-
2
-
-
0002907360
-
A branch-and-bound procedure for the resource constrained project scheduling problem
-
Demeulemeester, E., & Herroelen, W. (1992). A branch-and-bound procedure for the resource constrained project scheduling problem. Management Science, 38, 1803-1818.
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
3
-
-
0030122629
-
An efficient optimal solution procedure for resource constrained project scheduling problem
-
Demeulemeester, E., & Herroelen, W. (1996). An efficient optimal solution procedure for resource constrained project scheduling problem. European Journal of Operational Research, 90, 334-348.
-
(1996)
European Journal of Operational Research
, vol.90
, pp. 334-348
-
-
Demeulemeester, E.1
Herroelen, W.2
-
4
-
-
0003011391
-
A promising genetic algorithm approach to job-shop scheduling, rescheduling, and open-shop scheduling problems
-
Morgan Kaufman
-
Fang, H. L., Ross, P., & Corne, D. (1993). A promising genetic algorithm approach to job-shop scheduling, rescheduling, and open-shop scheduling problems. Proceedings on the 5th international conference on genetic algorithms. Morgan Kaufman.
-
(1993)
Proceedings on the 5th International Conference on Genetic Algorithms
-
-
Fang, H.L.1
Ross, P.2
Corne, D.3
-
7
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann, S. (1998). A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 45:733-750.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
8
-
-
0002030301
-
Heuristic algorithms for solving the resource constrained project scheduling problem: Classification and computational analysis
-
ed. by Weglarz. Kluwer
-
Kolisch R., S. Hartmann (1998). Heuristic algorithms for solving the resource constrained project scheduling problem: classification and computational analysis. Handbook on Recent Advances in Project Scheduling, ed. by Weglarz, 197-212. Kluwer.
-
(1998)
Handbook on Recent Advances in Project Scheduling
, pp. 197-212
-
-
Kolisch, R.1
Hartmann, S.2
-
9
-
-
0033312040
-
A GA-based multicriteria optimal model for construction scheduling
-
ASCE
-
Leu, S., & Yang, C. (1999). A GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, ASCE, 125(6), 420-427.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
10
-
-
0039542879
-
Solving the RCPSP efficiently at modest memory requirements
-
Kiel, Germany: University of Kiel
-
Sprecher, A. (1996). Solving the RCPSP efficiently at modest memory requirements. Manuskripte aus den Insituten fur Betreibswirtschaftslehre. No. 425. Kiel, Germany: University of Kiel.
-
(1996)
Manuskripte aus den Insituten fur Betreibswirtschaftslehre
, vol.425
-
-
Sprecher, A.1
-
11
-
-
0002819121
-
A comparative analysis of selection schemes used in genetic algorithms
-
Goldberg, D. E., Deb, K. (1991). A comparative analysis of selection schemes used in genetic algorithms. Foundations of Genetic Algorithms, 69-93.
-
(1991)
Foundations of Genetic Algorithms
, pp. 69-93
-
-
Goldberg, D.E.1
Deb, K.2
-
13
-
-
0032676409
-
Scheduling to minimize product design time using a genetic algorithm
-
F. S. C. Lam, B. C. Lin, C. Sriskandarajah, H. Van (1999). Scheduling to minimize product design time using a genetic algorithm. International Journal of Production Research. 37(6), 1369-1386
-
(1999)
International Journal of Production Research.
, vol.37
, Issue.6
, pp. 1369-1386
-
-
Lam, F.S.C.1
Lin, B.C.2
Sriskandarajah, C.3
Van, H.4
-
14
-
-
0034230027
-
Multi-product planning and scheduling using Genetic Algorithm approach
-
W. H. Ip, Y. Li, K. F. Man, K. S. Tang (2000). Multi-product planning and scheduling using Genetic Algorithm approach. Computer & Industrial Engineering. 38, 283-296
-
(2000)
Computer & Industrial Engineering.
, vol.38
, pp. 283-296
-
-
Ip, W.H.1
Li, Y.2
Man, K.F.3
Tang, K.S.4
-
15
-
-
0141636312
-
The development of genetic algorithms for the capacity scheduling of complex products, with multiple levels of product structure
-
P. Pongcharoen, C. Hicks, P. M. Braiden (2004). The development of genetic algorithms for the capacity scheduling of complex products, with multiple levels of product structure. European Journal of Operational Research. 152, 215-225.
-
(2004)
European Journal of Operational Research.
, vol.152
, pp. 215-225
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
-
16
-
-
0012889212
-
An integrated survey of project scheduling
-
Manuskripte aus den Instituten f'ur Betriebswirtschaftslehre der Universit''at Kiel
-
Kolisch R., and R. Padman 1997. An integrated survey of project scheduling. Technical Report 463, Manuskripte aus den Instituten f'ur Betriebswirtschaftslehre der Universit''at Kiel.
-
(1997)
Technical Report
, vol.463
-
-
Kolisch, R.1
Padman, R.2
-
18
-
-
0028368259
-
Genetic algorithms crossover operators for ordering applications
-
Poon, P. W., and Carter, J. N. (1995). "Genetic algorithms crossover operators for ordering applications." Comp. Ops. Res., 22(1), 135-147.
-
(1995)
Comp. Ops. Res.
, vol.22
, Issue.1
, pp. 135-147
-
-
Poon, P.W.1
Carter, J.N.2
-
20
-
-
0242332693
-
Four complex problems in concurrent engineering and the design structure matrix method
-
Yassine, A. and Braha, D. (2003). Four Complex Problems in Concurrent Engineering and the Design Structure Matrix Method. Concurrent Engineering Research & Applications, 11(3).
-
(2003)
Concurrent Engineering Research & Applications
, vol.11
, Issue.3
-
-
Yassine, A.1
Braha, D.2
-
21
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
Kurtulus, I. and Davis, E.W. (1982). Multi-Project Scheduling: Categorization of Heuristic Rules Performance. Management Science, 28(2), 161-172.
-
(1982)
Management Science
, vol.28
, Issue.2
, pp. 161-172
-
-
Kurtulus, I.1
Davis, E.W.2
|