2
-
-
0029483936
-
A greedy algorithm to determine the number of transporters in a cyclic electroplating process
-
Armstrong, R., Gu, S., and Lei, L., 1995, A greedy algorithm to determine the number of transporters in a cyclic electroplating process. paper presented at the Conference on Emergencing Technologies and Factory Automation, ETFA '95, 10-13 October, Paris, 460-473.
-
(1995)
Conference on Emergencing Technologies and Factory Automation, ETFA '95, 10-13 October, Paris
, pp. 460-473
-
-
Armstrong, R.1
Gu, S.2
Lei, L.3
-
4
-
-
0010909785
-
A branch and bound procedure for the optimal layout of a saturated production line fed with a single hoist
-
Baptiste, P., Grunder, O. and Chappe, D., 1995, A branch and bound procedure for the optimal layout of a saturated production line fed with a single hoist. Paper presented at the International Conference on Industrial Engineering and Production Management, Marrakech, pp. 372-380.
-
(1995)
International Conference on Industrial Engineering and Production Management, Marrakech
, pp. 372-380
-
-
Baptiste, P.1
Grunder, O.2
Chappe, D.3
-
5
-
-
0010912036
-
A scheduling problem optimization solved with constraint logic programming
-
Baptiste, P., Legeard, B., Manier, M.-A. and Varnier, C., 1994, A scheduling problem optimization solved with constraint logic programming. Proceedings of the Practical Application of PROLOG, pp. 41-66.
-
(1994)
Proceedings of the Practical Application of PROLOG
, pp. 41-66
-
-
Baptiste, P.1
Legeard, B.2
Manier, M.-A.3
Varnier, C.4
-
6
-
-
0026976853
-
Hoist scheduling problem: An approach based on constraint logic programming
-
Baptiste, P., Legeard, B. and Varnier, C., 1992, Hoist Scheduling Problem: an approach based on constraint logic programming. IEEE International Conference on Robotics and Automation, Vol. 2, pp. 1139-1144.
-
(1992)
IEEE International Conference on Robotics and Automation
, vol.2
, pp. 1139-1144
-
-
Baptiste, P.1
Legeard, B.2
Varnier, C.3
-
7
-
-
38149147773
-
Vehicle scheduling in two-cycle flexible manufacturing systems
-
Blazewicz, J., Burkad, R. E., Finke, G., and Woeginger, G. J., 1994, Vehicle scheduling in two-cycle flexible manufacturing systems. Mathematical Computer Modelling, 20, 19-31.
-
(1994)
Mathematical Computer Modelling
, vol.20
, pp. 19-31
-
-
Blazewicz, J.1
Burkad, R.E.2
Finke, G.3
Woeginger, G.J.4
-
8
-
-
0002107964
-
Optimization of a programmable hoist using linear programming
-
Bracker, W. E., and Chapman, W., 1985, Optimization of a programmable hoist using linear programming. Printed Circuit Fabrication, 8, 39-42.
-
(1985)
Printed Circuit Fabrication
, vol.8
, pp. 39-42
-
-
Bracker, W.E.1
Chapman, W.2
-
9
-
-
0002317675
-
Sequencing tasks with exponential services times to minimize the expected flow time or makespan
-
Bruno, J., Downey, P. and Frederickson, G. N., 1981, Sequencing tasks with exponential services times to minimize the expected flow time or makespan. Journal of the Association for Computing Machinery, 28, 100-113.
-
(1981)
Journal of the Association for Computing Machinery
, vol.28
, pp. 100-113
-
-
Bruno, J.1
Downey, P.2
Frederickson, G.N.3
-
11
-
-
0001621836
-
Rough large deviation estimates for simulated annealing: Application to exponential schedules
-
Catoni, O., 1992, Rough large deviation estimates for simulated annealing: application to exponential schedules. Annals of Probability, 29, 1109-1146.
-
(1992)
Annals of Probability
, vol.29
, pp. 1109-1146
-
-
Catoni, O.1
-
12
-
-
0029427108
-
Couplage méthode d'ordonnancement-simulation pour l'ordonnancement de systémes industriels de traitement de surface
-
Caux, C., Fleury, G., Gourgand, M., and Kellert, P., 1995, Couplage méthode d'ordonnancement-simulation pour l'ordonnancement de systémes industriels de traitement de surface. Recherche Opérationelle/Operational Research (RAIRO), 29, 391-413.
-
(1995)
Recherche Opérationelle/Operational Research (RAIRO)
, vol.29
, pp. 391-413
-
-
Caux, C.1
Fleury, G.2
Gourgand, M.3
Kellert, P.4
-
14
-
-
0029543596
-
Cyclic hoist scheduling based on graph theory
-
Chen, H., Chu, C., and Proth, J.-M., 1995, Cyclic Hoist Scheduling based on graph theory. Paper presented at the Conference on Emergencing Technologies and Factory Automation, ETFA'95, 10-13 October, Paris, pp. 451-459.
-
(1995)
Conference on Emergencing Technologies and Factory Automation, ETFA'95, 10-13 October, Paris
, pp. 451-459
-
-
Chen, H.1
Chu, C.2
Proth, J.-M.3
-
15
-
-
0004113622
-
-
(Cambridge, MA: Addison-Wesley)
-
Conway, R. W., Maxwell, W. L., and Miller, L. W., 1967, Theory of Scheduling (Cambridge, MA: Addison-Wesley).
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
17
-
-
85018104842
-
Pareto simulated annealing - a metaheuristic technique for multiple-objective combinatorial optimization
-
Czyzak, P. and Jaszkiewicz, A., 1988, Pareto simulated annealing - a metaheuristic technique for multiple-objective combinatorial optimization. Journal of Multi-Criteria Decision Analysis, 7, 34-47.
-
(1988)
Journal of Multi-Criteria Decision Analysis
, vol.7
, pp. 34-47
-
-
Czyzak, P.1
Jaszkiewicz, A.2
-
18
-
-
0000131850
-
A taxonomy of discrete manufacturing systems
-
Dietrich, B. L., 1991, A taxonomy of discrete manufacturing systems. Operations Research, 39, 886-902.
-
(1991)
Operations Research
, vol.39
, pp. 886-902
-
-
Dietrich, B.L.1
-
19
-
-
0042996279
-
Méthodes stochastiques et déterministes pour les problémes NP-Difficiles
-
PhD thesis, Université Blaise Pascal, Clermont-Ferrand
-
Fleury, G., 1993, Méthodes stochastiques et déterministes pour les problémes NP-Difficiles. PhD thesis, Université Blaise Pascal, Clermont-Ferrand.
-
(1993)
-
-
Fleury, G.1
-
20
-
-
0010776912
-
Application de méthodes stochastiques inspirées du recuit simulé à des problémes d'ordonnancement
-
Fleury, G., 1995, Application de méthodes stochastiques inspirées du recuit simulé à des problémes d'ordonnancement. Journal Européen des Systémes Automatisés, 29, 445-470.
-
(1995)
Journal Européen des Systémes Automatisés
, vol.29
, pp. 445-470
-
-
Fleury, G.1
-
21
-
-
0002320625
-
A hoist scheduling problem, containing a fixed number of carriers, solved with an opportunistic approach
-
Fleury, G., Goujon, J.-Y., Gourgand, M. and Lacomme, P., 1996, A Hoist Scheduling Problem, containing a fixed number of carriers, solved with an opportunistic approach. Paper presented at the CESA'96 IMACS Multiconference on Computational Engineering in Systems Applications, Lille, pp. 473-478.
-
(1996)
CESA'96 IMACS Multiconference on Computational Engineering in Systems Applications, Lille
, pp. 473-478
-
-
Fleury, G.1
Goujon, J.-Y.2
Gourgand, M.3
Lacomme, P.4
-
22
-
-
0032682226
-
Multi-Agent approach and stochastic optimization: Random events in manufacturing systems
-
Fleury, G., Goujon, J.-Y., Gourgand, M. and Lacomme, P., 1999, Multi-Agent approach and stochastic optimization: random events in manufacturing systems. Journal of Intelligent Manufacturing, 10, 81-101.
-
(1999)
Journal of Intelligent Manufacturing
, vol.10
, pp. 81-101
-
-
Fleury, G.1
Goujon, J.-Y.2
Gourgand, M.3
Lacomme, P.4
-
23
-
-
84871922434
-
Computerized industrial surface treatment line control: Resolution of a hoist scheduling problem
-
Goujon, J.-Y., Lacomme, P., Norre, S. and Traoré, M., 1996, Computerized industrial surface treatment line control: resolution of a Hoist Scheduling Problem. Paper Presented at the Simulation in Industry, 8th European Simulation Symposium (ESS'96), Genoa, pp. 377-382.
-
(1996)
Simulation in Industry, 8th European Simulation Symposium (ESS'96), Genoa
, pp. 377-382
-
-
Goujon, J.-Y.1
Lacomme, P.2
Norre, S.3
Traoré, M.4
-
24
-
-
0344937693
-
Conception d'un environment de modélisation de systémes de production
-
Gourgand, M. and Kellert, P., 1991, Conception d'un environment de modélisation de systémes de production. Proceedings of the 3rd Congrès International de Génie Industriel, Tours, pp. 191-203.
-
(1991)
Proceedings of the 3rd Congrès International de Génie Industriel, Tours
, pp. 191-203
-
-
Gourgand, M.1
Kellert, P.2
-
25
-
-
0019585243
-
A review of production scheduling
-
Graves, S. C., 1981, A review of production scheduling. Operation Research, 29, 646-675.
-
(1981)
Operation Research
, vol.29
, pp. 646-675
-
-
Graves, S.C.1
-
26
-
-
0024012393
-
Cooling schedules for optimal annealing
-
Hajek, B., 1988, Cooling schedules for optimal annealing. Maths for Operations Research, 13, 311-329.
-
(1988)
Maths for Operations Research
, vol.13
, pp. 311-329
-
-
Hajek, B.1
-
27
-
-
0024770085
-
Optimization by simulated annealing: An experimental evaluation - Part 1: Graph partitioning
-
Johnson, D. S., Aragon, C. R., McGeoch, L. A. and Schevon, C., 1989, Optimization by simulated annealing: an experimental evaluation - Part 1: Graph partitioning. Operations Research, 27, 865-892.
-
(1989)
Operations Research
, vol.27
, pp. 865-892
-
-
Johnson, D.S.1
Aragon, C.R.2
McGeoch, L.A.3
Schevon, C.4
-
28
-
-
0001047763
-
Optimization by simulated annealing: An experimental evaluation - Part 2: Graph coloring & number partitioning
-
Johnson, D. S., Aragon, C. R., McGeoch, L. A. and Schevon, C., 1990, Optimization by simulated annealing: an experimental evaluation - Part 2: Graph coloring & number partitioning. Operations Research, 39, 378-406.
-
(1990)
Operations Research
, vol.39
, pp. 378-406
-
-
Johnson, D.S.1
Aragon, C.R.2
McGeoch, L.A.3
Schevon, C.4
-
29
-
-
0010840257
-
A machine learning approach to the synthesis of diagnosis trees
-
Juricic, D. and Znidarsic, A., 1996, A machine learning approach to the synthesis of diagnosis trees. Proceedings of the European Simulation Multiconference, Budapest, pp. 757-761.
-
(1996)
Proceedings of the European Simulation Multiconference, Budapest
, pp. 757-761
-
-
Juricic, D.1
Znidarsic, A.2
-
30
-
-
0345369008
-
Définition et mise en uvre d'une méthodologie orientée objects pour la modélisation des systémes de production
-
Kellert, P., 1992, Définition et mise en uvre d'une méthodologie orientée objects pour la modélisation des systémes de production. Proceedings of the Congress INFORSID, Informatique des organisations et systémes d'information et de Décision, Clermont-Ferrand, pp. 415-436.
-
(1992)
Proceedings of the Congress INFORSID, Informatique des Organisations et Systémes d'Information et de Décision, Clermont-Ferrand
, pp. 415-436
-
-
Kellert, P.1
-
31
-
-
0004071883
-
Optimisation des systémes de production: Méthodes stochastiques et approches multi-agents
-
PhD thesis, Université Blaise Pascal, Clermont-Ferrand
-
Lacomme, P., 1998, Optimisation des systémes de production: Médes stochastiques et approches multi-agents. PhD thesis, Université Blaise Pascal, Clermont-Ferrand.
-
(1998)
-
-
Lacomme, P.1
-
32
-
-
0003569152
-
A proof: The cyclic hoist scheduling problem is NP-complete
-
Working Paper #89-0006, August (Rutgers University)
-
Lei, L. and Wang, T.-J., 1989, A proof: the Cyclic Hoist Scheduling Problem is NP-complete. Working Paper #89-0006, August (Rutgers University).
-
(1989)
-
-
Lei, L.1
Wang, T.-J.2
-
33
-
-
0000402860
-
The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints
-
Lei, L. and Wang, T.-J., 1991, The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints. Management Science, 37, 1626-1639.
-
Management Science
, vol.37
, pp. 1626-1639
-
-
Lei, L.1
Wang, T.-J.2
-
34
-
-
0020179439
-
Two-operation crane scheduling problems
-
Lieberman, R. W. and Turksen, I. B., 1982, Two-operation crane scheduling problems. IIE Transactions, 14, 147-155.
-
(1982)
IIE Transactions
, vol.14
, pp. 147-155
-
-
Lieberman, R.W.1
Turksen, I.B.2
-
35
-
-
0002784150
-
Etat de l'art: Ordonnancement de robots de manutention en galvanoplastie
-
Manier, M.-A. and Bapriste, P., 1994, Etat de l'art: Ordonnancement de robots de manutention en galvanoplastie. Journal Européen des Systémes Automatisés, 28, 7-35.
-
(1994)
Journal Européen des Systémes Automatisés
, vol.28
, pp. 7-35
-
-
Manier, M.-A.1
Bapriste, P.2
-
36
-
-
0025560282
-
Towards a real time knowledge-based simulation system for diagnosing machine tool failure
-
Manivannan, S., and Banks, J., 1990, Towards a real time knowledge-based simulation system for diagnosing machine tool failure. Proceedings of the 1990 Winter Simulation Conference, New Orleans, pp. 603-608.
-
(1990)
Proceedings of the 1990 Winter Simulation Conference, New Orleans
, pp. 603-608
-
-
Manivannan, S.1
Banks, J.2
-
37
-
-
0000197379
-
A crane scheduling problem in a computer-integrated manufacturing environment
-
Matsuo, H., Shang, J. S., and Sullivan, R. S., 1991, A crane scheduling problem in a computer-integrated manufacturing environment. Management Science, 37, 587-606.
-
(1991)
Management Science
, vol.37
, pp. 587-606
-
-
Matsuo, H.1
Shang, J.S.2
Sullivan, R.S.3
-
38
-
-
5744249209
-
Equation of state calculations by fast computing machines
-
Metropolis, N., Rpzenbluth, A., Rozenbluth, M., Teller, A. and Teller, E., 1953, Equation of state calculations by fast computing machines. Journal of Chemical Physics, 21, 1087-1092.
-
(1953)
Journal of Chemical Physics
, vol.21
, pp. 1087-1092
-
-
Metropolis, N.1
Rpzenbluth, A.2
Rozenbluth, M.3
Teller, A.4
Teller, E.5
-
39
-
-
0010906884
-
Fault diagnosis system based on parity equations and fuzzy logic
-
Miguel De, L. J., Mediavilla, M. and Peran, J. R., 1996, Fault diagnosis system based on parity equations and fuzzy logic. Proceedings of the European Simulation Multiconference, Budapest, pp. 742-746.
-
(1996)
Proceedings of the European Simulation Multiconference, Budapest
, pp. 742-746
-
-
De Miguel, L.J.1
Mediavilla, M.2
Peran, J.R.3
-
40
-
-
0026121766
-
Modelling of an automated guided vehicle system (AGVS) in a just-in-time (JIT) environment
-
Occena, L. G., and Yokota, T., 1991, Modelling of an automated guided vehicle system (AGVS) in a just-in-time (JIT) environment. International Journal of Production Research, 29, 495-511.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 495-511
-
-
Occena, L.G.1
Yokota, T.2
-
41
-
-
0016962332
-
Mathematical programming solution of a hoist scheduling program
-
Phillips, L. W., and Unger, P. S., 1976, Mathematical programming solution of a Hoist Scheduling Program. AIIE Transactions, 8 (2), 219-225.
-
(1976)
AIIE Transactions
, vol.8
, Issue.2
, pp. 219-225
-
-
Phillips, L.W.1
Unger, P.S.2
-
42
-
-
0018516179
-
Scheduling stochastic tasks on two parallel processors
-
Pinedo, M. L. and Weiss, G., 1979, Scheduling stochastic tasks on two parallel processors. Naval Research and Logistics Quarterly, 26, 527-536.
-
(1979)
Naval Research and Logistics Quarterly
, vol.26
, pp. 527-536
-
-
Pinedo, M.L.1
Weiss, G.2
-
43
-
-
0021458321
-
Scheduling jobs with exponentially distributed processing times on two machines with resources constraints
-
Pinedo, M. and Weiss, G., 1984, Scheduling jobs with exponentially distributed processing times on two machines with resources constraints. Naval Research and Logistics Quarterly, 30, 883-889.
-
(1984)
Naval Research and Logistics Quarterly
, vol.30
, pp. 883-889
-
-
Pinedo, M.1
Weiss, G.2
-
44
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation research
-
Ramasesh, R., 1990, Dynamic job shop scheduling: a survey of simulation research. OMEGA, International Journal of Management Science, 18, 43-57.
-
(1990)
OMEGA, International Journal of Management Science
, vol.18
, pp. 43-57
-
-
Ramasesh, R.1
-
45
-
-
0024112269
-
A recent survey of production scheduling
-
Rodammer, F. A., and Preston White, K., 1988, A recent survey of production scheduling. IEEE Transaction on Systems, Man, and Cybernetics, 18, 841-851.
-
(1988)
IEEE Transaction on Systems, Man, and Cybernetics
, vol.18
, pp. 841-851
-
-
Rodammer, F.A.1
Preston White, K.2
-
46
-
-
0003511049
-
-
(Englewood Cliffs, NJ: Prentice Hall)
-
Rumbaugh, J., Blaha, W. and Premerlani, F., 1991, Object-Oriented Modelling and Design (Englewood Cliffs, NJ: Prentice Hall).
-
(1991)
Object-Oriented Modelling and Design
-
-
Rumbaugh, J.1
Blaha, W.2
Premerlani, F.3
-
47
-
-
0026898533
-
Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
-
Sabuncuoglu, I. and Don Hommertzheim, L., 1992, Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion. International Journal of Production Research, 30, 1617-1635.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1617-1635
-
-
Sabuncuoglu, I.1
Don Hommertzheim, L.2
-
48
-
-
0000832587
-
Simulated annealing for multiple objective optimization problems
-
In G. H. Tzeng, H. P. Wang, V. P. Ven and P. L. Yu (eds); (Springer-Verlag)
-
Serafini, P., 1994, Simulated annealing for multiple objective optimization problems. In G. H. Tzeng, H. P. Wang, V. P. Ven and P. L. Yu (eds), Multiple Criteria Decision Making: Expand and Enrich the Domains of Thinking and Application (Springer-Verlag), pp. 293-292
-
(1994)
Multiple Criteria Decision Making: Expand and Enrich the Domains of Thinking and Application
, pp. 293-292
-
-
Serafini, P.1
-
49
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
Shapiro, G. W., and Nuttle, H. L. W., 1988. Hoist Scheduling for a PCB electroplating facility. IIE Transactions, 20, 157-167.
-
(1988)
IIE Transactions
, vol.20
, pp. 157-167
-
-
Shapiro, G.W.1
Nuttle, H.L.W.2
-
50
-
-
0029505811
-
An example for scheduling a chemical processing tank line
-
Song, W., Storch, R. L., and Zabinsky, Z. B., 1995, An example for scheduling a chemical processing tank line. Paper presented at the Conference on Emergencing Technologies and Factory Automation, ETFA'95, 10-13 October, Paris, pp. 475-482.
-
(1995)
Conference on Emergencing Technologies and Factory Automation, ETFA'95, 10-13 October, Paris
, pp. 475-482
-
-
Song, W.1
Storch, R.L.2
Zabinsky, Z.B.3
-
51
-
-
84877343203
-
An algorithm for scheduling a chemical tank line
-
Song, W., Zabinsky, Z. B. and Storch, R. L., 1993, An algorithm for scheduling a chemical tank line. Production Planning and Control, 4, 323-332.
-
(1993)
Production Planning and Control
, vol.4
, pp. 323-332
-
-
Song, W.1
Zabinsky, Z.B.2
Storch, R.L.3
-
52
-
-
0000051521
-
Bounding completion times of jobs with arbitrary release times, variable execution times and resource sharing
-
Sun, J., Gardner, M. K. and Liu, J. W. S., 1997, Bounding completion times of jobs with arbitrary release times, variable execution times and resource sharing. IEEE Transactions on Software Engineering, 23, 603-615.
-
(1997)
IEEE Transactions on Software Engineering
, vol.23
, pp. 603-615
-
-
Sun, J.1
Gardner, M.K.2
Liu, J.W.S.3
-
53
-
-
0000168684
-
An expert scheduling system for material handling hoist
-
Thesen, A. and Lei, L., 1990, An expert scheduling system for material handling hoist. Journal of Manufacturing System, 9, 247-252.
-
(1990)
Journal of Manufacturing System
, vol.9
, pp. 247-252
-
-
Thesen, A.1
Lei, L.2
-
54
-
-
0010907489
-
-
UML; 13 January 1997 (Rational Software Corporation)
-
UML, Specification of UML, Version 1.0, 13 January 1997 (Rational Software Corporation).
-
(1997)
Specification of UML, Version 1.0
-
-
-
56
-
-
0029505607
-
Improve the productivity of electroplating lines by changing the layout of the tanks
-
Varnier, C., Grunder, O. and Baptiste, P., 1995, Improve the productivity of electroplating lines by changing the layout of the tanks. Paper presented at the Conference on Emergencing Technologies and Factory Automation, ETFA'95, 10-13 October, Paris, pp. 441-450.
-
(1995)
Conference on Emergencing Technologies and Factory Automation, ETFA'95, 10-13 October, Paris
, pp. 441-450
-
-
Varnier, C.1
Grunder, O.2
Baptiste, P.3
-
57
-
-
0010846096
-
An intelligent decision system for a modern manufacturing system
-
Wabg, K.-S., Hsia, H.-W. and Zhuang, Z.-D., 1993, An intelligent decision system for a modern manufacturing system. International Journal of Computer Integrated Manufacturing, 6, 281-292.
-
(1993)
International Journal of Computer Integrated Manufacturing
, vol.6
, pp. 281-292
-
-
Wabg, K.-S.1
Hsia, H.-W.2
Zhuang, Z.-D.3
-
58
-
-
0020100028
-
Scheduling jobs with stochastic requirement on parallel machines to minimize makespan or flow time
-
Weber, R. R., 1982, Scheduling jobs with stochastic requirement on parallel machines to minimize makespan or flow time. Journal of Applied Probability, 19, 167-182.
-
(1982)
Journal of Applied Probability
, vol.19
, pp. 167-182
-
-
Weber, R.R.1
-
59
-
-
0023108688
-
On the normality of operation times in small-lot assembly systems: A technical note
-
Wilhelm, W. E., 1987, On the normality of operation times in small-lot assembly systems: a technical note. International Journal of Production Research, 25, 145-149.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 145-149
-
-
Wilhelm, W.E.1
-
60
-
-
0010774130
-
Using simulation to generate data for building neural network models and diagnosis faults in electric circuits
-
Xia, S., 1996, Using simulation to generate data for building neural network models and diagnosis faults in electric circuits. Proceedings of the European Simulation Multiconference, Budapest, pp. 747-751.
-
(1996)
Proceedings of the European Simulation Multiconference, Budapest
, pp. 747-751
-
-
Xia, S.1
-
61
-
-
0001403883
-
Trace-driven knowledge acquisition (TDKA) for rule-based time scheduling systems
-
Yih, Y., 1990, Trace-driven knowledge acquisition (TDKA) for rule-based time scheduling systems. Journal of Intelligent Manufacturing, 1, 217-230.
-
(1990)
Journal of Intelligent Manufacturing
, vol.1
, pp. 217-230
-
-
Yih, Y.1
|