메뉴 건너뛰기




Volumn 7, Issue 4, 2008, Pages 183-194

Manufacturing lot sizing with backordering, scrap, and random breakdown occurring in inventory-stacking period

Author keywords

Backordering; Inventory; Machine breakdown; Manufacturing systems; Optimization; Production lot size; Scrap

Indexed keywords

DISTRIBUTION OF GOODS; RANDOM PROCESSES;

EID: 48849109713     PISSN: 11092769     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (9)

References (37)
  • 2
    • 0037061529 scopus 로고    scopus 로고
    • The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
    • M. Ben-Daya, The economic production lot-sizing problem with imperfect production processes and imperfect maintenance, Int'l Journal of Production Economics, Vol. 76, 2002, pp.257-264.
    • (2002) Int'l Journal of Production Economics , vol.76 , pp. 257-264
    • Ben-Daya, M.1
  • 3
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction, Vol. 23, 1991, pp. 23-28.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 4
    • 0032683886 scopus 로고    scopus 로고
    • Optimal preventive maintenance in a production inventory system
    • T. K. Das, S. Sarkar, Optimal preventive maintenance in a production inventory system. IIE Transactions, Vol. 31, 1999, pp.537-551.
    • (1999) IIE Transactions , vol.31 , pp. 537-551
    • Das, T.K.1    Sarkar, S.2
  • 5
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • H. L. Lee and M. J. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, Vol. 33, 1987, pp. 1125-1136.
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 6
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in and EOQ model with random yield
    • X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in and EOQ model with random yield, IIE Transactions, Vol. 22, 1990, pp. 41-47.
    • (1990) IIE Transactions , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2
  • 7
    • 34347377629 scopus 로고    scopus 로고
    • Alternative approach for realistic lot-size problem with random scrap rate and backlogging
    • Y-S. Chiu, C-K. Ting, C-B. Cheng, and F-Y. Lin. Alternative approach for realistic lot-size problem with random scrap rate and backlogging. WSEAS Transactions on Mathematics, Vol. 6 (6), 2007, pp.736-740.
    • (2007) WSEAS Transactions on Mathematics , vol.6 , Issue.6 , pp. 736-740
    • Chiu, Y.-S.1    Ting, C.-K.2    Cheng, C.-B.3    Lin, F.-Y.4
  • 8
    • 33751564329 scopus 로고    scopus 로고
    • Constrained inventory allocation and its applications
    • P.G. Bradford, M.N. Katehakis. Constrained inventory allocation and its applications. WSEAS Transactions on Mathematics, Vol. 6 (2), 2007, pp.263-270.
    • (2007) WSEAS Transactions on Mathematics , vol.6 , Issue.2 , pp. 263-270
    • Bradford, P.G.1    Katehakis, M.N.2
  • 9
    • 38349101637 scopus 로고    scopus 로고
    • Algebraic methods for optimizing EPQ model with rework and scrap
    • Y-S.P. Chiu, F-T. Cheng, and C-K Ting, Algebraic methods for optimizing EPQ model with rework and scrap. WSEAS Transactions on Systems, Vol. 6 (11), 2007, pp.1319-1323.
    • (2007) WSEAS Transactions on Systems , vol.6 , Issue.11 , pp. 1319-1323
    • Chiu, Y.-S.P.1    Cheng, F.-T.2    Ting, C.-K.3
  • 10
    • 34247366300 scopus 로고    scopus 로고
    • Optimization problem for EMQ model with backlog level constraint
    • S.W. Chiu, Optimization problem for EMQ model with backlog level constraint. WSEAS Transactions on Information Science & Applications, Vol. 4 (4), 2007, pp.687-692.
    • (2007) WSEAS Transactions on Information Science & Applications , vol.4 , Issue.4 , pp. 687-692
    • Chiu, S.W.1
  • 11
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P.A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, Vol. 12, 2001, pp. 584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 12
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • S.W. Chiu, Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Applied Stochastic Models in Business and Industry, Vol. 23, 2007, pp. 165-178.
    • (2007) Applied Stochastic Models in Business and Industry , vol.23 , pp. 165-178
    • Chiu, S.W.1
  • 13
    • 33645160232 scopus 로고    scopus 로고
    • A finite production model with random defective rate and shortages allowed and backordered
    • Y-S.P. Chiu and S.W. Chiu, A finite production model with random defective rate and shortages allowed and backordered. Journal of Information & Optimization Sciences, Vol. 24, 2003, pp.553-567.
    • (2003) Journal of Information & Optimization Sciences , vol.24 , pp. 553-567
    • Chiu, Y.-S.P.1    Chiu, S.W.2
  • 14
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • S.W. Chiu and Y-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific & Industrial Research, Vol. 65, No. 6, 2006, pp.499-506.
    • (2006) Journal of Scientific & Industrial Research , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 15
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, Vol. 35(4), 2003, pp.427-437.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.P.1
  • 16
    • 33645163509 scopus 로고    scopus 로고
    • Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, 2006 (Article ID 98502), 13 pages (doi:10.1155/MPE/2006/98502).
    • Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, Vol. 2006 (Article ID 98502), 13 pages (doi:10.1155/MPE/2006/98502).
  • 17
    • 48849090173 scopus 로고    scopus 로고
    • Effect of shortage level constraint on finite production rate model with rework
    • Y-S.P. Chiu, S.W. Chiu, and H-C. Chao, Effect of shortage level constraint on finite production rate model with rework. Journal of Scientific & Industrial Research, Vol. 67 (2), 2008, pp.112-116.
    • (2008) Journal of Scientific & Industrial Research , vol.67 , Issue.2 , pp. 112-116
    • Chiu, Y.-S.P.1    Chiu, S.W.2    Chao, H.-C.3
  • 18
    • 0032187128 scopus 로고    scopus 로고
    • Inventory management under random supply disruptions and partial backorders
    • A. Arreola-Risa and GA. DeCroix, Inventory management under random supply disruptions and partial backorders. Naval Research Logistics, Vol. 45, 1998, pp. 687-703.
    • (1998) Naval Research Logistics , vol.45 , pp. 687-703
    • Arreola-Risa, A.1    DeCroix, G.A.2
  • 19
    • 0027927229 scopus 로고
    • Production-inventory systems with unreliable machines
    • M. Berg, M.J.M. Posner and H. Zhao, Production-inventory systems with unreliable machines. Operations Research, Vol. 42, 1994, pp.111-118.
    • (1994) Operations Research , vol.42 , pp. 111-118
    • Berg, M.1    Posner, M.J.M.2    Zhao, H.3
  • 20
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • S.W. Chiu, S.L. Wang and Y-S.P. Chiu, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, Vol. 180, 2007, pp.664-676.
    • (2007) European Journal of Operational Research , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.-S.P.3
  • 21
    • 0037954442 scopus 로고    scopus 로고
    • Approximations to production lot sizing with machine breakdowns
    • K.J. Chung, Approximations to production lot sizing with machine breakdowns. Computers and Operations Research, Vol. 30, 2004, pp. 1499-1507.
    • (2004) Computers and Operations Research , vol.30 , pp. 1499-1507
    • Chung, K.J.1
  • 22
  • 23
    • 0031141332 scopus 로고    scopus 로고
    • An extended EMQ model for a failure prone machine with general lifetime distribution
    • C.H. Kim and Y Hong, An extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics, Vol. 49, 1997, pp.215-223.
    • (1997) International Journal of Production Economics , vol.49 , pp. 215-223
    • Kim, C.H.1    Hong, Y.2
  • 24
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns. European Journal of Operational Research, Vol. 100, 1997, pp.514-536.
    • (1997) European Journal of Operational Research , vol.100 , pp. 514-536
    • Kuhn, H.1
  • 25
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inspections and random machine failures
    • V. Makis and J. Fung, An EMQ model with inspections and random machine failures. Journal of Operational Research Society, Vol. 49, 1998, pp. 66-76.
    • (1998) Journal of Operational Research Society , vol.49 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 26
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • B.C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system. Journal of the Operational Research Society, Vol. 56, No. 5, 2005, pp.563-575.
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.5 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 27
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • T. Boone, R. Ganeshan, Y. Guo, and J.K. Ord, The impact of imperfect processes on production run times. Decision Sciences, Vol. 31(4), 2000, pp.773-785.
    • (2000) Decision Sciences , vol.31 , Issue.4 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 28
    • 30344488182 scopus 로고    scopus 로고
    • Economic lot sizing for an imperfect production system subject to random breakdowns
    • G.C. Lin and D.E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns. Engineering Optimization, Vol. 38(1), 2006, pp.73-92.
    • (2006) Engineering Optimization , vol.38 , Issue.1 , pp. 73-92
    • Lin, G.C.1    Kroll, D.E.2
  • 29
    • 0031169483 scopus 로고    scopus 로고
    • A simple approximation of the EMQ model with Poisson machine failures
    • N.E. Abboud, A simple approximation of the EMQ model with Poisson machine failures. Production Planning and Control, Vol. 8(4), 1997, pp.385-397.
    • (1997) Production Planning and Control , vol.8 , Issue.4 , pp. 385-397
    • Abboud, N.E.1
  • 30
    • 48849096362 scopus 로고    scopus 로고
    • Production run time problem with machine breakdowns under AR control policy and rework
    • S.W. Chiu, Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific & Industrial Research, Vol. 66 (12), 2007, pp.979-988.
    • (2007) Journal of Scientific & Industrial Research , vol.66 , Issue.12 , pp. 979-988
    • Chiu, S.W.1
  • 31
    • 46449088127 scopus 로고    scopus 로고
    • An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
    • DOI: 10.1002/asmb.699, in Press
    • S.W. Chiu, An optimization problem of manufacturing systems with stochastic machine breakdown and rework process. Applied Stochastic Models in Business and Industry, DOI: 10.1002/asmb.699, 2008, (in Press).
    • (2008) Applied Stochastic Models in Business and Industry
    • Chiu, S.W.1
  • 32
    • 0032764917 scopus 로고    scopus 로고
    • Analysis of a production-inventory system with machine breakdowns and shutdowns
    • B. Liu and J. Cao, Analysis of a production-inventory system with machine breakdowns and shutdowns. Computers & Operations Research, Vol. 26, 1999, pp.73-91.
    • (1999) Computers & Operations Research , vol.26 , pp. 73-91
    • Liu, B.1    Cao, J.2
  • 33
    • 0004256022 scopus 로고    scopus 로고
    • International Edition, Prentice-Hall, Inc, New Jersey
    • R.L. Rardin, Optimization in Operations Research. International Edition, Prentice-Hall, Inc., New Jersey, 739-741, 1998.
    • (1998) Optimization in Operations Research , pp. 739-741
    • Rardin, R.L.1
  • 36
    • 34250899311 scopus 로고    scopus 로고
    • A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram
    • S.W. Chiu, C-C. Shih, and Y-S.P. Chiu, A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram. P I Mech Eng Part B: Journal of Engineering Manufacture, Vol. 221 (3), 2007, pp.489-497.
    • (2007) P I Mech Eng Part B: Journal of Engineering Manufacture , vol.221 , Issue.3 , pp. 489-497
    • Chiu, S.W.1    Shih, C.-C.2    Chiu, Y.-S.P.3
  • 37
    • 33748703640 scopus 로고    scopus 로고
    • Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
    • S.W. Chiu, Y-S.P. Chiu, and C-C. Shih, Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method. Journal of Scientific & Industrial Research, Vol. 65(9), 2006 pp.695-701.
    • (2006) Journal of Scientific & Industrial Research , vol.65 , Issue.9 , pp. 695-701
    • Chiu, S.W.1    Chiu, Y.-S.P.2    Shih, C.-C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.