scheduling problems
    • Pennsylvania State University, University Park, PA
    • Winkler, B. M. 1996. Using MILP to optimize period fix costs in complex mine sequencing and scheduling problems. 26th Internat. Appl. Comput. Oper. Res. in Mineral Indust. (APCOM) Sympos. Proc., Pennsylvania State University, University Park, PA, 441-446.
    • (1996) 26th Internat. Appl. Comput. Oper. Res. in Mineral Indust. (APCOM) Sympos. Proc. , pp. 441-446
    • Winkler, B.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.