-
2
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
M. Ben-Daya, The economic production lot-sizing problem with imperfect production processes and imperfect maintenance, Int'l Journal of Production Economics, Vol. 76, 2002, pp.257-264.
-
(2002)
Int'l Journal of Production Economics
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
3
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction, Vol. 23, 1991, pp. 23-28.
-
(1991)
IIE Transaction
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
4
-
-
0032683886
-
Optimal preventive maintenance in a production inventory system
-
T. K. Das, S. Sarkar, Optimal preventive maintenance in a production inventory system. IIE Transactions, Vol. 31, 1999, pp.537-551.
-
(1999)
IIE Transactions
, vol.31
, pp. 537-551
-
-
Das, T.K.1
Sarkar, S.2
-
5
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
H. L. Lee and M. J. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, Vol. 33, 1987, pp. 1125-1136.
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
6
-
-
0025399639
-
Joint lot sizing and inspection policy in and EOQ model with random yield
-
X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in and EOQ model with random yield, IIE Transactions, Vol. 22, 1990, pp. 41-47.
-
(1990)
IIE Transactions
, vol.22
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
-
7
-
-
34347377629
-
Alternative approach for realistic lot-size problem with random scrap rate and backlogging
-
Y-S. Chiu, C-K. Ting, C-B. Cheng, and F-Y. Lin. Alternative approach for realistic lot-size problem with random scrap rate and backlogging. WSEAS Transactions on Mathematics, Vol. 6 (6), 2007, pp.736-740.
-
(2007)
WSEAS Transactions on Mathematics
, vol.6
, Issue.6
, pp. 736-740
-
-
Chiu, Y.-S.1
Ting, C.-K.2
Cheng, C.-B.3
Lin, F.-Y.4
-
8
-
-
33751564329
-
Constrained inventory allocation and its applications
-
P.G. Bradford, M.N. Katehakis. Constrained inventory allocation and its applications. WSEAS Transactions on Mathematics, Vol. 6 (2), 2007, pp.263-270.
-
(2007)
WSEAS Transactions on Mathematics
, vol.6
, Issue.2
, pp. 263-270
-
-
Bradford, P.G.1
Katehakis, M.N.2
-
9
-
-
38349101637
-
Algebraic methods for optimizing EPQ model with rework and scrap
-
Y-S.P. Chiu, F-T. Cheng, and C-K Ting, Algebraic methods for optimizing EPQ model with rework and scrap. WSEAS Transactions on Systems, Vol. 6 (11), 2007, pp.1319-1323.
-
(2007)
WSEAS Transactions on Systems
, vol.6
, Issue.11
, pp. 1319-1323
-
-
Chiu, Y.-S.P.1
Cheng, F.-T.2
Ting, C.-K.3
-
10
-
-
34247366300
-
Optimization problem for EMQ model with backlog level constraint
-
S.W. Chiu, Optimization problem for EMQ model with backlog level constraint. WSEAS Transactions on Information Science & Applications, Vol. 4 (4), 2007, pp.687-692.
-
(2007)
WSEAS Transactions on Information Science & Applications
, vol.4
, Issue.4
, pp. 687-692
-
-
Chiu, S.W.1
-
11
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P.A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, Vol. 12, 2001, pp. 584-590.
-
(2001)
Production Planning and Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
12
-
-
34247872840
-
Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
-
S.W. Chiu, Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry, Vol. 23, 2007, pp. 165-178.
-
(2007)
Applied Stochastic Models in Business and Industry
, vol.23
, pp. 165-178
-
-
Chiu, S.W.1
-
13
-
-
33645160232
-
A finite production model with random defective rate and shortages allowed and backordered
-
Y-S.P. Chiu and S.W. Chiu, A finite production model with random defective rate and shortages allowed and backordered. Journal of Information & Optimization Sciences, Vol. 24, 2003, pp.553-567.
-
(2003)
Journal of Information & Optimization Sciences
, vol.24
, pp. 553-567
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
-
14
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
S.W. Chiu and Y-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific & Industrial Research, Vol. 65, No. 6, 2006, pp.499-506.
-
(2006)
Journal of Scientific & Industrial Research
, vol.65
, Issue.6
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
15
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, Vol. 35(4), 2003, pp.427-437.
-
(2003)
Engineering Optimization
, vol.35
, Issue.4
, pp. 427-437
-
-
Chiu, Y.P.1
-
16
-
-
33645163509
-
-
Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, 2006 (Article ID 98502), 13 pages (doi:10.1155/MPE/2006/98502).
-
Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, Vol. 2006 (Article ID 98502), 13 pages (doi:10.1155/MPE/2006/98502).
-
-
-
-
17
-
-
48849090173
-
Effect of shortage level constraint on finite production rate model with rework
-
Y-S.P. Chiu, S.W. Chiu, and H-C. Chao, Effect of shortage level constraint on finite production rate model with rework. Journal of Scientific & Industrial Research, Vol. 67 (2), 2008, pp.112-116.
-
(2008)
Journal of Scientific & Industrial Research
, vol.67
, Issue.2
, pp. 112-116
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Chao, H.-C.3
-
18
-
-
0032187128
-
Inventory management under random supply disruptions and partial backorders
-
A. Arreola-Risa and GA. DeCroix, Inventory management under random supply disruptions and partial backorders. Naval Research Logistics, Vol. 45, 1998, pp. 687-703.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 687-703
-
-
Arreola-Risa, A.1
DeCroix, G.A.2
-
19
-
-
0027927229
-
Production-inventory systems with unreliable machines
-
M. Berg, M.J.M. Posner and H. Zhao, Production-inventory systems with unreliable machines. Operations Research, Vol. 42, 1994, pp.111-118.
-
(1994)
Operations Research
, vol.42
, pp. 111-118
-
-
Berg, M.1
Posner, M.J.M.2
Zhao, H.3
-
20
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
S.W. Chiu, S.L. Wang and Y-S.P. Chiu, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, Vol. 180, 2007, pp.664-676.
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.L.2
Chiu, Y.-S.P.3
-
21
-
-
0037954442
-
Approximations to production lot sizing with machine breakdowns
-
K.J. Chung, Approximations to production lot sizing with machine breakdowns. Computers and Operations Research, Vol. 30, 2004, pp. 1499-1507.
-
(2004)
Computers and Operations Research
, vol.30
, pp. 1499-1507
-
-
Chung, K.J.1
-
22
-
-
0026454137
-
Production lot sizing with machine breakdowns
-
H. Groenevelt, L. Pintelon and A. Seidmann, Production lot sizing with machine breakdowns. Management Science, Vol. 38, 1992, pp.104-123.
-
(1992)
Management Science
, vol.38
, pp. 104-123
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
23
-
-
0031141332
-
An extended EMQ model for a failure prone machine with general lifetime distribution
-
C.H. Kim and Y Hong, An extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics, Vol. 49, 1997, pp.215-223.
-
(1997)
International Journal of Production Economics
, vol.49
, pp. 215-223
-
-
Kim, C.H.1
Hong, Y.2
-
24
-
-
23144434063
-
A dynamic lot sizing model with exponential machine breakdowns
-
H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns. European Journal of Operational Research, Vol. 100, 1997, pp.514-536.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 514-536
-
-
Kuhn, H.1
-
25
-
-
0031699435
-
An EMQ model with inspections and random machine failures
-
V. Makis and J. Fung, An EMQ model with inspections and random machine failures. Journal of Operational Research Society, Vol. 49, 1998, pp. 66-76.
-
(1998)
Journal of Operational Research Society
, vol.49
, pp. 66-76
-
-
Makis, V.1
Fung, J.2
-
26
-
-
17644387571
-
Exact formulation of stochastic EMQ model for an unreliable production system
-
B.C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system. Journal of the Operational Research Society, Vol. 56, No. 5, 2005, pp.563-575.
-
(2005)
Journal of the Operational Research Society
, vol.56
, Issue.5
, pp. 563-575
-
-
Giri, B.C.1
Dohi, T.2
-
27
-
-
0039029278
-
The impact of imperfect processes on production run times
-
T. Boone, R. Ganeshan, Y. Guo, and J.K. Ord, The impact of imperfect processes on production run times. Decision Sciences, Vol. 31(4), 2000, pp.773-785.
-
(2000)
Decision Sciences
, vol.31
, Issue.4
, pp. 773-785
-
-
Boone, T.1
Ganeshan, R.2
Guo, Y.3
Ord, J.K.4
-
28
-
-
30344488182
-
Economic lot sizing for an imperfect production system subject to random breakdowns
-
G.C. Lin and D.E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns. Engineering Optimization, Vol. 38(1), 2006, pp.73-92.
-
(2006)
Engineering Optimization
, vol.38
, Issue.1
, pp. 73-92
-
-
Lin, G.C.1
Kroll, D.E.2
-
29
-
-
0031169483
-
A simple approximation of the EMQ model with Poisson machine failures
-
N.E. Abboud, A simple approximation of the EMQ model with Poisson machine failures. Production Planning and Control, Vol. 8(4), 1997, pp.385-397.
-
(1997)
Production Planning and Control
, vol.8
, Issue.4
, pp. 385-397
-
-
Abboud, N.E.1
-
30
-
-
48849096362
-
Production run time problem with machine breakdowns under AR control policy and rework
-
S.W. Chiu, Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific & Industrial Research, Vol. 66 (12), 2007, pp.979-988.
-
(2007)
Journal of Scientific & Industrial Research
, vol.66
, Issue.12
, pp. 979-988
-
-
Chiu, S.W.1
-
31
-
-
46449088127
-
An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
-
DOI: 10.1002/asmb.699, in Press
-
S.W. Chiu, An optimization problem of manufacturing systems with stochastic machine breakdown and rework process. Applied Stochastic Models in Business and Industry, DOI: 10.1002/asmb.699, 2008, (in Press).
-
(2008)
Applied Stochastic Models in Business and Industry
-
-
Chiu, S.W.1
-
32
-
-
0032764917
-
Analysis of a production-inventory system with machine breakdowns and shutdowns
-
B. Liu and J. Cao, Analysis of a production-inventory system with machine breakdowns and shutdowns. Computers & Operations Research, Vol. 26, 1999, pp.73-91.
-
(1999)
Computers & Operations Research
, vol.26
, pp. 73-91
-
-
Liu, B.1
Cao, J.2
-
33
-
-
0004256022
-
-
International Edition, Prentice-Hall, Inc, New Jersey
-
R.L. Rardin, Optimization in Operations Research. International Edition, Prentice-Hall, Inc., New Jersey, 739-741, 1998.
-
(1998)
Optimization in Operations Research
, pp. 739-741
-
-
Rardin, R.L.1
-
35
-
-
0003398158
-
-
John Wiley & Sons, Inc, New York
-
E.A. Silver, D. F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling. John Wiley & Sons, Inc., New York, 1998.
-
(1998)
Inventory Management and Production Planning and Scheduling
-
-
Silver, E.A.1
Pyke, D.F.2
Peterson, R.3
-
36
-
-
34250899311
-
A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram
-
S.W. Chiu, C-C. Shih, and Y-S.P. Chiu, A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram. P I Mech Eng Part B: Journal of Engineering Manufacture, Vol. 221 (3), 2007, pp.489-497.
-
(2007)
P I Mech Eng Part B: Journal of Engineering Manufacture
, vol.221
, Issue.3
, pp. 489-497
-
-
Chiu, S.W.1
Shih, C.-C.2
Chiu, Y.-S.P.3
-
37
-
-
33748703640
-
Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
-
S.W. Chiu, Y-S.P. Chiu, and C-C. Shih, Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method. Journal of Scientific & Industrial Research, Vol. 65(9), 2006 pp.695-701.
-
(2006)
Journal of Scientific & Industrial Research
, vol.65
, Issue.9
, pp. 695-701
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
Shih, C.-C.3
|