-
9
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt MJ, Lee HL. Economic production cycles with imperfect production processes. IIE Transaction 1986; 18:48-55.
-
(1986)
IIE Transaction
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
10
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee HL, Rosenblatt MJ. Simultaneous determination of production cycle and inspection schedules in a production system. Management Sciences 1987; 33:1125-1136.
-
(1987)
Management Sciences
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
12
-
-
0025399639
-
Joint lot sizing and inspection policy in an EOQ model with random yield
-
Zhang X, Gerchak Y. Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transaction 1990; 22:41-47.
-
(1990)
IIE Transaction
, vol.22
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
-
13
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
Cheng TCE. An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction 1991; 23:23-28.
-
(1991)
IIE Transaction
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
14
-
-
0030835106
-
Bounds for production lot sizing with machine breakdown
-
Chung KJ. Bounds for production lot sizing with machine breakdown. Computers and Industrial Engineering 1997; 32:139-144.
-
(1997)
Computers and Industrial Engineering
, vol.32
, pp. 139-144
-
-
Chung, K.J.1
-
16
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
Ben-Daya M. The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics 2002; 76:257-264.
-
(2002)
International Journal of Production Economics
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
17
-
-
33646804512
-
Numerical method for determination of reworking or scraping the defective items in a finite production rate model
-
Chiu Y-SP, Chiu SW, Chao H-C. Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Communications in Numerical Methods in Engineering 2006; 22:377-386.
-
(2006)
Communications in Numerical Methods in Engineering
, vol.22
, pp. 377-386
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Chao, H.-C.3
-
18
-
-
33745339066
-
Mathematical modelling for production system with backlogging and failure in repair
-
Chiu SW, Chiu Y-SP. Mathematical modelling for production system with backlogging and failure in repair. Journal of Scientific and Industrial Research 2006; 65:499-506.
-
(2006)
Journal of Scientific and Industrial Research
, vol.65
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
19
-
-
33644993420
-
Optimal production and maintenance policy for imperfect production systems
-
Wang, C-H. Optimal production and maintenance policy for imperfect production systems. Naval Research Logistics 2006; 53(2):151-156.
-
(2006)
Naval Research Logistics
, vol.53
, Issue.2
, pp. 151-156
-
-
Wang, C.-H.1
-
20
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu JJ, Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 1996; 91:517-527.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
21
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
Hayek PA, Salameh MK. Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control 2001; 12:584-590.
-
(2001)
Production Planning and Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
22
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Chiu YP. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engineering Optimization 2003; 35:427-437.
-
(2003)
Engineering Optimization
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
23
-
-
8744223416
-
Effects of random defective rate and imperfect rework process on economic production quantity model
-
Chiu SW, Gong D-C, Wee H-M. Effects of random defective rate and imperfect rework process on economic production quantity model. Japan Journal of Industrial and Applied Mathematics 2004; 21:375-389.
-
(2004)
Japan Journal of Industrial and Applied Mathematics
, vol.21
, pp. 375-389
-
-
Chiu, S.W.1
Gong, D.-C.2
Wee, H.-M.3
|