메뉴 건너뛰기




Volumn 23, Issue 2, 2007, Pages 165-178

Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging

Author keywords

Economic manufacturing quantity model; Lot size; Random defective rate; Replenishment policy; Rework; Scrap

Indexed keywords

MATHEMATICAL MODELS; NUMERICAL METHODS; OPTIMAL CONTROL SYSTEMS; PUBLIC POLICY; QUALITY CONTROL;

EID: 34247872840     PISSN: 15241904     EISSN: 15264025     Source Type: Journal    
DOI: 10.1002/asmb.664     Document Type: Article
Times cited : (49)

References (24)
  • 9
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt MJ, Lee HL. Economic production cycles with imperfect production processes. IIE Transaction 1986; 18:48-55.
    • (1986) IIE Transaction , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 10
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee HL, Rosenblatt MJ. Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences 1987; 33:1125-1136.
    • (1987) Management Sciences , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 12
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • Zhang X, Gerchak Y. Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transaction 1990; 22:41-47.
    • (1990) IIE Transaction , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2
  • 13
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • Cheng TCE. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction 1991; 23:23-28.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 14
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdown
    • Chung KJ. Bounds for production lot sizing with machine breakdown. Computers and Industrial Engineering 1997; 32:139-144.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 16
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • Ben-Daya M. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics 2002; 76:257-264.
    • (2002) International Journal of Production Economics , vol.76 , pp. 257-264
    • Ben-Daya, M.1
  • 17
    • 33646804512 scopus 로고    scopus 로고
    • Numerical method for determination of reworking or scraping the defective items in a finite production rate model
    • Chiu Y-SP, Chiu SW, Chao H-C. Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Communications in Numerical Methods in Engineering 2006; 22:377-386.
    • (2006) Communications in Numerical Methods in Engineering , vol.22 , pp. 377-386
    • Chiu, Y.-S.P.1    Chiu, S.W.2    Chao, H.-C.3
  • 18
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modelling for production system with backlogging and failure in repair
    • Chiu SW, Chiu Y-SP. Mathematical modelling for production system with backlogging and failure in repair. Journal of Scientific and Industrial Research 2006; 65:499-506.
    • (2006) Journal of Scientific and Industrial Research , vol.65 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 19
    • 33644993420 scopus 로고    scopus 로고
    • Optimal production and maintenance policy for imperfect production systems
    • Wang, C-H. Optimal production and maintenance policy for imperfect production systems. Naval Research Logistics 2006; 53(2):151-156.
    • (2006) Naval Research Logistics , vol.53 , Issue.2 , pp. 151-156
    • Wang, C.-H.1
  • 20
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • Liu JJ, Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 1996; 91:517-527.
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 21
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek PA, Salameh MK. Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control 2001; 12:584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 22
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Chiu YP. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engineering Optimization 2003; 35:427-437.
    • (2003) Engineering Optimization , vol.35 , pp. 427-437
    • Chiu, Y.P.1
  • 23
    • 8744223416 scopus 로고    scopus 로고
    • Effects of random defective rate and imperfect rework process on economic production quantity model
    • Chiu SW, Gong D-C, Wee H-M. Effects of random defective rate and imperfect rework process on economic production quantity model. Japan Journal of Industrial and Applied Mathematics 2004; 21:375-389.
    • (2004) Japan Journal of Industrial and Applied Mathematics , vol.21 , pp. 375-389
    • Chiu, S.W.1    Gong, D.-C.2    Wee, H.-M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.