메뉴 건너뛰기




Volumn 9, Issue 3, 2010, Pages 223-233

Producer's replenishment policy for an EPQ model with rework and machine failure taking place in backorder reloading time

Author keywords

Backorder; Breakdown; Inventory; Lot size; Optimization; Production run time; Rework

Indexed keywords

BACKORDERS; COST ANALYSIS; CYCLE LENGTH; ECONOMIC PRODUCTION QUANTITY; EPQ MODELS; IMPERFECT QUALITY; IMPERFECT SYSTEMS; INVENTORY COSTS; LONG-RUN AVERAGE COST; LOT SIZE; LOT SIZING PROBLEMS; MACHINE BREAKDOWN; MACHINE FAILURE; MATHEMATICAL MODELING; MEAN TIME BETWEEN FAILURES; NUMERICAL EXAMPLE; OPTIMAL MANUFACTURING; OPTIMAL PRODUCTION; OVERALL COSTS; PRODUCTION RUN TIME; PRODUCTION SYSTEM; RELIABILITY FACTOR; RENEWAL REWARD THEOREM; REPLENISHMENT POLICY;

EID: 77950237103     PISSN: 11092769     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (36)
  • 5
    • 34247366300 scopus 로고    scopus 로고
    • Optimization problem for EMQ model with backlog level constraint
    • S. W. Chiu, Optimization problem for EMQ model with backlog level constraint. WSEAS Transactions on Information Science & Applications, Vol. 4 (4), 2007, pp. 687-692.
    • (2007) WSEAS Transactions on Information Science & Applications , vol.4 , Issue.4 , pp. 687-692
    • Chiu, S.W.1
  • 6
    • 34247342509 scopus 로고    scopus 로고
    • A comprehensible revision of silver-meal heuristic for practitioners learning lot-size problem
    • S. W. Chiu, A comprehensible revision of Silver-Meal heuristic for practitioners learning lot-size problem. WSEAS Transactions on Systems, Vol. 6 (4), 2007, pp. 706-710
    • (2007) WSEAS Transactions on Systems , vol.6 , Issue.4 , pp. 706-710
    • Chiu, S.W.1
  • 8
    • 48849109713 scopus 로고    scopus 로고
    • Manufacturing lot sizing with backordering, scrap, and random breakdown occurring in inventory-stacking period
    • S. W. Chiu, J.-C. Yang, S.-Y. C. Kuo, Manufacturing lot sizing with backordering, scrap, and random breakdown occurring in inventory-stacking period. WSEAS Trans. on Mathematics, Vol. 7 (4), 2008, pp. 183-194.
    • (2008) WSEAS Trans. on Mathematics , vol.7 , Issue.4 , pp. 183-194
    • Chiu, S.W.1    Yang, J.-C.2    Kuo, C.S.-Y.3
  • 9
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes. IIE Transactions, Vol. 18, 1986, pp. 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 10
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • H. L. Lee and M. J. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, Vol. 33, 1987, pp. 1125-1136.
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 11
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable production facility
    • T. Bielecki and P. R. Kumar, Optimality of zero-inventory policies for unreliable production facility, Operations Research, Vol. 36, 1988, pp. 532-541.
    • (1988) Operations Research , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 12
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transactions, Vol. 22, 1990, pp. 41-47.
    • (1990) IIE Transactions , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2
  • 13
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T. C. E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction, Vol. 23, 1991, pp. 23-28.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 14
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • T. Boone, R. Ganeshan, Y. Guo and J. K. Ord, The impact of imperfect processes on production run times. Decision Sciences, Vol. 31 (4), 2000, pp. 773-785.
    • (2000) Decision Sciences , vol.31 , Issue.4 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 15
    • 0032683886 scopus 로고    scopus 로고
    • Optimal preventive maintenance in a production inventory system
    • T. K. Das and S. Sarkar, Optimal preventive maintenance in a production inventory system. IIE Transactions, Vol. 31, 1999, pp. 537-551.
    • (1999) IIE Transactions , vol.31 , pp. 537-551
    • Das, T.K.1    Sarkar, S.2
  • 16
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • K. L. Cheung and W. H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Research Logistics, Vol. 44 (3), 1997, pp. 257-272.
    • (1997) Naval Research Logistics , vol.44 , Issue.3 , pp. 257-272
    • Cheung, K.L.1    Hausman, W.H.2
  • 17
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P. A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, Vol. 12, 2001, pp. 584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 18
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • A. M. M. Jamal, B. R. Sarker and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering, Vol. 47, 2004, pp. 77-89.
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 19
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • S. W. Chiu and Y.-S. P. Chiu, Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific & Industrial Research, Vol. 65 (6), 2006, pp. 499-506.
    • (2006) Journal of Scientific & Industrial Research , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, P.Y.-S.2
  • 20
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y.-S. P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, Vol. 35 (4), 2003, pp. 427-437.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, P.Y.-S.1
  • 21
    • 36849095468 scopus 로고    scopus 로고
    • Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model
    • S. W. Chiu, Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model, P I Mech Eng Part B: Journal of Engineering Manufacture, Vol. 221 (7), 2007, pp. 1235-1243.
    • (2007) P I Mech. Eng. Part B: Journal of Engineering Manufacture , vol.221 , Issue.7 , pp. 1235-1243
    • Chiu, S.W.1
  • 22
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality emq model with rework and backlogging
    • S. W. Chiu, Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging, Applied Stochastic Models in Business and Industry, Vol. 23 (2), 2007, pp. 165-178.
    • (2007) Applied Stochastic Models in Business and Industry , vol.23 , Issue.2 , pp. 165-178
    • Chiu, S.W.1
  • 23
    • 38349058125 scopus 로고    scopus 로고
    • Production lot size problem with failure in repair and backlogging derived without derivatives
    • S. W. Chiu, Production lot size problem with failure in repair and backlogging derived without derivatives, European Journal of Operational Research, Vol. 188 (2), 2008, pp. 610-615
    • (2008) European Journal of Operational Research , vol.188 , Issue.2 , pp. 610-615
    • Chiu, S.W.1
  • 24
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • H. Groenevelt, L. Pintelon and A. Seidmann, Production lot sizing with machine breakdowns. Management Science, Vol. 38, 1992, pp. 104-123.
    • (1992) Management Science , vol.38 , pp. 104-123
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 25
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • B. C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system. Journal of the Operational Research Society, Vol. 56 (5), 2005, pp. 563-575.
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.5 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 26
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • S. W. Chiu, S. L. Wang and Y.-S. P. Chiu, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, Vol. 180, 2007, pp. 664-676.
    • (2007) European Journal of Operational Research , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, P.Y.-S.3
  • 27
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns. European Journal of Operational Research, Vol. 100, 1997, pp. 514-536.
    • (1997) European Journal of Operational Research , vol.100 , pp. 514-536
    • Kuhn, H.1
  • 28
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inspections and random machine failures
    • V. Makis and J. Fung, An EMQ model with inspections and random machine failures. Journal of Operational Research Society, Vol. 49, 1998, pp. 66-76.
    • (1998) Journal of Operational Research Society , vol.49 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 29
    • 48849096362 scopus 로고    scopus 로고
    • Production run time problem with machine breakdowns under AR control policy and rework
    • S. W. Chiu, Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific & Industrial Research, Vol. 66 (12), 2007, pp. 979-988.
    • (2007) Journal of Scientific & Industrial Research , vol.66 , Issue.12 , pp. 979-988
    • Chiu, S.W.1
  • 30
    • 68849112586 scopus 로고    scopus 로고
    • Optimal replenishment policy for manufacturing systems with failure in rework, backlogging, and random breakdown
    • S. W. Chiu, K.-K. Chen and J.-C. Yang, Optimal replenishment policy for manufacturing systems with failure in rework, backlogging, and random breakdown. Mathematical and Computer Modelling of Dynamical Systems, Vol. 15 (3), 2009, pp. 255-274.
    • (2009) Mathematical and Computer Modelling of Dynamical Systems , vol.15 , Issue.3 , pp. 255-274
    • Chiu, S.W.1    Chen, K.-K.2    Yang, J.-C.3
  • 31
    • 68649107898 scopus 로고    scopus 로고
    • Incorporating multi-delivery policy and quality assurance into economic production lot size problem
    • Y.-S. P. Chiu, S. W. Chiu, C.-Y. Li and C.-K. Ting, Incorporating multi-delivery policy and quality assurance into economic production lot size problem. Journal of Scientific & Industrial Research, Vol. 68 (6), 2009, pp. 505-512.
    • (2009) Journal of Scientific & Industrial Research , vol.68 , Issue.6 , pp. 505-512
    • Chiu, P.Y.-S.1    Chiu, S.W.2    Li, C.-Y.3    Ting, C.-K.4
  • 32
    • 62349085901 scopus 로고    scopus 로고
    • Mathematical method for expediting scrap-orrework decision making in EPQ model with failure in repair
    • S. W. Chiu, K.-K. Chen and H.-H. Chang, Mathematical method for expediting scrap-orrework decision making in EPQ model with failure in repair", Mathematical and Computational Applications, Vol. 13 (3), 2008, pp. 137-145.
    • (2008) Mathematical and Computational Applications , vol.13 , Issue.3 , pp. 137-145
    • Chiu, S.W.1    Chen, K.-K.2    Chang, H.-H.3
  • 33
    • 67649826546 scopus 로고    scopus 로고
    • Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy
    • Y.-S. P. Chiu, C.-Y. Tseng, W.-C. Liu and C.-K. Ting, Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy, P I Mech E Part B: Journal of Engineering Manufacture, Vol. 223 (2), 2009, pp. 183-194.
    • (2009) P I Mech. E Part B: Journal of Engineering Manufacture , vol.223 , Issue.2 , pp. 183-194
    • Chiu, P.Y.-S.1    Tseng, C.-Y.2    Liu, W.-C.3    Ting, C.-K.4
  • 35
    • 54949157109 scopus 로고    scopus 로고
    • A note on optimal replenishment policy for imperfect quality emq model with rework and backlogging
    • H.-D. Lin, Y.-S. P. Chiu, C.-K. Ting, A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Computers and Mathematics with Applications, Vol. 56 (11), 2008, pp. 2819-2824.
    • (2008) Computers and Mathematics with Applications , vol.56 , Issue.11 , pp. 2819-2824
    • Lin, H.-D.1    Chiu, P.Y.-S.2    Ting, C.-K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.