메뉴 건너뛰기




Volumn 223, Issue 2, 2009, Pages 183-194

Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy

Author keywords

Abort resume policy; Breakdown; EMQ model; Imperfect rework; Inventory; Manufacturing; Optimal run time; Random defective rate

Indexed keywords

ABORT/RESUME POLICY; BREAKDOWN; EMQ MODEL; IMPERFECT REWORK; INVENTORY; MANUFACTURING; OPTIMAL RUN TIME; RANDOM DEFECTIVE RATE;

EID: 67649826546     PISSN: 09544054     EISSN: None     Source Type: Journal    
DOI: 10.1243/09544054JEM1197     Document Type: Article
Times cited : (17)

References (34)
  • 1
    • 0000356787 scopus 로고
    • How many parts to make at once
    • Harris, F. W. How many parts to make at once. Factory, Mag. Managmt, 1913, 10, 135-136.
    • (1913) Factory, Mag. Managmt , vol.10 , pp. 135-136
    • Harris, F.W.1
  • 5
    • 0016079895 scopus 로고
    • A review of current inventory theory and its application
    • Aggarwal, S. A review of current inventory theory and its application. Int. J. Prod. Res., 1974, 12, 443-482.
    • (1974) Int. J. Prod. Res , vol.12 , pp. 443-482
    • Aggarwal, S.1
  • 7
    • 20144386266 scopus 로고    scopus 로고
    • Cheung,C.F.,Wang,W.M., and Kwok, S.K. Knowledge-based inventory management in production logistics: A multi-agent approach. Proc. IMechE, Part B: J. Engineering Manufacture, 2005, 219(3), 299-307.
    • Cheung,C.F.,Wang,W.M., and Kwok, S.K. Knowledge-based inventory management in production logistics: A multi-agent approach. Proc. IMechE, Part B: J. Engineering Manufacture, 2005, 219(3), 299-307.
  • 8
    • 33645151237 scopus 로고    scopus 로고
    • Fix and relax heuristic for a stochastic lot-sizing problem
    • Beraldi, P., Ghiani, G., Grieco, A., and Guerriero, E. Fix and relax heuristic for a stochastic lot-sizing problem. Comput. Optim. Applic., 2006, 33, 303-318.
    • (2006) Comput. Optim. Applic , vol.33 , pp. 303-318
    • Beraldi, P.1    Ghiani, G.2    Grieco, A.3    Guerriero, E.4
  • 9
    • 36849095468 scopus 로고    scopus 로고
    • Chiu, S. W. Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model. Proc. IMechE, Part B: J. Engineering Manufacture, 2007, 221(7), 1235-1243.
    • Chiu, S. W. Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model. Proc. IMechE, Part B: J. Engineering Manufacture, 2007, 221(7), 1235-1243.
  • 10
    • 0027927229 scopus 로고
    • Production-inventory systems with unreliable machines
    • Berg, M., Posner, M. J. M., and Zhao, H. Production-inventory systems with unreliable machines. Operational Res., 1994, 42, 111-118.
    • (1994) Operational Res , vol.42 , pp. 111-118
    • Berg, M.1    Posner, M.J.M.2    Zhao, H.3
  • 11
    • 38149032966 scopus 로고    scopus 로고
    • Gümüs, A. T. and Güneri, A. F. Multi-echelon inventory management in supply chains with uncertain demand and lead times: Literature review from an operational research perspective. Proc. IMechE, Part B: J. Engineering Manufacture, 2007, 221(10), 1553-1570.
    • Gümüs, A. T. and Güneri, A. F. Multi-echelon inventory management in supply chains with uncertain demand and lead times: Literature review from an operational research perspective. Proc. IMechE, Part B: J. Engineering Manufacture, 2007, 221(10), 1553-1570.
  • 12
    • 34250899311 scopus 로고    scopus 로고
    • Chiu, S. W., Shih, C.-C., and Chiu, Y.-S. P. A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram. Proc. IMechE, Part B: J. Engineering Manufacture, 2007, 221 (3), 489-497.
    • Chiu, S. W., Shih, C.-C., and Chiu, Y.-S. P. A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram. Proc. IMechE, Part B: J. Engineering Manufacture, 2007, 221 (3), 489-497.
  • 14
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • Boone, T., Ganeshan, R., Guo, Y., and Ord, J. K. The impact of imperfect processes on production run times. Decision Sci., 2000, 31, 773-785.
    • (2000) Decision Sci , vol.31 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 15
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • Cheung, K. L. and Hausman, W. H. Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Res. Logistics, 1997, 44, 257-272.
    • (1997) Naval Res. Logistics , vol.44 , pp. 257-272
    • Cheung, K.L.1    Hausman, W.H.2
  • 16
    • 0032683886 scopus 로고
    • Optimal preventive maintenance in a production inventory system
    • Das, T. K. and Sarkar, S. Optimal preventive maintenance in a production inventory system. IIE Trans., 1990, 31, 537-551.
    • (1990) IIE Trans , vol.31 , pp. 537-551
    • Das, T.K.1    Sarkar, S.2
  • 17
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee, H. L. and Rosenblatt, M. J. Simultaneous determination of production cycle and inspection schedules in a production system. Managemt Sci., 1987, 33, 1125- 1136.
    • (1987) Managemt Sci , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 18
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt, M. J. and Lee, H. L. Economic production cycles with imperfect production processes. IIE Trans., 1986, 18, 48-55.
    • (1986) IIE Trans , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 19
    • 34247097459 scopus 로고    scopus 로고
    • Chiu, Y.-S., Lin, H.-D., and Cheng, F.-T. Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives. Proc. IMechE., Part B: J. Engineering Manufacture, 2006, 220 (9), 1559-1563.
    • Chiu, Y.-S., Lin, H.-D., and Cheng, F.-T. Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives. Proc. IMechE., Part B: J. Engineering Manufacture, 2006, 220 (9), 1559-1563.
  • 20
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • Chiu, S. W. and Chiu, Y.-P. Mathematical modeling for production system with backlogging and failure in repair. J. Sci. Ind. Res., 2006, 65(6), 499-506.
    • (2006) J. Sci. Ind. Res , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-P.2
  • 21
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • Chiu, S. W. Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Appl. Stochastic Models Business Industry, 2007, 23, 165-178.
    • (2007) Appl. Stochastic Models Business Industry , vol.23 , pp. 165-178
    • Chiu, S.W.1
  • 22
    • 0032299489 scopus 로고    scopus 로고
    • Minimal repair policies for an economic manufacturing process
    • Dohi, T., Kaio, N., and Osaki, S. Minimal repair policies for an economic manufacturing process. J. Qual. Maintenance Engng, 1998, 4, 248-262.
    • (1998) J. Qual. Maintenance Engng , vol.4 , pp. 248-262
    • Dohi, T.1    Kaio, N.2    Osaki, S.3
  • 23
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • Giri, B. C. and Dohi, T. Exact formulation of stochastic EMQ model for an unreliable production system. J. Operational Res. Soc., 2005, 56, 563-575.
    • (2005) J. Operational Res. Soc , vol.56 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 24
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek, P. A. and Salameh, M. K. Production lot sizing with the reworking of imperfect quality items produced. Prod. Planning Control, 2001, 12, 584-590.
    • (2001) Prod. Planning Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 25
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • Jamal, A. M. M., Sarker, B. R., and Mondal, S. Optimal manufacturing batch size with rework process at a single-stage production system. Comput. Ind. Engng, 2004, 47, pp. 77-89.
    • (2004) Comput. Ind. Engng , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 26
    • 0031232875 scopus 로고    scopus 로고
    • An extended optimal lot sizing model with an unreliable machine
    • Kim, C. H., Hong, Y., and Kim, S.-Y. An extended optimal lot sizing model with an unreliable machine. Prod. Planning Control, 1997, 8, 577-585.
    • (1997) Prod. Planning Control , vol.8 , pp. 577-585
    • Kim, C.H.1    Hong, Y.2    Kim, S.-Y.3
  • 27
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • Groenevelt, H., Pintelon, L., and Seidmann, A. Production lot sizing with machine breakdowns. Managmt Sci., 1992, 38, 104-123.
    • (1992) Managmt Sci , vol.38 , pp. 104-123
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 28
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inspections and random machine failures
    • Makis, V. and Fung, J. An EMQ model with inspections and random machine failures. J. Operational Res. Soc., 1998, 49, 66-76.
    • (1998) J. Operational Res. Soc , vol.49 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 29
    • 0032764917 scopus 로고    scopus 로고
    • Analysis of a production-inventory system with machine breakdowns and shutdowns
    • Liu, B. and Cao, J. Analysis of a production-inventory system with machine breakdowns and shutdowns. Comput. Operational Res., 1999, 26, 73-91.
    • (1999) Comput. Operational Res , vol.26 , pp. 73-91
    • Liu, B.1    Cao, J.2
  • 30
    • 0030835106 scopus 로고    scopus 로고
    • Boundsforproduction lotsizing withmachine breakdowns
    • Chung,K.J. Boundsforproduction lotsizing withmachine breakdowns. Comput. Ind. Engng, 1997, 32, 139-144.
    • (1997) Comput. Ind. Engng , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 31
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • Chiu, S. W., Wang, S. L., and Chiu, Y.-S. P. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. Eur. J. Operational Res., 2007, 180, 664-676.
    • (2007) Eur. J. Operational Res , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.-S.P.3
  • 32
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • Moinzadeh, K. and Aggarwal, P. Analysis of a production/inventory system subject to random disruptions. Managmt Sci., 1997, 43, 1577-1588.
    • (1997) Managmt Sci , vol.43 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 33
    • 0037954442 scopus 로고    scopus 로고
    • Approximations to production lot sizing with machine breakdowns
    • Chung, K. J. Approximations to production lot sizing with machine breakdowns. Comput. Operations Res., 2003, 30, 1499-1507.
    • (2003) Comput. Operations Res , vol.30 , pp. 1499-1507
    • Chung, K.J.1
  • 34
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • Kuhn, H. A dynamic lot sizing model with exponential machine breakdowns. Eur. J. Operational Res., 1997, 100, 514-536.
    • (1997) Eur. J. Operational Res , vol.100 , pp. 514-536
    • Kuhn, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.