메뉴 건너뛰기




Volumn 15, Issue 3, 2009, Pages 255-274

Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown

Author keywords

Backorder; Breakdown; EMQ; Failure in rework; Manufacturing; Optimization

Indexed keywords

BACKORDERS; BREAKDOWN; ECONOMIC MANUFACTURING QUANTITY MODELS; EMQ; FAILURE-IN-REWORK; LONG-RUN AVERAGE COST; MEAN TIME BETWEEN FAILURES; RENEWAL REWARD THEOREM;

EID: 68849112586     PISSN: 13873954     EISSN: 17445051     Source Type: Journal    
DOI: 10.1080/13873950902808602     Document Type: Article
Times cited : (29)

References (30)
  • 1
    • 0000356787 scopus 로고
    • How many parts to make at once. Factory
    • F.W. Harris, How many parts to make at once. Factory, Magazine Manage. 10 (1913), pp. 135-136.
    • (1913) Magazine Manage , vol.10 , pp. 135-136
    • Harris, F.W.1
  • 7
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable production facility
    • T. Bielecki and P.R. Kumar, Optimality of zero-inventory policies for unreliable production facility, Oper. Res. 36 (1988), pp. 532-541.
    • (1988) Oper. Res. , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 8
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • T. Boone, R. Ganeshan, Y. Guo, and J.K. Ord, The impact of imperfect processes on production run times, Decis. Sci. 31 (2000), pp. 773-785.
    • (2000) Decis. Sci. , vol.31 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 9
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Trans. 23 (1991), pp. 23-28.
    • (1991) IIE Trans. , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 10
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • K.L. Cheung and W.H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment, Nav. Res. Logistics 44 (1997), pp.257-272.
    • (1997) Nav. Res. Logistics , vol.44 , pp. 257-272
    • Cheung, K.L.1    Hausman, W.H.2
  • 11
    • 0032683886 scopus 로고    scopus 로고
    • Optimal preventive maintenance in a production inventory system
    • T.K. Das and S. Sarkar, Optimal preventive maintenance in a production inventory system, IIE Trans. 31 (1999), pp. 537-551.
    • (1999) IIE Trans. , vol.31 , pp. 537-551
    • Das, T.K.1    Sarkar, S.2
  • 12
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • H.L. Lee and M.J. Rosenblatt (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Manage. Sci. 33, pp. 1125-1136.
    • (1987) Manage. Sci. , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 13
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes, IIE Trans. 18 (1986), pp. 48-55.
    • (1986) IIE Trans. , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 14
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in an EOQ model with random yield, IIE Trans. 22 (1990), pp. 41-47.
    • (1990) IIE Trans. , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2
  • 15
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced, Prod. Plann. Control 12 (2001), pp. 584-590.
    • (2001) Prod. Plann. Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 16
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Eng. Optim. 35 (2003), pp. 427-437.
    • (2003) Eng. Optim. , vol.35 , pp. 427-437
    • Chiu, Y.P.1
  • 17
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • A.M.M. Jamal, B.R. Sarker, and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system, Comput. Ind. Eng. 47 (2004), pp. 77- 89.
    • (2004) Comput. Ind. Eng. , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 18
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • S.W. Chiu and Y.-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, J. Sci. Ind. Research. 65 (2006), pp. 499-506.
    • (2006) J. Sci. Ind. Research , vol.65 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 19
    • 34247097459 scopus 로고    scopus 로고
    • Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives
    • Y.-S.P. Chiu, H.-D. Lin, and F.-T. Cheng, Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives, P I Mech. E Part B: J. Eng. Manufact. 220 (2006), pp. 1559-1563.
    • (2006) P I Mech. E Part B: J. Eng. Manufact. , vol.220 , pp. 1559-1563
    • Chiu, Y.-S.P.1    Lin, H.-D.2    Cheng, F.-T.3
  • 20
    • 33645163509 scopus 로고    scopus 로고
    • The effect of service level constraint on EPQ model with random defective rate
    • (Article ID 98502), (doi:10.1155/ MPE/2006/98502)
    • Y.-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate, Math. Probl. Eng. (2006). (Article ID 98502), 13 pages (doi:10.1155/ MPE/2006/98502).
    • (2006) Math. Probl. Eng. , pp. 13
    • Chiu, Y.1
  • 21
    • 48849111365 scopus 로고    scopus 로고
    • Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time
    • Y.-S.P. Chiu, S.-S. Wang, C.-K. Ting, H.-J. Chuang, and Y.-L. Lien, Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time, WSEAS Trans. Inf. Sci. Appl. 5 (2008), pp. 475-486.
    • (2008) WSEAS Trans. Inf. Sci. Appl. , vol.5 , pp. 475-486
    • Chiu, Y.-S.P.1    Wang, S.-S.2    Ting, C.-K.3    Chuang, H.-J.4    Lien, Y.-L.5
  • 22
    • 0032187128 scopus 로고    scopus 로고
    • Inventory management under random supply disruptions and partial backorders
    • A. Arreola-Risa and G.A. DeCroix, Inventory management under random supply disruptions and partial backorders, Nav. Res. Logistics. 45 (1998), pp. 687-703.
    • (1998) Nav. Res. Logistics , vol.45 , pp. 687-703
    • Arreola-Risa, A.1    DeCroix, G.A.2
  • 23
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdowns
    • K.J. Chung, Bounds for production lot sizing with machine breakdowns, Comput. Ind. Eng. 32 (1997), pp. 139-144.
    • (1997) Comput. Ind. Eng. , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 24
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • B.C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system, J. Oper. Res. Soc. 56 (2005), pp. 563-575.
    • (2005) J. Oper. Res. Soc. , vol.56 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 25
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • H. Groenevelt, L. Pintelon, and A. Seidmann, Production lot sizing with machine breakdowns, Manage. Sci. 38 (1992), pp. 104-123.
    • (1992) Manage. Sci. , vol.38 , pp. 104-123
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 26
    • 0031232875 scopus 로고    scopus 로고
    • An extended optimal lot sizing model with an unreliable machine
    • C.H. Kim, Y. Hong, and S.-Y. Kim, An extended optimal lot sizing model with an unreliable machine, Prod. Plann. Control 8 (1997), pp. 577-585.
    • (1997) Prod. Plann. Control , vol.8 , pp. 577-585
    • Kim, C.H.1    Hong, Y.2    Kim, S.-Y.3
  • 27
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns, Eur. J. Oper. Res. 100 (1997), pp. 514-536.
    • (1997) Eur. J. Oper. Res. , vol.100 , pp. 514-536
    • Kuhn, H.1
  • 28
    • 30344488182 scopus 로고    scopus 로고
    • Economic lot sizing for an imperfect production system subject to random breakdowns
    • G.C. Lin and D.E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns, Eng. Optim. 38 (2006), pp. 73-92.
    • (2006) Eng. Optim. , vol.38 , pp. 73-92
    • Lin, G.C.1    Kroll, D.E.2
  • 29
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inspections and random machine failures
    • V. Makis and J. Fung, An EMQ model with inspections and random machine failures, J. Oper. Res. Soc. 49 (1998), pp. 66-76.
    • (1998) J. Oper. Res. Soc. , vol.49 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 30
    • 0004256022 scopus 로고    scopus 로고
    • International edition, Prentice-Hall, New Jersey
    • R.L. Rardin, Optimization in Operations Research, International edition, Prentice-Hall, New Jersey, 1998, pp. 739-741.
    • (1998) Optimization in Operations Research , pp. 739-741
    • Rardin, R.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.