메뉴 건너뛰기




Volumn 66, Issue 2, 1996, Pages 121-130

Composite Dispatching Rules for Multiple-Vehicle AGV Systems

Author keywords

Automatic Guided Vehicle System; Composite Dispatching Rules; Simulation Models; Statistical Analyses

Indexed keywords

COLLISION AVOIDANCE; CONTROL SYSTEMS; HEURISTIC METHODS; MATERIALS HANDLING; MOTION CONTROL; ROBOTS; STATISTICAL METHODS;

EID: 0030082467     PISSN: 00375497     EISSN: None     Source Type: Journal    
DOI: 10.1177/003754979606600208     Document Type: Article
Times cited : (13)

References (21)
  • 1
    • 0024621009 scopus 로고
    • Decentralized Control of a Fixed Route Automatic Guided Vehicle System
    • Bartholdi, J. J. and L K. Platzman (1989), "Decentralized Control of a Fixed Route Automatic Guided Vehicle System," IIE Transactions, 21, 1, 76-81
    • (1989) IIE Transactions , vol.21 , Issue.1 , pp. 76-81
    • Bartholdi, J.J.1    Platzman, L.K.2
  • 2
    • 0026117415 scopus 로고
    • Tandem Configurations for Automated Guided Vehicle Systems Analysis of Single Vehicle Loops
    • Bozer, Y.A. and M.M. Srinivasan (1991), "Tandem Configurations for Automated Guided Vehicle Systems Analysis of Single Vehicle Loops," IIE Transactions, 23, 1, 71-82
    • (1991) IIE Transactions , vol.23 , Issue.1 , pp. 71-82
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 3
    • 0028490593 scopus 로고
    • Traditional and Tandem AGV System Layouts: A Simulation Study
    • Choi, H. G., H.J. Kwon and J Lee. (1994) "Traditional and Tandem AGV System Layouts: A Simulation Study," SIMULATION, vol. 63, no. 2, 85-93.
    • (1994) SIMULATION , vol.63 , Issue.2 , pp. 85-93
    • Choi, H.G.1    Kwon, H.J.2    Lee, J.3
  • 4
    • 0023541856 scopus 로고
    • Pull Versus Push Strategy for Automated Guided Vehicle Load Movement in a Batch Manufacturing System
    • Egbelu, P.J. (1987), "Pull Versus Push Strategy for Automated Guided Vehicle Load Movement in a Batch Manufacturing System," Journal of Manufacturing Systems, 6(3), 271-280
    • (1987) Journal of Manufacturing Systems , vol.6 , Issue.3 , pp. 271-280
    • Egbelu, P.J.1
  • 6
    • 0001021923 scopus 로고
    • Forming cells to eliminate vehicle interference and system locking in an AGVS
    • Faraji, M. and R. Batta (1994) "Forming cells to eliminate vehicle interference and system locking in an AGVS," International Journal of Production Research, 32, 9, 2219-2241.
    • (1994) International Journal of Production Research , vol.32 , Issue.9 , pp. 2219-2241
    • Faraji, M.1    Batta, R.2
  • 7
    • 0002418444 scopus 로고
    • Developing Control Rules for an AGV using Markov decision processes
    • Hodgson, T. J., R. E. King, S. K. Monteith, and S. R Schultz (1987), "Developing Control Rules for an AGV using Markov decision processes," Material Flow, 4, 85-96
    • (1987) Material Flow , vol.4 , pp. 85-96
    • Hodgson, T.J.1    King, R.E.2    Monteith, S.K.3    Schultz, S.R.4
  • 8
    • 0027656981 scopus 로고
    • Operational Control of a Bidirectional Automated Guided Vehicle System
    • Kim C. W. and M. A Tanchoco (1993), "Operational Control of a Bidirectional Automated Guided Vehicle System," International Journal of Production action Research, 31(9), 2123-2138
    • (1993) International Journal of Production Action Research , vol.31 , Issue.9 , pp. 2123-2138
    • Kim, C.W.1    Tanchoco, M.A.2
  • 11
    • 0025482436 scopus 로고
    • Design of an Automated Guided Vehicle-based Material Handling System for a Flexible Manufacturing System
    • Mahadevan, B. and T.T. Narendran (1990), "Design of an Automated Guided Vehicle-based Material Handling System for a Flexible Manufacturing System," International Journal of Production Research, 28(9), 1611-1622.
    • (1990) International Journal of Production Research , vol.28 , Issue.9 , pp. 1611-1622
    • Mahadevan, B.1    Narendran, T.T.2
  • 12
    • 0020140765 scopus 로고
    • Design of Automatic Guided Vehicle Systems
    • Maxwell, W. L. and J. A. Muckstadt (1982), "Design of Automatic Guided Vehicle Systems", IIE Transactions, 14, 2, 114-124.
    • (1982) IIE Transactions , vol.14 , Issue.2 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 13
    • 0009351726 scopus 로고
    • Simulation Models Calculate How Many Automated Guided Vehicles Are Needed
    • February
    • Newton, D. (1985) "Simulation Models Calculate How Many Automated Guided Vehicles Are Needed," Industrial Engineering, February, 17, 68-73.
    • (1985) Industrial Engineering , vol.17 , pp. 68-73
    • Newton, D.1
  • 15
    • 0027594172 scopus 로고
    • Design and Evaluation of Automated Guided Vehicle Systems for Flexible Manufacturing Systems: An Extended Timed Petri Net Based Approach
    • Raju, K. R. and O. V. K. Chetty (1993), "Design and Evaluation of Automated Guided Vehicle Systems for Flexible Manufacturing Systems: An Extended Timed Petri Net Based Approach," International Journal of Production Research, 31(5), 1069-1096.
    • (1993) International Journal of Production Research , vol.31 , Issue.5 , pp. 1069-1096
    • Raju, K.R.1    Chetty, O.V.K.2
  • 16
    • 0043158992 scopus 로고
    • An Evaluation of Vehicle Dispatching Rules and Their Effect on Shop Performance
    • Russel, R. S. and J. M. A. Tanchoco (1984), "An Evaluation of Vehicle Dispatching Rules and Their Effect on Shop Performance," Material Flow, 1, 271-280.
    • (1984) Material Flow , vol.1 , pp. 271-280
    • Russel, R.S.1    Tanchoco, J.M.A.2
  • 17
    • 0026898533 scopus 로고
    • Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-time Criterion
    • Sabuncuoglu, I. and D. L. Hommertzheim (1992), "Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-time Criterion," International Journal of Production Research, 30, 1617-1635.
    • (1992) International Journal of Production Research , vol.30 , pp. 1617-1635
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 18
    • 0042088700 scopus 로고
    • Experimental Investigation of FMS Due-Date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules
    • Sabuncuoglu, I. and D. L. Hommertzheim (1993), "Experimental Investigation of FMS Due-Date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules," International Journal of Flexible Manufacturing System, 5, 301-324.
    • (1993) International Journal of Flexible Manufacturing System , vol.5 , pp. 301-324
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 19
    • 0025417539 scopus 로고
    • An Analytical Method for Configuring Fixed-path, Closed-loop Material Handling System
    • Sharp, G. P. and F. F. Liu (1990), "An Analytical Method for Configuring Fixed-path, Closed-loop Material Handling System," International Journal of Production Research, 28, 4, 757-783.
    • (1990) International Journal of Production Research , vol.28 , Issue.4 , pp. 757-783
    • Sharp, G.P.1    Liu, F.F.2
  • 20
    • 0027609316 scopus 로고
    • A Study on Decision Rules of a Scheduling Model in an FMS
    • Tang, L. L., Y. Yih, and C-Y. Liu (1993), "A Study on Decision Rules of a Scheduling Model in an FMS," Computers In Industry, 21, 1-13.
    • (1993) Computers in Industry , vol.21 , pp. 1-13
    • Tang, L.L.1    Yih, Y.2    Liu, C.-Y.3
  • 21
    • 0027187520 scopus 로고
    • Push and Pull Rules for Dispatching Automated Guided Vehicles in a Flexible Manufacturing System
    • Yim, D. S. and R. J. Linn (1993), "Push and Pull Rules for Dispatching Automated Guided Vehicles in a Flexible Manufacturing System," International Journal of Production Research, 31, 1, 43-57.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 43-57
    • Yim, D.S.1    Linn, R.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.