-
1
-
-
0000356787
-
How many parts to make at once
-
Harris F W, How many parts to make at once, Factory, Mag Manage, 10 (1913) 135-136;
-
(1913)
Factory, Mag Manage
, vol.10
, pp. 135-136
-
-
Harris, F.W.1
-
2
-
-
0011641845
-
-
reprinted
-
reprinted Operat Res, 38 (1990) 947-950.
-
Operat Res
, vol.38
, Issue.1990
, pp. 947-950
-
-
-
3
-
-
0003398158
-
-
John Wiley and Sons, Inc., New York
-
Silver E A, Pyke D F & Peterson R, Inventory Management and Production Planning and Scheduling (John Wiley & Sons, Inc., New York) 1998, 151-172.
-
(1998)
Inventory Management and Production Planning and Scheduling
, pp. 151-172
-
-
Silver, E.A.1
Pyke, D.F.2
Peterson, R.3
-
6
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt M J & Lee H L, Economic production cycles with imperfect production processes, HE Trans, 18 (1986) 48-55.
-
(1986)
HE Trans
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
7
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee H L & Rosenblatt M J, Simultaneous determination of production cycle and inspection schedules in a production system, Manage Sci, 33 (1987) 1125-1136.
-
(1987)
Manage Sci
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
8
-
-
0026116409
-
An economic order quantity model with demand- dependent unit production cost and imperfect production processes
-
Cheng T C E, An economic order quantity model with demand- dependent unit production cost and imperfect production processes, HE Trans, 23 (1991) 23-28.
-
(1991)
HE Trans
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
10
-
-
0031273569
-
Analysis of a production/inventory system subject to random disruptions
-
Moinzadeh K & Aggarwal P, Analysis of a production/inventory system subject to random disruptions, Manage Sci, 43 (1997) 1577-1588. (Pubitemid 127606213)
-
(1997)
Management Science
, vol.43
, Issue.11
, pp. 1577-1588
-
-
Moinzadeh, K.1
Aggarwal, P.2
-
11
-
-
23144434063
-
A dynamic lot sizing model with exponential machine breakdowns
-
PII S0377221796001361
-
Kuhn H, A dynamic lot sizing model with exponential machine breakdowns, Eur J Operat Res, 100 (1997) 514-536. (Pubitemid 127392374)
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.3
, pp. 514-536
-
-
Kuhn, H.1
-
12
-
-
0031232875
-
An extended optimal lot sizing model with an unreliable machine
-
Kim C H, Hong Y & Kim S-Y, An extended optimal lot sizing model with an unreliable machine, Prod Plan Cont, 8 (1997) 577-585. (Pubitemid 127649061)
-
(1997)
Production Planning and Control
, vol.8
, Issue.6
, pp. 577-585
-
-
Kim, C.H.1
Hong, Y.2
Kim, S.-Y.3
-
13
-
-
0035577718
-
Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
-
Rahim M A & Ben-Daya M, Joint determination of production quantity, inspection schedule and quality control for imperfect process with deteriorating products, J Operat Res Soc, 52 (2001) 1370-1378. (Pubitemid 33128273)
-
(2001)
Journal of the Operational Research Society
, vol.52
, Issue.12
, pp. 1370-1378
-
-
Rahim, M.A.1
Ben-Daya, M.2
-
14
-
-
33748703640
-
Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
-
Chiu S W, Chiu Y-S P & Shih C, Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing-method, J Sci Ind Res, 65 (2006)695-701. (Pubitemid 44390410)
-
(2006)
Journal of Scientific and Industrial Research
, vol.65
, Issue.9
, pp. 695-701
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
Shih, C.-C.3
-
15
-
-
34250899311
-
A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram
-
Chiu S W, Shih C & Chiu Y-S P, A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram, P I Mech Eng Part B: J Engg Manuf, 221 (2007) 489-497.
-
(2007)
P i Mech Eng Part B: J Engg Manuf
, vol.221
, pp. 489-497
-
-
Chiu, S.W.1
Shih, C.2
Chiu, Y.-S.P.3
-
16
-
-
0032299489
-
Minimal repair policies for an economic manufacturing process
-
Dohi T, Kaio N & Osaki S, Minimal repair policies for an economic manufacturing process, J Qual Maintenance Engg, 4 (1998) 248-262.
-
(1998)
J Qual Maintenance Engg
, vol.4
, pp. 248-262
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
17
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
Hayek P A & Salameh M K, Production lot sizing with the reworking of imperfect quality items produced, Prod Plan Cont, 12 (2001) 584-590.
-
(2001)
Prod Plan Cont
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
18
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Chiu Y P, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engg Optim, 35 (2003) 427-437.
-
(2003)
Engg Optim
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
19
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single- stage production system
-
Jamal A M M, Sarker B R & Mondal S, Optimal manufacturing batch size with rework process at a single- stage production system, Compu Ind Engg, 47 (2004) 77-89.
-
(2004)
Compu Ind Engg
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
20
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
Chiu S W & Chiu Y-S P, Mathematical modeling for production system with backlogging and failure in repair, J Sci Ind Res, 65 (2006) 499-506.
-
(2006)
J Sci Ind Res
, vol.65
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
21
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
Chiu S W, Wang S-L & Chiu Y-S P, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns, Eur J Operat Res, 180 (2007) 664-676.
-
(2007)
Eur J Operat Res
, vol.180
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.-L.2
Chiu, Y.-S.P.3
-
22
-
-
30344488182
-
Economic lot sizing for an imperfect production system subject to random breakdowns
-
Lin G C & Kroll D E, Economic lot sizing for an imperfect production system subject to random breakdowns, Engg Optim, 38 (2006) 73-92.
-
(2006)
Engg Optim
, vol.38
, pp. 73-92
-
-
Lin, G.C.1
Kroll, D.E.2
-
23
-
-
48849090173
-
Effect of shortage level constraint on finite production rate model with rework
-
Chiu Y-S P. Chiu S W & Chao H-C, Effect of shortage level constraint on finite production rate model with rework, J Sci Ind Res, 67 (2008) 112-116.
-
(2008)
J Sci Ind Res
, vol.67
, pp. 112-116
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Chao, H.-C.3
-
24
-
-
34247872840
-
Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
-
Chiu S W, Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging, Appl Stochastic Models in Business & Industry, 23 (2007) 165-178.
-
(2007)
Appl Stochastic Models in Business and Industry
, vol.23
, pp. 165-178
-
-
Chiu, S.W.1
-
25
-
-
0017416997
-
Integrated inventory model for a single supplier - Single customer problem
-
Goyal S K, Integrated inventory model for a single supplier - single customer problem, Int J Prod Res, 15 (1977) 107-111.
-
(1977)
Int J Prod Res
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
26
-
-
84985846646
-
A joint economic-lot-size model for purchaser and vendor
-
Banerjee A, A joint economic-lot-size model for purchaser and vendor, Decision Sci, 17 (1986) 292-311.
-
(1986)
Decision Sci
, vol.17
, pp. 292-311
-
-
Banerjee, A.1
-
27
-
-
0026869895
-
Economic manufacturing quantity in a just-in-time delivery system
-
Golhar D & Sarker B, Economic manufacturing quantity in a just-in-time delivery system, Int J Prod Res, 30 (1992) 961-972.
-
(1992)
Int J Prod Res
, vol.30
, pp. 961-972
-
-
Golhar, D.1
Sarker, B.2
-
28
-
-
84974873088
-
An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
-
Sarker B R & Parija G R, An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy, J Operat Res Soc, 45 (1994) 891-900.
-
(1994)
J Operat Res Soc
, vol.45
, pp. 891-900
-
-
Sarker, B.R.1
Parija, G.R.2
-
29
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
Lu L, A one-vendor multi-buyer integrated inventory model, Eur J Operat Res, 81 (1995) 312-323.
-
(1995)
Eur J Operat Res
, vol.81
, pp. 312-323
-
-
Lu, L.1
-
30
-
-
0030190937
-
Optimizing a production system with a fixed delivery schedule
-
Hill R M, Optimizing a production system with a fixed delivery schedule, J Operat Res Soc, 47 (1996) 954-960. (Pubitemid 126576160)
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.7
, pp. 954-960
-
-
Hill, R.M.1
-
31
-
-
0032002459
-
Optimal strategy for the integrated vendor-buyer inventory model
-
PII S0377221797000325
-
Viswanathan S, Optimal strategy for the integrated vendor-buyer inventory model, Eur J Operat Res, 105 (1998) 38-42. (Pubitemid 128387758)
-
(1998)
European Journal of Operational Research
, vol.105
, Issue.1
, pp. 38-42
-
-
Viswanathan, S.1
-
32
-
-
0033297229
-
Optimal batch size for a production system operating under periodic delivery policy
-
Sarker R A & Khan L R, Optimal batch size for a production system operating under periodic delivery policy, Comp Ind Engg, 37 (1999)711-730.
-
(1999)
Comp Ind Engg
, vol.37
, pp. 711-730
-
-
Sarker, R.A.1
Khan, L.R.2
-
33
-
-
0037121477
-
A single-vendor and multiple-buyers production-inventory policy for a deteriorating item
-
Yang P C & Wee H M, A single-vendor and multiple-buyers production-inventory policy for a deteriorating item, Eur J Operat Res, 143 (2002) 570-581.
-
(2002)
Eur J Operat Res
, vol.143
, pp. 570-581
-
-
Yang, P.C.1
Wee, H.M.2
-
34
-
-
0037400725
-
Optimizing inventory decisions in a multi-stage multi-customer supply chain
-
DOI 10.1016/S1366-5545(02)00036-4
-
Khouja M, Optimizing inventory decisions in a multi-stage multi- customer supply chain, Transport Res Part E: Logistics Transport Rev, 39 (2003) 193-208. (Pubitemid 36302882)
-
(2003)
Transportation Research Part E: Logistics and Transportation Review
, vol.39
, Issue.3
, pp. 193-208
-
-
Khouja, M.1
-
35
-
-
9544241347
-
Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
-
Ouyang L-Y, Wu K-S & Ho C-H, Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time, Int J Prod Econ, 92 (2004) 255-266.
-
(2004)
Int J Prod Econ
, vol.92
, pp. 255-266
-
-
Ouyang, L.-Y.1
Wu, K.-S.2
Ho, C.-H.3
-
36
-
-
34249311990
-
An optimal batch size for an imperfect production system with quality assurance and rework
-
DOI 10.1080/00207540600711853, PII 779017400
-
Ojha D, Sarker B R & Biswas P, An optimal batch size for an imperfect production system with quality assurance and rework, Int J Prod Res, 45 (2007) 3191-3214. (Pubitemid 46809098)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.14
, pp. 3191-3214
-
-
Ojha, D.1
Sarker, B.R.2
Biswas, P.3
|