메뉴 건너뛰기




Volumn 68, Issue 6, 2009, Pages 505-512

Incorporating multi-delivery policy and quality assurance into economic production lot size problem

Author keywords

EPQ model; Lot sizing; Multiple deliveries; Production; Rework; Scrap

Indexed keywords

EPQ MODEL; LOT SIZING; MULTIPLE DELIVERIES; REWORK; SCRAP;

EID: 68649107898     PISSN: 00224456     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (37)

References (36)
  • 1
    • 0000356787 scopus 로고
    • How many parts to make at once
    • Harris F W, How many parts to make at once, Factory, Mag Manage, 10 (1913) 135-136;
    • (1913) Factory, Mag Manage , vol.10 , pp. 135-136
    • Harris, F.W.1
  • 2
    • 0011641845 scopus 로고    scopus 로고
    • reprinted
    • reprinted Operat Res, 38 (1990) 947-950.
    • Operat Res , vol.38 , Issue.1990 , pp. 947-950
  • 6
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt M J & Lee H L, Economic production cycles with imperfect production processes, HE Trans, 18 (1986) 48-55.
    • (1986) HE Trans , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 7
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H L & Rosenblatt M J, Simultaneous determination of production cycle and inspection schedules in a production system, Manage Sci, 33 (1987) 1125-1136.
    • (1987) Manage Sci , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 8
    • 0026116409 scopus 로고
    • An economic order quantity model with demand- dependent unit production cost and imperfect production processes
    • Cheng T C E, An economic order quantity model with demand- dependent unit production cost and imperfect production processes, HE Trans, 23 (1991) 23-28.
    • (1991) HE Trans , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 10
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • Moinzadeh K & Aggarwal P, Analysis of a production/inventory system subject to random disruptions, Manage Sci, 43 (1997) 1577-1588. (Pubitemid 127606213)
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 11
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • PII S0377221796001361
    • Kuhn H, A dynamic lot sizing model with exponential machine breakdowns, Eur J Operat Res, 100 (1997) 514-536. (Pubitemid 127392374)
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 514-536
    • Kuhn, H.1
  • 12
    • 0031232875 scopus 로고    scopus 로고
    • An extended optimal lot sizing model with an unreliable machine
    • Kim C H, Hong Y & Kim S-Y, An extended optimal lot sizing model with an unreliable machine, Prod Plan Cont, 8 (1997) 577-585. (Pubitemid 127649061)
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 577-585
    • Kim, C.H.1    Hong, Y.2    Kim, S.-Y.3
  • 13
    • 0035577718 scopus 로고    scopus 로고
    • Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
    • Rahim M A & Ben-Daya M, Joint determination of production quantity, inspection schedule and quality control for imperfect process with deteriorating products, J Operat Res Soc, 52 (2001) 1370-1378. (Pubitemid 33128273)
    • (2001) Journal of the Operational Research Society , vol.52 , Issue.12 , pp. 1370-1378
    • Rahim, M.A.1    Ben-Daya, M.2
  • 14
    • 33748703640 scopus 로고    scopus 로고
    • Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
    • Chiu S W, Chiu Y-S P & Shih C, Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing-method, J Sci Ind Res, 65 (2006)695-701. (Pubitemid 44390410)
    • (2006) Journal of Scientific and Industrial Research , vol.65 , Issue.9 , pp. 695-701
    • Chiu, S.W.1    Chiu, Y.-S.P.2    Shih, C.-C.3
  • 15
    • 34250899311 scopus 로고    scopus 로고
    • A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram
    • Chiu S W, Shih C & Chiu Y-S P, A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram, P I Mech Eng Part B: J Engg Manuf, 221 (2007) 489-497.
    • (2007) P i Mech Eng Part B: J Engg Manuf , vol.221 , pp. 489-497
    • Chiu, S.W.1    Shih, C.2    Chiu, Y.-S.P.3
  • 16
    • 0032299489 scopus 로고    scopus 로고
    • Minimal repair policies for an economic manufacturing process
    • Dohi T, Kaio N & Osaki S, Minimal repair policies for an economic manufacturing process, J Qual Maintenance Engg, 4 (1998) 248-262.
    • (1998) J Qual Maintenance Engg , vol.4 , pp. 248-262
    • Dohi, T.1    Kaio, N.2    Osaki, S.3
  • 17
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek P A & Salameh M K, Production lot sizing with the reworking of imperfect quality items produced, Prod Plan Cont, 12 (2001) 584-590.
    • (2001) Prod Plan Cont , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 18
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Chiu Y P, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engg Optim, 35 (2003) 427-437.
    • (2003) Engg Optim , vol.35 , pp. 427-437
    • Chiu, Y.P.1
  • 19
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single- stage production system
    • Jamal A M M, Sarker B R & Mondal S, Optimal manufacturing batch size with rework process at a single- stage production system, Compu Ind Engg, 47 (2004) 77-89.
    • (2004) Compu Ind Engg , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 20
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • Chiu S W & Chiu Y-S P, Mathematical modeling for production system with backlogging and failure in repair, J Sci Ind Res, 65 (2006) 499-506.
    • (2006) J Sci Ind Res , vol.65 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 21
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • Chiu S W, Wang S-L & Chiu Y-S P, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns, Eur J Operat Res, 180 (2007) 664-676.
    • (2007) Eur J Operat Res , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.-L.2    Chiu, Y.-S.P.3
  • 22
    • 30344488182 scopus 로고    scopus 로고
    • Economic lot sizing for an imperfect production system subject to random breakdowns
    • Lin G C & Kroll D E, Economic lot sizing for an imperfect production system subject to random breakdowns, Engg Optim, 38 (2006) 73-92.
    • (2006) Engg Optim , vol.38 , pp. 73-92
    • Lin, G.C.1    Kroll, D.E.2
  • 23
    • 48849090173 scopus 로고    scopus 로고
    • Effect of shortage level constraint on finite production rate model with rework
    • Chiu Y-S P. Chiu S W & Chao H-C, Effect of shortage level constraint on finite production rate model with rework, J Sci Ind Res, 67 (2008) 112-116.
    • (2008) J Sci Ind Res , vol.67 , pp. 112-116
    • Chiu, Y.-S.P.1    Chiu, S.W.2    Chao, H.-C.3
  • 24
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • Chiu S W, Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging, Appl Stochastic Models in Business & Industry, 23 (2007) 165-178.
    • (2007) Appl Stochastic Models in Business and Industry , vol.23 , pp. 165-178
    • Chiu, S.W.1
  • 25
    • 0017416997 scopus 로고
    • Integrated inventory model for a single supplier - Single customer problem
    • Goyal S K, Integrated inventory model for a single supplier - single customer problem, Int J Prod Res, 15 (1977) 107-111.
    • (1977) Int J Prod Res , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 26
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • Banerjee A, A joint economic-lot-size model for purchaser and vendor, Decision Sci, 17 (1986) 292-311.
    • (1986) Decision Sci , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 27
    • 0026869895 scopus 로고
    • Economic manufacturing quantity in a just-in-time delivery system
    • Golhar D & Sarker B, Economic manufacturing quantity in a just-in-time delivery system, Int J Prod Res, 30 (1992) 961-972.
    • (1992) Int J Prod Res , vol.30 , pp. 961-972
    • Golhar, D.1    Sarker, B.2
  • 28
    • 84974873088 scopus 로고
    • An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
    • Sarker B R & Parija G R, An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy, J Operat Res Soc, 45 (1994) 891-900.
    • (1994) J Operat Res Soc , vol.45 , pp. 891-900
    • Sarker, B.R.1    Parija, G.R.2
  • 29
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • Lu L, A one-vendor multi-buyer integrated inventory model, Eur J Operat Res, 81 (1995) 312-323.
    • (1995) Eur J Operat Res , vol.81 , pp. 312-323
    • Lu, L.1
  • 30
    • 0030190937 scopus 로고    scopus 로고
    • Optimizing a production system with a fixed delivery schedule
    • Hill R M, Optimizing a production system with a fixed delivery schedule, J Operat Res Soc, 47 (1996) 954-960. (Pubitemid 126576160)
    • (1996) Journal of the Operational Research Society , vol.47 , Issue.7 , pp. 954-960
    • Hill, R.M.1
  • 31
    • 0032002459 scopus 로고    scopus 로고
    • Optimal strategy for the integrated vendor-buyer inventory model
    • PII S0377221797000325
    • Viswanathan S, Optimal strategy for the integrated vendor-buyer inventory model, Eur J Operat Res, 105 (1998) 38-42. (Pubitemid 128387758)
    • (1998) European Journal of Operational Research , vol.105 , Issue.1 , pp. 38-42
    • Viswanathan, S.1
  • 32
    • 0033297229 scopus 로고    scopus 로고
    • Optimal batch size for a production system operating under periodic delivery policy
    • Sarker R A & Khan L R, Optimal batch size for a production system operating under periodic delivery policy, Comp Ind Engg, 37 (1999)711-730.
    • (1999) Comp Ind Engg , vol.37 , pp. 711-730
    • Sarker, R.A.1    Khan, L.R.2
  • 33
    • 0037121477 scopus 로고    scopus 로고
    • A single-vendor and multiple-buyers production-inventory policy for a deteriorating item
    • Yang P C & Wee H M, A single-vendor and multiple-buyers production-inventory policy for a deteriorating item, Eur J Operat Res, 143 (2002) 570-581.
    • (2002) Eur J Operat Res , vol.143 , pp. 570-581
    • Yang, P.C.1    Wee, H.M.2
  • 34
    • 0037400725 scopus 로고    scopus 로고
    • Optimizing inventory decisions in a multi-stage multi-customer supply chain
    • DOI 10.1016/S1366-5545(02)00036-4
    • Khouja M, Optimizing inventory decisions in a multi-stage multi- customer supply chain, Transport Res Part E: Logistics Transport Rev, 39 (2003) 193-208. (Pubitemid 36302882)
    • (2003) Transportation Research Part E: Logistics and Transportation Review , vol.39 , Issue.3 , pp. 193-208
    • Khouja, M.1
  • 35
    • 9544241347 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
    • Ouyang L-Y, Wu K-S & Ho C-H, Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time, Int J Prod Econ, 92 (2004) 255-266.
    • (2004) Int J Prod Econ , vol.92 , pp. 255-266
    • Ouyang, L.-Y.1    Wu, K.-S.2    Ho, C.-H.3
  • 36
    • 34249311990 scopus 로고    scopus 로고
    • An optimal batch size for an imperfect production system with quality assurance and rework
    • DOI 10.1080/00207540600711853, PII 779017400
    • Ojha D, Sarker B R & Biswas P, An optimal batch size for an imperfect production system with quality assurance and rework, Int J Prod Res, 45 (2007) 3191-3214. (Pubitemid 46809098)
    • (2007) International Journal of Production Research , vol.45 , Issue.14 , pp. 3191-3214
    • Ojha, D.1    Sarker, B.R.2    Biswas, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.