메뉴 건너뛰기




Volumn 35, Issue 4, 2003, Pages 427-437

Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging

Author keywords

EPQ; Manufacturing; Production; Production lot size; Reworking

Indexed keywords

CALCULATIONS; COST BENEFIT ANALYSIS; MATHEMATICAL MODELS; MATRIX ALGEBRA; PROBABILITY DENSITY FUNCTION; PRODUCTION CONTROL;

EID: 0142090745     PISSN: 0305215X     EISSN: None     Source Type: Journal    
DOI: 10.1080/03052150310001597783     Document Type: Article
Times cited : (216)

References (18)
  • 1
    • 0016079895 scopus 로고
    • A review of current inventory theory and its application
    • Aggarwal, B. C. (1974) A review of current inventory theory and its application. International Journal of Production Research, 12, 443-482.
    • (1974) International Journal of Production Research , vol.12 , pp. 443-482
    • Aggarwal, B.C.1
  • 2
    • 0011715734 scopus 로고
    • An EOQ model with random variations in demand
    • Brill, P. H. and Chaouch, B. A. (1995) An EOQ model with random variations in demand. Management Science, 41, 927-936.
    • (1995) Management Science , vol.41 , pp. 927-936
    • Brill, P.H.1    Chaouch, B.A.2
  • 3
    • 0026116409 scopus 로고
    • An economic order quantity model with production processes
    • Cheng, T. C. E. (1991) An economic order quantity model with production processes. IIE Transactions, 23, 23-28.
    • (1991) IIE Transactions , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 4
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdown
    • Chung, K. (1997) Bounds for production lot sizing with machine breakdown. Computers and Industrial Engineering, 32, 139-144.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.1
  • 5
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek, P. A. and Salameh, M. K. (2001) Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, 12(6), 584-590.
    • (2001) Production Planning and Control , vol.12 , Issue.6 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 6
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee, H. and Rosenblatt, M. (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33, 1125-1136.
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.1    Rosenblatt, M.2
  • 9
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus, E. L. (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 11
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt, M. J. and Lee, H. L. (1986) Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 16
    • 0142027341 scopus 로고
    • Optimal production policy for perishable items with partial backordering
    • Wee, H. M. (1995) Optimal production policy for perishable items with partial backordering. Engineering Optimization, 23, 315-322.
    • (1995) Engineering Optimization , vol.23 , pp. 315-322
    • Wee, H.M.1
  • 17
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in and EOQ model with random yield
    • Zhang and Gerchak, Y. (1990) Joint lot sizing and inspection policy in and EOQ model with random yield. IIE Transactions, 22, 41.
    • (1990) IIE Transactions , vol.22 , pp. 41
    • Zhang1    Gerchak, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.