메뉴 건너뛰기




Volumn 13, Issue 3, 2008, Pages 137-145

Mathematical method for expediting scrap"or"rework decision making in epq model with failure in repair

Author keywords

EPQ; Failure in repair Random defective rate; Production; Scrap"or"rework

Indexed keywords

DECISION MAKING; NUMERICAL METHODS; PRODUCTION; REPAIR;

EID: 62349085901     PISSN: 1300686X     EISSN: None     Source Type: Journal    
DOI: 10.3390/mca13030137     Document Type: Article
Times cited : (6)

References (17)
  • 1
    • 0037061529 scopus 로고    scopus 로고
    • The Economic Production LotSizing Problem with Imperfect Production Processes and Imperfect Maintenance
    • M. Ben"Daya, The Economic Production Lot"Sizing Problem with Imperfect Production Processes and Imperfect Maintenance, International Journal of Production Economics. 76, 257"264, 2002.
    • (2002) International Journal of Production Economics , vol.76 , pp. 257-264
    • Ben"Daya, M.1
  • 2
    • 0026116409 scopus 로고
    • An Economic Order Quantity Model with DemandDependent Unit Production Cost and Imperfect Production Processes
    • T.C.E. Cheng, An Economic Order Quantity Model with Demand"Dependent Unit Production Cost and Imperfect Production Processes, IIE Transaction. 23, 23"28, 1991.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 3
    • 33645167020 scopus 로고    scopus 로고
    • An Economic Production Quantity Model with the Steady Production Rate of Scrap Items
    • S.W. Chiu, Y.P. Chiu, and B.P. Wu, An Economic Production Quantity Model with the Steady Production Rate of Scrap Items, Journal of the Chaoyang University of Technology. 8, 1, 225"235, 2003.
    • (2003) Journal of the Chaoyang University of Technology , vol.8 , Issue.1 , pp. 225-235
    • Chiu, S.W.1    Chiu, Y.P.2    Wu, B.P.3
  • 4
    • 36849049574 scopus 로고    scopus 로고
    • Determining the Optimal Lot Size for the Finite Production Model with an Imperfect Rework Process of Defective Items
    • S.W. Chiu and D.C. Gong, Determining the Optimal Lot Size for the Finite Production Model with an Imperfect Rework Process of Defective Items, Journal of Information and Optimization Science. 24, 3, 105"119, 2003.
    • (2003) Journal of Information and Optimization Science , vol.24 , Issue.3 , pp. 105-119
    • Chiu, S.W.1    Gong, D.C.2
  • 5
    • 31344465116 scopus 로고    scopus 로고
    • YS.P. Chiu, S.W. Chiu, and H.D. Lin, Solving an EPQ Model with Rework and Service Level Constraint. Mathematical and Computational Applications, 11, 1, 7584, 2006.
    • Y"S.P. Chiu, S.W. Chiu, and H.D. Lin, Solving an EPQ Model with Rework and Service Level Constraint. Mathematical and Computational Applications, 11, 1, 75"84, 2006.
  • 6
    • 33745339066 scopus 로고    scopus 로고
    • S.W. Chiu and YS.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research. 65, 6, 499506, 2006.
    • S.W. Chiu and Y"S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research. 65, 6, 499"506, 2006.
  • 7
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for Production Lot Sizing with Machine Breakdown
    • K.J. Chung, Bounds for Production Lot Sizing with Machine Breakdown, Computers and Industrial Engineering. 32, 139"144, 1997.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 8
    • 0035470201 scopus 로고    scopus 로고
    • Production Lot Sizing with the Reworking of Imperfect Quality Items Produced
    • P.A. Hayek and M.K. Salameh, Production Lot Sizing with the Reworking of Imperfect Quality Items Produced, Production Planning and Control. 12, 6, 584"590, 2001.
    • (2001) Production Planning and Control , vol.12 , Issue.6 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 9
    • 0023412314 scopus 로고    scopus 로고
    • H.L. Lee and M.J. Rosenblatt, Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System, Management Science. 33, 11251136, 1987.
    • H.L. Lee and M.J. Rosenblatt, Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System, Management Science. 33, 1125"1136, 1987.
  • 10
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lotsizing in an imperfect production system with homogeneous reworkable jobs
    • J.J. Liu and P. Yang, Optimal lot"sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research. 91, 517"527, 1996.
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 13
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Transaction. 18, 48"55, 1986.
    • (1986) IIE Transaction , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 14
    • 62349129557 scopus 로고    scopus 로고
    • E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling. John Wiley & Sons, Inc. 151172, 1998.
    • E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling. John Wiley & Sons, Inc. 151"172, 1998.
  • 16
    • 0025399639 scopus 로고
    • Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield
    • X. Zhang and Y. Gerchak, Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield, IIE Transaction. 22, 41"47, 1990.
    • (1990) IIE Transaction , vol.22 , pp. 44-47
    • Zhang, X.1    Gerchak, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.