-
1
-
-
0024621009
-
Decentralized Control of a Fixed Route Automatic Guided Vehicle System
-
Bartholdi, J. J. and L K. Platzman (1989), "Decentralized Control of a Fixed Route Automatic Guided Vehicle System," IIE Transactions, 21, 1, 76-81
-
(1989)
IIE Transactions
, vol.21
, Issue.1
, pp. 76-81
-
-
Bartholdi, J.J.1
Platzman, L.K.2
-
2
-
-
0026117415
-
Tandem Configurations for Automated Guided Vehicle Systems Analysis of Single Vehicle Loops
-
Bozer, Y.A. and M.M. Srinivasan (1991), "Tandem Configurations for Automated Guided Vehicle Systems Analysis of Single Vehicle Loops," IIE Transactions, 23, 1, 71-82
-
(1991)
IIE Transactions
, vol.23
, Issue.1
, pp. 71-82
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
3
-
-
0028490593
-
Traditional and Tandem AGV System Layouts: A Simulation Study
-
Choi, H. G., H.J. Kwon and J Lee. (1994) "Traditional and Tandem AGV System Layouts: A Simulation Study," SIMULATION, vol. 63, no. 2, 85-93.
-
(1994)
SIMULATION
, vol.63
, Issue.2
, pp. 85-93
-
-
Choi, H.G.1
Kwon, H.J.2
Lee, J.3
-
4
-
-
0023541856
-
Pull Versus Push Strategy for Automated Guided Vehicle Load Movement in a Batch Manufacturing System
-
Egbelu, P.J. (1987), "Pull Versus Push Strategy for Automated Guided Vehicle Load Movement in a Batch Manufacturing System," Journal of Manufacturing Systems, 6(3), 271-280
-
(1987)
Journal of Manufacturing Systems
, vol.6
, Issue.3
, pp. 271-280
-
-
Egbelu, P.J.1
-
5
-
-
0021423836
-
Characterization of Automatic Guided Vehicle Dispatching Rules
-
Egbelu, P.J. and J M. A Tanchoco (1984), "Characterization of Automatic Guided Vehicle Dispatching Rules," International Journal of Production Research, 22, 3, 359-374
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
6
-
-
0001021923
-
Forming cells to eliminate vehicle interference and system locking in an AGVS
-
Faraji, M. and R. Batta (1994) "Forming cells to eliminate vehicle interference and system locking in an AGVS," International Journal of Production Research, 32, 9, 2219-2241.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.9
, pp. 2219-2241
-
-
Faraji, M.1
Batta, R.2
-
7
-
-
0002418444
-
Developing Control Rules for an AGV using Markov decision processes
-
Hodgson, T. J., R. E. King, S. K. Monteith, and S. R Schultz (1987), "Developing Control Rules for an AGV using Markov decision processes," Material Flow, 4, 85-96
-
(1987)
Material Flow
, vol.4
, pp. 85-96
-
-
Hodgson, T.J.1
King, R.E.2
Monteith, S.K.3
Schultz, S.R.4
-
8
-
-
0027656981
-
Operational Control of a Bidirectional Automated Guided Vehicle System
-
Kim C. W. and M. A Tanchoco (1993), "Operational Control of a Bidirectional Automated Guided Vehicle System," International Journal of Production action Research, 31(9), 2123-2138
-
(1993)
International Journal of Production Action Research
, vol.31
, Issue.9
, pp. 2123-2138
-
-
Kim, C.W.1
Tanchoco, M.A.2
-
11
-
-
0025482436
-
Design of an Automated Guided Vehicle-based Material Handling System for a Flexible Manufacturing System
-
Mahadevan, B. and T.T. Narendran (1990), "Design of an Automated Guided Vehicle-based Material Handling System for a Flexible Manufacturing System," International Journal of Production Research, 28(9), 1611-1622.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.9
, pp. 1611-1622
-
-
Mahadevan, B.1
Narendran, T.T.2
-
12
-
-
0020140765
-
Design of Automatic Guided Vehicle Systems
-
Maxwell, W. L. and J. A. Muckstadt (1982), "Design of Automatic Guided Vehicle Systems", IIE Transactions, 14, 2, 114-124.
-
(1982)
IIE Transactions
, vol.14
, Issue.2
, pp. 114-124
-
-
Maxwell, W.L.1
Muckstadt, J.A.2
-
13
-
-
0009351726
-
Simulation Models Calculate How Many Automated Guided Vehicles Are Needed
-
February
-
Newton, D. (1985) "Simulation Models Calculate How Many Automated Guided Vehicles Are Needed," Industrial Engineering, February, 17, 68-73.
-
(1985)
Industrial Engineering
, vol.17
, pp. 68-73
-
-
Newton, D.1
-
15
-
-
0027594172
-
Design and Evaluation of Automated Guided Vehicle Systems for Flexible Manufacturing Systems: An Extended Timed Petri Net Based Approach
-
Raju, K. R. and O. V. K. Chetty (1993), "Design and Evaluation of Automated Guided Vehicle Systems for Flexible Manufacturing Systems: An Extended Timed Petri Net Based Approach," International Journal of Production Research, 31(5), 1069-1096.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.5
, pp. 1069-1096
-
-
Raju, K.R.1
Chetty, O.V.K.2
-
16
-
-
0043158992
-
An Evaluation of Vehicle Dispatching Rules and Their Effect on Shop Performance
-
Russel, R. S. and J. M. A. Tanchoco (1984), "An Evaluation of Vehicle Dispatching Rules and Their Effect on Shop Performance," Material Flow, 1, 271-280.
-
(1984)
Material Flow
, vol.1
, pp. 271-280
-
-
Russel, R.S.1
Tanchoco, J.M.A.2
-
17
-
-
0026898533
-
Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-time Criterion
-
Sabuncuoglu, I. and D. L. Hommertzheim (1992), "Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-time Criterion," International Journal of Production Research, 30, 1617-1635.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1617-1635
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
18
-
-
0042088700
-
Experimental Investigation of FMS Due-Date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules
-
Sabuncuoglu, I. and D. L. Hommertzheim (1993), "Experimental Investigation of FMS Due-Date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules," International Journal of Flexible Manufacturing System, 5, 301-324.
-
(1993)
International Journal of Flexible Manufacturing System
, vol.5
, pp. 301-324
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
19
-
-
0025417539
-
An Analytical Method for Configuring Fixed-path, Closed-loop Material Handling System
-
Sharp, G. P. and F. F. Liu (1990), "An Analytical Method for Configuring Fixed-path, Closed-loop Material Handling System," International Journal of Production Research, 28, 4, 757-783.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.4
, pp. 757-783
-
-
Sharp, G.P.1
Liu, F.F.2
-
20
-
-
0027609316
-
A Study on Decision Rules of a Scheduling Model in an FMS
-
Tang, L. L., Y. Yih, and C-Y. Liu (1993), "A Study on Decision Rules of a Scheduling Model in an FMS," Computers In Industry, 21, 1-13.
-
(1993)
Computers in Industry
, vol.21
, pp. 1-13
-
-
Tang, L.L.1
Yih, Y.2
Liu, C.-Y.3
-
21
-
-
0027187520
-
Push and Pull Rules for Dispatching Automated Guided Vehicles in a Flexible Manufacturing System
-
Yim, D. S. and R. J. Linn (1993), "Push and Pull Rules for Dispatching Automated Guided Vehicles in a Flexible Manufacturing System," International Journal of Production Research, 31, 1, 43-57.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.1
, pp. 43-57
-
-
Yim, D.S.1
Linn, R.J.2
|