메뉴 건너뛰기




Volumn 36, Issue 10, 2009, Pages 12143-12150

Gene expression programming based due date assignment in a simulated job shop

Author keywords

Due date assignment; Flowtime estimation; Gene expression programming; Simulation

Indexed keywords

DUE DATE ASSIGNMENT; FLOWTIME ESTIMATION; GENE EXPRESSION PROGRAMMING; GENETIC PROGRAMMING TECHNIQUE; JOB SHOP; MEAN PERCENT ERROR; MEAN TARDINESS; MULTI-STAGE; NEW APPROACHES; NEW MEMBERS; PERFORMANCE MEASUREMENTS; PRIMARY OBJECTIVE; SIMULATION; SIMULATION EXPERIMENTS; SIMULATION MODEL; TEST CONDITION;

EID: 69249223037     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2009.03.061     Document Type: Article
Times cited : (21)

References (31)
  • 2
    • 0021496929 scopus 로고
    • Sequencing rules and due date assignments in a job shop
    • Baker K.R. Sequencing rules and due date assignments in a job shop. Management Science 30 9 (1984) 1093-1104
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 3
    • 0003067640 scopus 로고
    • An investigation of due date assignment rules with constrained tightness
    • Baker K.R., and Bertrand J.M.W. An investigation of due date assignment rules with constrained tightness. Journal of Operations Management 1 3 (1981) 109-120
    • (1981) Journal of Operations Management , vol.1 , Issue.3 , pp. 109-120
    • Baker, K.R.1    Bertrand, J.M.W.2
  • 5
    • 69249216970 scopus 로고    scopus 로고
    • Baykasoǧlu, A., & Göçken, M. (2007). Simulation based due date assignment via gene expression programming. In M. J. Geiger, W. Habenicht (Eds.), Proceedings of EU/ME 2007. metaheuristics in the service industry, 8th workshop of the EURO working group EU/ME, the European chapter on metaheuristics, Stuttgart, Germany. (pp. 23-30).
    • Baykasoǧlu, A., & Göçken, M. (2007). Simulation based due date assignment via gene expression programming. In M. J. Geiger, W. Habenicht (Eds.), Proceedings of EU/ME 2007. "metaheuristics in the service industry", 8th workshop of the EURO working group "EU/ME, the European chapter on metaheuristics", Stuttgart, Germany. (pp. 23-30).
  • 8
    • 0031098116 scopus 로고    scopus 로고
    • Heuristics for dynamic job shop scheduling with real-time updated queuing time estimates
    • Chang E.C.R. Heuristics for dynamic job shop scheduling with real-time updated queuing time estimates. International Journal of Production Research 35 (1997) 661-665
    • (1997) International Journal of Production Research , vol.35 , pp. 661-665
    • Chang, E.C.R.1
  • 9
    • 0023436606 scopus 로고
    • An algorithm for the CON due date determination and sequencing problem
    • Cheng T.C.E. An algorithm for the CON due date determination and sequencing problem. Computer and Operations Research 14 6 (1987) 537-542
    • (1987) Computer and Operations Research , vol.14 , Issue.6 , pp. 537-542
    • Cheng, T.C.E.1
  • 10
    • 0032041372 scopus 로고    scopus 로고
    • Job shop scheduling for missed due date performance
    • Cheng T.C.E., and Jiang J. Job shop scheduling for missed due date performance. Computes and Industrial Engineering 34 2 (1998) 297-307
    • (1998) Computes and Industrial Engineering , vol.34 , Issue.2 , pp. 297-307
    • Cheng, T.C.E.1    Jiang, J.2
  • 11
    • 0041732089 scopus 로고    scopus 로고
    • A case-based expert support system for due date assignment in a wafer fabrication factory
    • Chiu C., Chang P.C., and Chiu N.H. A case-based expert support system for due date assignment in a wafer fabrication factory. Journal of Intelligent Manufacturing 14 (2003) 287-329
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 287-329
    • Chiu, C.1    Chang, P.C.2    Chiu, N.H.3
  • 12
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • Conway R.W. Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering 16 (1965) 228-237
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 14
    • 0027657253 scopus 로고
    • Job shop flowtime prediction and tardiness control using queuing analysis
    • Enns S.T. Job shop flowtime prediction and tardiness control using queuing analysis. International Journal of Production Research 31 9 (1993) 2045-2057
    • (1993) International Journal of Production Research , vol.31 , Issue.9 , pp. 2045-2057
    • Enns, S.T.1
  • 15
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness
    • Enns S.T. A dynamic forecasting model for job shop flowtime prediction and tardiness. International Journal of Production Research 33 5 (1995) 1295-1312
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 16
    • 0347499408 scopus 로고    scopus 로고
    • Gene expression programming: A new adaptive algorithm for solving problems
    • Ferreira C. Gene expression programming: A new adaptive algorithm for solving problems. Complex Systems 13 (2001) 87-129
    • (2001) Complex Systems , vol.13 , pp. 87-129
    • Ferreira, C.1
  • 18
    • 56349099276 scopus 로고    scopus 로고
    • Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory
    • Kuo T.-C., Chang S.-H., and Huang S.-N. Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory. Expert Systems with Applications 36 2P1 (2009) 1783-1792
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 PART 1 , pp. 1783-1792
    • Kuo, T.-C.1    Chang, S.-H.2    Huang, S.-N.3
  • 21
    • 0034630792 scopus 로고    scopus 로고
    • The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs
    • Philipoom P.R. The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs. International Journal of Production Research 38 7 (2000) 1641-1655
    • (2000) International Journal of Production Research , vol.38 , Issue.7 , pp. 1641-1655
    • Philipoom, P.R.1
  • 22
  • 24
    • 0000482128 scopus 로고
    • Due-date setting methodologies based on simulated annealing - An experimental study in a real-life job shop
    • Raghu T.S., and Rajendran C. Due-date setting methodologies based on simulated annealing - An experimental study in a real-life job shop. International Journal of Production Research 33 9 (1995) 2535-2554
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2535-2554
    • Raghu, T.S.1    Rajendran, C.2
  • 25
    • 0036889382 scopus 로고    scopus 로고
    • Operation based flow time estimation in a dynamic job shop
    • Sabuncuoglu I., and Comlekci A. Operation based flow time estimation in a dynamic job shop. Omega 30 6 (2002) 423-442
    • (2002) Omega , vol.30 , Issue.6 , pp. 423-442
    • Sabuncuoglu, I.1    Comlekci, A.2
  • 27
    • 33751501444 scopus 로고    scopus 로고
    • Development of regression-based method with case-based tuning to solve the due date assignment problem
    • Sha D.Y., Storch R.L., and Liu C.Y. Development of regression-based method with case-based tuning to solve the due date assignment problem. International Journal of Production Research 45 1 (2007) 65-82
    • (2007) International Journal of Production Research , vol.45 , Issue.1 , pp. 65-82
    • Sha, D.Y.1    Storch, R.L.2    Liu, C.Y.3
  • 28
    • 0028725846 scopus 로고
    • A simulation study of due-date assignment rules in a dynamic job shop
    • Udo G.J. A simulation study of due-date assignment rules in a dynamic job shop. Journal of Operational Research Society 45 12 (1994) 1425-1435
    • (1994) Journal of Operational Research Society , vol.45 , Issue.12 , pp. 1425-1435
    • Udo, G.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.