-
1
-
-
0000356787
-
How many parts to make at once. Factory
-
F.W. Harris, How many parts to make at once. Factory, Magazine Manage. 10 (1913), pp. 135-136.
-
(1913)
Magazine Manage
, vol.10
, pp. 135-136
-
-
Harris, F.W.1
-
2
-
-
0003398158
-
-
Wiley, New York
-
E.A. Silver, D.F. Pyke, and R. Peterson, Inventory Management and Production Planning and Scheduling, Wiley, New York, 1998, pp. 151-172.
-
(1998)
Inventory Management and Production Planning and Scheduling
, pp. 151-172
-
-
Silver, E.A.1
Pyke, D.F.2
Peterson, R.3
-
4
-
-
0004020261
-
-
7th ed., McGraw Hill, New York
-
F.S. Hillier and G.J. Lieberman, Introduction to Operations Research, 7th ed., McGraw Hill, New York, 2001, pp. 941-958.
-
(2001)
Introduction to Operations Research
, pp. 941-958
-
-
Hillier, F.S.1
Lieberman, G.J.2
-
5
-
-
0003397637
-
-
5th ed., McGraw Hill, New York
-
S. Nahmias, Production & Operations Analysis, 5th ed., McGraw Hill, New York, 2005, pp. 195-223.
-
(2005)
Production & Operations Analysis
, pp. 195-223
-
-
Nahmias, S.1
-
6
-
-
0002656713
-
Use of the EOQ model for inventory analysis
-
S. Osteryoung, E. Nosari, D. McCarty, and W.J. Reinhart, Use of the EOQ model for inventory analysis, Prod. Inventory Manage. 27 (1986), pp. 39-45.
-
(1986)
Prod. Inventory Manage
, vol.27
, pp. 39-45
-
-
Osteryoung, S.1
Nosari, E.2
McCarty, D.3
Reinhart W., J.4
-
7
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable production facility
-
T. Bielecki and P.R. Kumar, Optimality of zero-inventory policies for unreliable production facility, Oper. Res. 36 (1988), pp. 532-541.
-
(1988)
Oper. Res.
, vol.36
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
8
-
-
0039029278
-
The impact of imperfect processes on production run times
-
T. Boone, R. Ganeshan, Y. Guo, and J.K. Ord, The impact of imperfect processes on production run times, Decis. Sci. 31 (2000), pp. 773-785.
-
(2000)
Decis. Sci.
, vol.31
, pp. 773-785
-
-
Boone, T.1
Ganeshan, R.2
Guo, Y.3
Ord, J.K.4
-
9
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Trans. 23 (1991), pp. 23-28.
-
(1991)
IIE Trans.
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
10
-
-
0031119032
-
Joint determination of preventive maintenance and safety stocks in an unreliable production environment
-
K.L. Cheung and W.H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment, Nav. Res. Logistics 44 (1997), pp.257-272.
-
(1997)
Nav. Res. Logistics
, vol.44
, pp. 257-272
-
-
Cheung, K.L.1
Hausman, W.H.2
-
11
-
-
0032683886
-
Optimal preventive maintenance in a production inventory system
-
T.K. Das and S. Sarkar, Optimal preventive maintenance in a production inventory system, IIE Trans. 31 (1999), pp. 537-551.
-
(1999)
IIE Trans.
, vol.31
, pp. 537-551
-
-
Das, T.K.1
Sarkar, S.2
-
12
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
H.L. Lee and M.J. Rosenblatt (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Manage. Sci. 33, pp. 1125-1136.
-
(1987)
Manage. Sci.
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
13
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes, IIE Trans. 18 (1986), pp. 48-55.
-
(1986)
IIE Trans.
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
14
-
-
0025399639
-
Joint lot sizing and inspection policy in an EOQ model with random yield
-
X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in an EOQ model with random yield, IIE Trans. 22 (1990), pp. 41-47.
-
(1990)
IIE Trans.
, vol.22
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
-
15
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced, Prod. Plann. Control 12 (2001), pp. 584-590.
-
(2001)
Prod. Plann. Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
16
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Eng. Optim. 35 (2003), pp. 427-437.
-
(2003)
Eng. Optim.
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
17
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
A.M.M. Jamal, B.R. Sarker, and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system, Comput. Ind. Eng. 47 (2004), pp. 77- 89.
-
(2004)
Comput. Ind. Eng.
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
18
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
S.W. Chiu and Y.-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, J. Sci. Ind. Research. 65 (2006), pp. 499-506.
-
(2006)
J. Sci. Ind. Research
, vol.65
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
19
-
-
34247097459
-
Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives
-
Y.-S.P. Chiu, H.-D. Lin, and F.-T. Cheng, Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives, P I Mech. E Part B: J. Eng. Manufact. 220 (2006), pp. 1559-1563.
-
(2006)
P I Mech. E Part B: J. Eng. Manufact.
, vol.220
, pp. 1559-1563
-
-
Chiu, Y.-S.P.1
Lin, H.-D.2
Cheng, F.-T.3
-
20
-
-
33645163509
-
The effect of service level constraint on EPQ model with random defective rate
-
(Article ID 98502), (doi:10.1155/ MPE/2006/98502)
-
Y.-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate, Math. Probl. Eng. (2006). (Article ID 98502), 13 pages (doi:10.1155/ MPE/2006/98502).
-
(2006)
Math. Probl. Eng.
, pp. 13
-
-
Chiu, Y.1
-
21
-
-
48849111365
-
Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time
-
Y.-S.P. Chiu, S.-S. Wang, C.-K. Ting, H.-J. Chuang, and Y.-L. Lien, Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time, WSEAS Trans. Inf. Sci. Appl. 5 (2008), pp. 475-486.
-
(2008)
WSEAS Trans. Inf. Sci. Appl.
, vol.5
, pp. 475-486
-
-
Chiu, Y.-S.P.1
Wang, S.-S.2
Ting, C.-K.3
Chuang, H.-J.4
Lien, Y.-L.5
-
22
-
-
0032187128
-
Inventory management under random supply disruptions and partial backorders
-
A. Arreola-Risa and G.A. DeCroix, Inventory management under random supply disruptions and partial backorders, Nav. Res. Logistics. 45 (1998), pp. 687-703.
-
(1998)
Nav. Res. Logistics
, vol.45
, pp. 687-703
-
-
Arreola-Risa, A.1
DeCroix, G.A.2
-
23
-
-
0030835106
-
Bounds for production lot sizing with machine breakdowns
-
K.J. Chung, Bounds for production lot sizing with machine breakdowns, Comput. Ind. Eng. 32 (1997), pp. 139-144.
-
(1997)
Comput. Ind. Eng.
, vol.32
, pp. 139-144
-
-
Chung, K.J.1
-
24
-
-
17644387571
-
Exact formulation of stochastic EMQ model for an unreliable production system
-
B.C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system, J. Oper. Res. Soc. 56 (2005), pp. 563-575.
-
(2005)
J. Oper. Res. Soc.
, vol.56
, pp. 563-575
-
-
Giri, B.C.1
Dohi, T.2
-
25
-
-
0026454137
-
Production lot sizing with machine breakdowns
-
H. Groenevelt, L. Pintelon, and A. Seidmann, Production lot sizing with machine breakdowns, Manage. Sci. 38 (1992), pp. 104-123.
-
(1992)
Manage. Sci.
, vol.38
, pp. 104-123
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
26
-
-
0031232875
-
An extended optimal lot sizing model with an unreliable machine
-
C.H. Kim, Y. Hong, and S.-Y. Kim, An extended optimal lot sizing model with an unreliable machine, Prod. Plann. Control 8 (1997), pp. 577-585.
-
(1997)
Prod. Plann. Control
, vol.8
, pp. 577-585
-
-
Kim, C.H.1
Hong, Y.2
Kim, S.-Y.3
-
27
-
-
23144434063
-
A dynamic lot sizing model with exponential machine breakdowns
-
H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns, Eur. J. Oper. Res. 100 (1997), pp. 514-536.
-
(1997)
Eur. J. Oper. Res.
, vol.100
, pp. 514-536
-
-
Kuhn, H.1
-
28
-
-
30344488182
-
Economic lot sizing for an imperfect production system subject to random breakdowns
-
G.C. Lin and D.E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns, Eng. Optim. 38 (2006), pp. 73-92.
-
(2006)
Eng. Optim.
, vol.38
, pp. 73-92
-
-
Lin, G.C.1
Kroll, D.E.2
-
29
-
-
0031699435
-
An EMQ model with inspections and random machine failures
-
V. Makis and J. Fung, An EMQ model with inspections and random machine failures, J. Oper. Res. Soc. 49 (1998), pp. 66-76.
-
(1998)
J. Oper. Res. Soc.
, vol.49
, pp. 66-76
-
-
Makis, V.1
Fung, J.2
-
30
-
-
0004256022
-
-
International edition, Prentice-Hall, New Jersey
-
R.L. Rardin, Optimization in Operations Research, International edition, Prentice-Hall, New Jersey, 1998, pp. 739-741.
-
(1998)
Optimization in Operations Research
, pp. 739-741
-
-
Rardin, R.L.1
|