메뉴 건너뛰기




Volumn 39, Issue 15, 2001, Pages 3419-3457

Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; MATHEMATICAL MODELS; PROBLEM SOLVING; PRODUCT DEVELOPMENT; RANDOM PROCESSES; RESOURCE ALLOCATION; ROBOTIC ASSEMBLY;

EID: 0035889165     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540110058331     Document Type: Article
Times cited : (25)

References (62)
  • 8
    • 0002107964 scopus 로고
    • Optimization of a programmable hoist using linear programming
    • Bracker, W. E., and Chapman, W., 1985, Optimization of a programmable hoist using linear programming. Printed Circuit Fabrication, 8, 39-42.
    • (1985) Printed Circuit Fabrication , vol.8 , pp. 39-42
    • Bracker, W.E.1    Chapman, W.2
  • 9
    • 0002317675 scopus 로고
    • Sequencing tasks with exponential services times to minimize the expected flow time or makespan
    • Bruno, J., Downey, P. and Frederickson, G. N., 1981, Sequencing tasks with exponential services times to minimize the expected flow time or makespan. Journal of the Association for Computing Machinery, 28, 100-113.
    • (1981) Journal of the Association for Computing Machinery , vol.28 , pp. 100-113
    • Bruno, J.1    Downey, P.2    Frederickson, G.N.3
  • 11
    • 0001621836 scopus 로고
    • Rough large deviation estimates for simulated annealing: Application to exponential schedules
    • Catoni, O., 1992, Rough large deviation estimates for simulated annealing: application to exponential schedules. Annals of Probability, 29, 1109-1146.
    • (1992) Annals of Probability , vol.29 , pp. 1109-1146
    • Catoni, O.1
  • 12
    • 0029427108 scopus 로고
    • Couplage méthode d'ordonnancement-simulation pour l'ordonnancement de systémes industriels de traitement de surface
    • Caux, C., Fleury, G., Gourgand, M., and Kellert, P., 1995, Couplage méthode d'ordonnancement-simulation pour l'ordonnancement de systémes industriels de traitement de surface. Recherche Opérationelle/Operational Research (RAIRO), 29, 391-413.
    • (1995) Recherche Opérationelle/Operational Research (RAIRO) , vol.29 , pp. 391-413
    • Caux, C.1    Fleury, G.2    Gourgand, M.3    Kellert, P.4
  • 17
    • 85018104842 scopus 로고
    • Pareto simulated annealing - a metaheuristic technique for multiple-objective combinatorial optimization
    • Czyzak, P. and Jaszkiewicz, A., 1988, Pareto simulated annealing - a metaheuristic technique for multiple-objective combinatorial optimization. Journal of Multi-Criteria Decision Analysis, 7, 34-47.
    • (1988) Journal of Multi-Criteria Decision Analysis , vol.7 , pp. 34-47
    • Czyzak, P.1    Jaszkiewicz, A.2
  • 18
    • 0000131850 scopus 로고
    • A taxonomy of discrete manufacturing systems
    • Dietrich, B. L., 1991, A taxonomy of discrete manufacturing systems. Operations Research, 39, 886-902.
    • (1991) Operations Research , vol.39 , pp. 886-902
    • Dietrich, B.L.1
  • 19
    • 0042996279 scopus 로고
    • Méthodes stochastiques et déterministes pour les problémes NP-Difficiles
    • PhD thesis, Université Blaise Pascal, Clermont-Ferrand
    • Fleury, G., 1993, Méthodes stochastiques et déterministes pour les problémes NP-Difficiles. PhD thesis, Université Blaise Pascal, Clermont-Ferrand.
    • (1993)
    • Fleury, G.1
  • 20
    • 0010776912 scopus 로고
    • Application de méthodes stochastiques inspirées du recuit simulé à des problémes d'ordonnancement
    • Fleury, G., 1995, Application de méthodes stochastiques inspirées du recuit simulé à des problémes d'ordonnancement. Journal Européen des Systémes Automatisés, 29, 445-470.
    • (1995) Journal Européen des Systémes Automatisés , vol.29 , pp. 445-470
    • Fleury, G.1
  • 22
    • 0032682226 scopus 로고    scopus 로고
    • Multi-Agent approach and stochastic optimization: Random events in manufacturing systems
    • Fleury, G., Goujon, J.-Y., Gourgand, M. and Lacomme, P., 1999, Multi-Agent approach and stochastic optimization: random events in manufacturing systems. Journal of Intelligent Manufacturing, 10, 81-101.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 81-101
    • Fleury, G.1    Goujon, J.-Y.2    Gourgand, M.3    Lacomme, P.4
  • 25
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S. C., 1981, A review of production scheduling. Operation Research, 29, 646-675.
    • (1981) Operation Research , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 26
    • 0024012393 scopus 로고
    • Cooling schedules for optimal annealing
    • Hajek, B., 1988, Cooling schedules for optimal annealing. Maths for Operations Research, 13, 311-329.
    • (1988) Maths for Operations Research , vol.13 , pp. 311-329
    • Hajek, B.1
  • 27
    • 0024770085 scopus 로고
    • Optimization by simulated annealing: An experimental evaluation - Part 1: Graph partitioning
    • Johnson, D. S., Aragon, C. R., McGeoch, L. A. and Schevon, C., 1989, Optimization by simulated annealing: an experimental evaluation - Part 1: Graph partitioning. Operations Research, 27, 865-892.
    • (1989) Operations Research , vol.27 , pp. 865-892
    • Johnson, D.S.1    Aragon, C.R.2    McGeoch, L.A.3    Schevon, C.4
  • 28
    • 0001047763 scopus 로고
    • Optimization by simulated annealing: An experimental evaluation - Part 2: Graph coloring & number partitioning
    • Johnson, D. S., Aragon, C. R., McGeoch, L. A. and Schevon, C., 1990, Optimization by simulated annealing: an experimental evaluation - Part 2: Graph coloring & number partitioning. Operations Research, 39, 378-406.
    • (1990) Operations Research , vol.39 , pp. 378-406
    • Johnson, D.S.1    Aragon, C.R.2    McGeoch, L.A.3    Schevon, C.4
  • 31
    • 0004071883 scopus 로고    scopus 로고
    • Optimisation des systémes de production: Méthodes stochastiques et approches multi-agents
    • PhD thesis, Université Blaise Pascal, Clermont-Ferrand
    • Lacomme, P., 1998, Optimisation des systémes de production: Médes stochastiques et approches multi-agents. PhD thesis, Université Blaise Pascal, Clermont-Ferrand.
    • (1998)
    • Lacomme, P.1
  • 32
    • 0003569152 scopus 로고
    • A proof: The cyclic hoist scheduling problem is NP-complete
    • Working Paper #89-0006, August (Rutgers University)
    • Lei, L. and Wang, T.-J., 1989, A proof: the Cyclic Hoist Scheduling Problem is NP-complete. Working Paper #89-0006, August (Rutgers University).
    • (1989)
    • Lei, L.1    Wang, T.-J.2
  • 33
    • 0000402860 scopus 로고    scopus 로고
    • The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints
    • Lei, L. and Wang, T.-J., 1991, The minimum common cycle algorithm for cycle scheduling of two material handling hoists with time window constraints. Management Science, 37, 1626-1639.
    • Management Science , vol.37 , pp. 1626-1639
    • Lei, L.1    Wang, T.-J.2
  • 34
    • 0020179439 scopus 로고
    • Two-operation crane scheduling problems
    • Lieberman, R. W. and Turksen, I. B., 1982, Two-operation crane scheduling problems. IIE Transactions, 14, 147-155.
    • (1982) IIE Transactions , vol.14 , pp. 147-155
    • Lieberman, R.W.1    Turksen, I.B.2
  • 35
  • 37
    • 0000197379 scopus 로고
    • A crane scheduling problem in a computer-integrated manufacturing environment
    • Matsuo, H., Shang, J. S., and Sullivan, R. S., 1991, A crane scheduling problem in a computer-integrated manufacturing environment. Management Science, 37, 587-606.
    • (1991) Management Science , vol.37 , pp. 587-606
    • Matsuo, H.1    Shang, J.S.2    Sullivan, R.S.3
  • 40
    • 0026121766 scopus 로고
    • Modelling of an automated guided vehicle system (AGVS) in a just-in-time (JIT) environment
    • Occena, L. G., and Yokota, T., 1991, Modelling of an automated guided vehicle system (AGVS) in a just-in-time (JIT) environment. International Journal of Production Research, 29, 495-511.
    • (1991) International Journal of Production Research , vol.29 , pp. 495-511
    • Occena, L.G.1    Yokota, T.2
  • 41
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling program
    • Phillips, L. W., and Unger, P. S., 1976, Mathematical programming solution of a Hoist Scheduling Program. AIIE Transactions, 8 (2), 219-225.
    • (1976) AIIE Transactions , vol.8 , Issue.2 , pp. 219-225
    • Phillips, L.W.1    Unger, P.S.2
  • 42
    • 0018516179 scopus 로고
    • Scheduling stochastic tasks on two parallel processors
    • Pinedo, M. L. and Weiss, G., 1979, Scheduling stochastic tasks on two parallel processors. Naval Research and Logistics Quarterly, 26, 527-536.
    • (1979) Naval Research and Logistics Quarterly , vol.26 , pp. 527-536
    • Pinedo, M.L.1    Weiss, G.2
  • 43
    • 0021458321 scopus 로고
    • Scheduling jobs with exponentially distributed processing times on two machines with resources constraints
    • Pinedo, M. and Weiss, G., 1984, Scheduling jobs with exponentially distributed processing times on two machines with resources constraints. Naval Research and Logistics Quarterly, 30, 883-889.
    • (1984) Naval Research and Logistics Quarterly , vol.30 , pp. 883-889
    • Pinedo, M.1    Weiss, G.2
  • 47
    • 0026898533 scopus 로고
    • Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
    • Sabuncuoglu, I. and Don Hommertzheim, L., 1992, Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion. International Journal of Production Research, 30, 1617-1635.
    • (1992) International Journal of Production Research , vol.30 , pp. 1617-1635
    • Sabuncuoglu, I.1    Don Hommertzheim, L.2
  • 48
    • 0000832587 scopus 로고
    • Simulated annealing for multiple objective optimization problems
    • In G. H. Tzeng, H. P. Wang, V. P. Ven and P. L. Yu (eds); (Springer-Verlag)
    • Serafini, P., 1994, Simulated annealing for multiple objective optimization problems. In G. H. Tzeng, H. P. Wang, V. P. Ven and P. L. Yu (eds), Multiple Criteria Decision Making: Expand and Enrich the Domains of Thinking and Application (Springer-Verlag), pp. 293-292
    • (1994) Multiple Criteria Decision Making: Expand and Enrich the Domains of Thinking and Application , pp. 293-292
    • Serafini, P.1
  • 49
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • Shapiro, G. W., and Nuttle, H. L. W., 1988. Hoist Scheduling for a PCB electroplating facility. IIE Transactions, 20, 157-167.
    • (1988) IIE Transactions , vol.20 , pp. 157-167
    • Shapiro, G.W.1    Nuttle, H.L.W.2
  • 52
    • 0000051521 scopus 로고    scopus 로고
    • Bounding completion times of jobs with arbitrary release times, variable execution times and resource sharing
    • Sun, J., Gardner, M. K. and Liu, J. W. S., 1997, Bounding completion times of jobs with arbitrary release times, variable execution times and resource sharing. IEEE Transactions on Software Engineering, 23, 603-615.
    • (1997) IEEE Transactions on Software Engineering , vol.23 , pp. 603-615
    • Sun, J.1    Gardner, M.K.2    Liu, J.W.S.3
  • 53
    • 0000168684 scopus 로고
    • An expert scheduling system for material handling hoist
    • Thesen, A. and Lei, L., 1990, An expert scheduling system for material handling hoist. Journal of Manufacturing System, 9, 247-252.
    • (1990) Journal of Manufacturing System , vol.9 , pp. 247-252
    • Thesen, A.1    Lei, L.2
  • 54
    • 0010907489 scopus 로고    scopus 로고
    • UML; 13 January 1997 (Rational Software Corporation)
    • UML, Specification of UML, Version 1.0, 13 January 1997 (Rational Software Corporation).
    • (1997) Specification of UML, Version 1.0
  • 58
    • 0020100028 scopus 로고
    • Scheduling jobs with stochastic requirement on parallel machines to minimize makespan or flow time
    • Weber, R. R., 1982, Scheduling jobs with stochastic requirement on parallel machines to minimize makespan or flow time. Journal of Applied Probability, 19, 167-182.
    • (1982) Journal of Applied Probability , vol.19 , pp. 167-182
    • Weber, R.R.1
  • 59
    • 0023108688 scopus 로고
    • On the normality of operation times in small-lot assembly systems: A technical note
    • Wilhelm, W. E., 1987, On the normality of operation times in small-lot assembly systems: a technical note. International Journal of Production Research, 25, 145-149.
    • (1987) International Journal of Production Research , vol.25 , pp. 145-149
    • Wilhelm, W.E.1
  • 60
    • 0010774130 scopus 로고    scopus 로고
    • Using simulation to generate data for building neural network models and diagnosis faults in electric circuits
    • Xia, S., 1996, Using simulation to generate data for building neural network models and diagnosis faults in electric circuits. Proceedings of the European Simulation Multiconference, Budapest, pp. 747-751.
    • (1996) Proceedings of the European Simulation Multiconference, Budapest , pp. 747-751
    • Xia, S.1
  • 61
    • 0001403883 scopus 로고
    • Trace-driven knowledge acquisition (TDKA) for rule-based time scheduling systems
    • Yih, Y., 1990, Trace-driven knowledge acquisition (TDKA) for rule-based time scheduling systems. Journal of Intelligent Manufacturing, 1, 217-230.
    • (1990) Journal of Intelligent Manufacturing , vol.1 , pp. 217-230
    • Yih, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.