-
1
-
-
0000273410
-
Capital productivity: Major challenge for the semiconductor industry
-
P. Silverman, "Capital productivity: Major challenge for the semiconductor industry," Solid State Technol., vol.37, no.3, p. 104, 1994.
-
(1994)
Solid State Technol
, vol.37
, Issue.3
, pp. 104
-
-
Silverman, P.1
-
2
-
-
0031382160
-
The operating curve: A method to measure and benchmark manufacturing line productivity
-
Sep. 10-12
-
S. S. Aurand and P. J. Miller, "The operating curve: A method to measure and benchmark manufacturing line productivity," in Proc. IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf. Workshop, Sep. 10-12, 1997, pp. 391-397.
-
(1997)
Proc. IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf. Workshop
, pp. 391-397
-
-
Aurand, S.S.1
Miller, P.J.2
-
3
-
-
0033750593
-
Quantifying the benefits of cycle-time reduction in semiconductor wafer fabrication
-
Jan.
-
K. Nemoto, E. Akcali, and R. Uzsoy, "Quantifying the benefits of cycle-time reduction in semiconductor wafer fabrication," IEEE Trans. Electron. Packag. Manuf., vol.23, no.1, pp. 39-47, Jan. 2000.
-
(2000)
IEEE Trans. Electron. Packag. Manuf.
, vol.23
, Issue.1
, pp. 39-47
-
-
Nemoto, K.1
Akcali, E.2
Uzsoy, R.3
-
5
-
-
33846902258
-
Integration of speed economics into decision-making for manufacturing management
-
R. C. Leachman and S. Ding, "Integration of speed economics into decision-making for manufacturing management," Int. J. Prod. Econ., pp. 39-55, 2007.
-
(2007)
Int. J. Prod. Econ.
, pp. 39-55
-
-
Leachman, R.C.1
Ding, S.2
-
6
-
-
34250195301
-
Production planning with load dependent lead times: An update of research
-
J. Pahl, D. Woodruff, and S. Voß, "Production planning with load dependent lead times: An update of research," Ann. Oper. Res., vol.153, pp. 297-345, 2007.
-
(2007)
Ann. Oper. Res.
, vol.153
, pp. 297-345
-
-
Pahl, J.1
Woodruff, D.2
Voß, S.3
-
7
-
-
0004253213
-
-
2nd ed. New York: Mc- Graw-Hill/Irwin Apr. 4
-
W. Hopp and M. Spearman, Factory Physics, 2nd ed. New York: Mc- Graw-Hill/Irwin, Apr. 4, 2000.
-
(2000)
Factory Physics
-
-
Hopp, W.1
Spearman, M.2
-
11
-
-
49149083932
-
Characterizing the operating curve-How can semiconductor fabs grade themselves?
-
Oct.
-
A. Fayed and B. Dunnigan, "Characterizing the operating curve-How can semiconductor fabs grade themselves?," in Proc. ISSM, Oct. 2007, pp. 289-292.
-
(2007)
Proc. ISSM
, pp. 289-292
-
-
Fayed, A.1
Dunnigan, B.2
-
12
-
-
49149110148
-
Optimizing the operating curve: How can every fab maximize its performance?
-
Boston, MA, May
-
A. Fayed and C. M.Weber, "Optimizing the operating curve: How can every fab maximize its performance?," in Proc. IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf., Boston, MA, May 4-6, 2008, pp. 286-291.
-
(2008)
Proc. IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf.
, vol.4-6
, pp. 286-291
-
-
Fayed, A.1
Weber, C.M.2
-
13
-
-
3843113981
-
Break-even analysis for lockheed's tri star: An application of financial theory
-
Sep.
-
U. E. Reinhardt, "Break-even analysis for lockheed's tri star: An application of financial theory," J. Finance, vol.28, no.4, pp. 821-838, Sep. 1973.
-
(1973)
J. Finance
, vol.28
, Issue.4
, pp. 821-838
-
-
Reinhardt, U.E.1
-
14
-
-
9144249190
-
Yield learning and the sources of profitability in semiconductor manufacturing and process development
-
Nov.
-
C. Weber, "Yield learning and the sources of profitability in semiconductor manufacturing and process development," IEEE Trans. Semicond. Manuf., vol.17, no.4, pp. 590-596, Nov. 2004.
-
(2004)
IEEE Trans. Semicond. Manuf.
, vol.17
, Issue.4
, pp. 590-596
-
-
Weber, C.1
-
15
-
-
28444461369
-
A simulation-based evaluation of the cost of cycle time reduction in Agere systems wafer fabrication facility-A case study
-
D. Nazzal, M. Mollaghasemi, and D. Anderson, "A simulation-based evaluation of the cost of cycle time reduction in Agere systems wafer fabrication facility-A case study," Int. J. Prod. Econ., pp. 300-313, 2006.
-
(2006)
Int. J. Prod. Econ.
, pp. 300-313
-
-
Nazzal, D.1
Mollaghasemi, M.2
Anderson, D.3
-
16
-
-
0033716420
-
Behind the learning curve: Linking learning activities to waste reduction
-
M. A. Lapré, A. S. Mukherjee, and L. N. Van Wassenhove, "Behind the learning curve: Linking learning activities to waste reduction," Manage. Sci., vol.46, no.5, pp. 597-611, 2000.
-
(2000)
Manage. Sci.
, vol.46
, Issue.5
, pp. 597-611
-
-
Lapré, M.A.1
Mukherjee, A.S.2
Van Wassenhove, L.N.3
-
17
-
-
0029207742
-
Noise and learning in semiconductor manufacturing
-
R. E. Bohn, "Noise and learning in semiconductor manufacturing," Manage. Sci., vol.41, no.1, pp. 31-42, 1995.
-
(1995)
Manage. Sci.
, vol.41
, Issue.1
, pp. 31-42
-
-
Bohn, R.E.1
-
18
-
-
0026417870
-
Designing an optimal production system with inspection
-
C. S. Tang, "Designing an optimal production system with inspection," Eur. J. Oper. Res., vol.52, pp. 45-54, 1991.
-
(1991)
Eur. J. Oper. Res.
, vol.52
, pp. 45-54
-
-
Tang, C.S.1
-
19
-
-
0001068236
-
Random yield, rework and scrap in a multistage batch manufacturing environment
-
L. M. Wein, "Random yield, rework and scrap in a multistage batch manufacturing environment," Oper. Res., vol.40, pp. 551-563, 1992.
-
(1992)
Oper. Res.
, vol.40
, pp. 551-563
-
-
Wein, L.M.1
-
20
-
-
0032119072
-
Toward a theory of continuous improvement
-
W. I. Zangwill and P. B. Kantor, "Toward a theory of continuous improvement," Manage. Sci., vol.44, no.7, pp. 910-920, 1998.
-
(1998)
Manage. Sci.
, vol.44
, Issue.7
, pp. 910-920
-
-
Zangwill, W.I.1
Kantor, P.B.2
-
21
-
-
33144460387
-
Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
-
Feb.
-
J. M. Asmundsson, R. L. Rardin, and R. Uzsoy, "Tractable nonlinear production planning models for semiconductor wafer fabrication facilities," IEEE Trans. Semicond. Manuf., vol.19, no.1, pp. 95-111, Feb. 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.1
, pp. 95-111
-
-
Asmundsson, J.M.1
Rardin, R.L.2
Uzsoy, R.3
-
22
-
-
0002439131
-
Time and transition in work teams: Toward a new model of group development
-
C. J. G. Gersick, "Time and transition in work teams: Toward a new model of group development," Acad. Manage. J., vol.31, no.1, pp. 9-41, 1988.
-
(1988)
Acad. Manage. J.
, vol.31
, Issue.1
, pp. 9-41
-
-
Gersick, C.J.G.1
-
23
-
-
0033284013
-
The economics of yield-driven processes
-
R. E. Bohn and C. Terwiesch, "The economics of yield-driven processes," J. Oper. Manage., vol.18, no.1, pp. 41-59, 1999.
-
(1999)
J. Oper. Manage.
, vol.18
, Issue.1
, pp. 41-59
-
-
Bohn, R.E.1
Terwiesch, C.2
-
24
-
-
0038180890
-
Cycle time reduction at a major Texas Instruments wafer fab
-
Mar. 31-Apr. 1
-
K. Potti and M. Whitaker, "Cycle time reduction at a major Texas Instruments wafer fab," in IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf., Mar. 31-Apr. 1 2003, pp. 106-110.
-
(2003)
IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf.
, pp. 106-110
-
-
Potti, K.1
Whitaker, M.2
-
25
-
-
33646215691
-
-
Ph.D. dissertation, Sloan School of Management, Massachusetts Inst. of Technology Cambridge, Jun.
-
C. Weber, "Rapid learning in high-velocity environments," Ph.D. dissertation, Sloan School of Management, Massachusetts Inst. of Technology, Cambridge, Jun. 2003.
-
(2003)
Rapid Learning in High-velocity Environments
-
-
Weber, C.1
-
26
-
-
70350238112
-
Managing the challenges of multi-product manufacturing
-
Berlin, Germany, May 11
-
C. M.Weber and A. Fayed, "Managing the challenges of multi-product manufacturing," in IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf., Berlin, Germany, May 11, 2009.
-
(2009)
IEEE/SEMI-ASMC Adv. Semicond. Manuf. Conf.
-
-
Weber, C.M.1
Fayed, A.2
-
27
-
-
0035283518
-
Learning and process improvement during production ramp-up
-
C. Terwiesch and R. E. Bohn, "Learning and process improvement during production ramp-up," Int. J. Prod. Econ., vol.70, no.1, pp. 1-19, 2001.
-
(2001)
Int. J. Prod. Econ.
, vol.70
, Issue.1
, pp. 11-19
-
-
Terwiesch, C.1
Bohn, R.E.2
-
28
-
-
84948193503
-
Differentiation and integration in complex organizations
-
Jun. 1967
-
P. Lawrence and J. Lorsch, "Differentiation and integration in complex organizations," Admin. Sci. Quart., vol.12, no.1, pp. 1-47, Jun. 1967, 1967.
-
(1967)
Admin. Sci. Quart.
, vol.12
, Issue.1
, pp. 41-47
-
-
Lawrence, P.1
Lorsch, J.2
-
29
-
-
76849114222
-
The economics of speed
-
presented at Portland State Univ., Portland, OR, Nov. 3
-
R. C. Leachman, "The economics of speed," presented at theETM seminar, Portland State Univ., Portland, OR, Nov. 3, 2005.
-
(2005)
The ETM Seminar
-
-
Leachman, R.C.1
-
30
-
-
0036568118
-
SeDFAM: Semiconductor demand forecast accuracy model
-
Nov.
-
M. Çakanyildirim and R. O. Roundy, "SeDFAM: Semiconductor demand forecast accuracy model," IIE Trans., vol.34, no.5, pp. 449-465, Nov. 2002.
-
(2002)
IIE Trans
, vol.34
, Issue.5
, pp. 449-465
-
-
Çakanyildirim, M.1
Roundy, R.O.2
|