Application of a technique for research and development program evaluation
-
Malcolm D.G., Roseboom J.H., Clark C.E., and Fazar W. Application of a technique for research and development program evaluation. Operat Res 7 5 (1959) 646-669
-
(1959)
Operat Res
, vol.7
, Issue.5
, pp. 646-669
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
4
-
-
84868302310
-
A practical and accurate alternative to PERT
-
Jozefowska J., and Weglarz J. (Eds), Springer
-
Dodin B. A practical and accurate alternative to PERT. In: Jozefowska J., and Weglarz J. (Eds). Perspectives in modern project scheduling (2006), Springer 3-23
-
(2006)
Perspectives in modern project scheduling
, pp. 3-23
-
-
Dodin, B.1
-
5
-
-
0002146440
-
The use of fuzzy variables in PERT
-
Chanas S., and Kamburowski J. The use of fuzzy variables in PERT. Fuzzy Sets Syst 5 1 (1981) 11-19
-
(1981)
Fuzzy Sets Syst
, vol.5
, Issue.1
, pp. 11-19
-
-
Chanas, S.1
Kamburowski, J.2
-
6
-
-
34248666540
-
Fuzzy sets
-
Zadeh L.A. Fuzzy sets. Informat Contr 8 (1965) 338-353
-
(1965)
Informat Contr
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
9
-
-
0020798185
-
Fuzzy network planning - FNET
-
Gazdik I. Fuzzy network planning - FNET. IEEE Trans Reliab R-32 3 (1983) 304-313
-
(1983)
IEEE Trans Reliab
, vol.R-32
, Issue.3
, pp. 304-313
-
-
Gazdik, I.1
-
10
-
-
0024770103
-
Stochastic and fuzzy PERT
-
Lootsma F.A. Stochastic and fuzzy PERT. Eur J Operat Res 43 2 (1989) 174-183
-
(1989)
Eur J Operat Res
, vol.43
, Issue.2
, pp. 174-183
-
-
Lootsma, F.A.1
-
11
-
-
0000732919
-
Project network analysis using fuzzy sets theory
-
Lorterapong P., and Moselhi O. Project network analysis using fuzzy sets theory. J Constr Eng Manage ASCE 122 4 (1996) 308-317
-
(1996)
J Constr Eng Manage ASCE
, vol.122
, Issue.4
, pp. 308-317
-
-
Lorterapong, P.1
Moselhi, O.2
-
12
-
-
13944250291
-
Where do we stand with fuzzy project scheduling?
-
Pierre B., Didier G., and Germain L. Where do we stand with fuzzy project scheduling?. J Constr Eng Manage ASCE 130 1 (2004) 114-123
-
(2004)
J Constr Eng Manage ASCE
, vol.130
, Issue.1
, pp. 114-123
-
-
Pierre, B.1
Didier, G.2
Germain, L.3
-
13
-
-
12344320435
-
Fuzzy logic approach for activity delay analysis and schedule updating
-
Adriana V.O., and Aminah R.F. Fuzzy logic approach for activity delay analysis and schedule updating. J Constr Eng Manage ASCE 131 1 (2005) 42-51
-
(2005)
J Constr Eng Manage ASCE
, vol.131
, Issue.1
, pp. 42-51
-
-
Adriana, V.O.1
Aminah, R.F.2
-
14
-
-
33846382794
-
Project schedule management using a fuzzy activity network considering resource and environmental factors
-
Long L.D., and Ohsato A. Project schedule management using a fuzzy activity network considering resource and environmental factors. J Jpn Indus Manage Assoc JIMA 57 4 (2006) 261-271
-
(2006)
J Jpn Indus Manage Assoc JIMA
, vol.57
, Issue.4
, pp. 261-271
-
-
Long, L.D.1
Ohsato, A.2
-
15
-
-
0003926816
-
-
The North River Press Publishing Corporation 246p.
-
Goldratt E. Critical chain (1997), The North River Press Publishing Corporation 246p.
-
(1997)
Critical chain
-
-
Goldratt, E.1
-
17
-
-
0035480172
-
On the merits and pitfalls of critical chain scheduling
-
Herroelen W.S., and Leus R. On the merits and pitfalls of critical chain scheduling. J Operat Manage 19 5 (2001) 559-577
-
(2001)
J Operat Manage
, vol.19
, Issue.5
, pp. 559-577
-
-
Herroelen, W.S.1
Leus, R.2
-
18
-
-
0035426806
-
An investigation into the fundamentals of critical chain project scheduling
-
Herman S. An investigation into the fundamentals of critical chain project scheduling. Int J Project Manage 19 6 (2000) 363-369
-
(2000)
Int J Project Manage
, vol.19
, Issue.6
, pp. 363-369
-
-
Herman, S.1
-
19
-
-
0037402599
-
Note on the paper "Resource-constrained project management using enhanced theory of constraint by Wei"
-
Elmaghraby S.E.E., Herroelen W., and Leus R. Note on the paper "Resource-constrained project management using enhanced theory of constraint by Wei". Int J Project Manage 21 4 (2002) 301-305
-
(2002)
Int J Project Manage
, vol.21
, Issue.4
, pp. 301-305
-
-
Elmaghraby, S.E.E.1
Herroelen, W.2
Leus, R.3
-
20
-
-
33645966496
-
Non-delay scheduling as a managerial approach for managing projects
-
Zwikael O., Cohen Y., and Sadeh A. Non-delay scheduling as a managerial approach for managing projects. Int J Project Manage 24 4 (2006) 330-336
-
(2006)
Int J Project Manage
, vol.24
, Issue.4
, pp. 330-336
-
-
Zwikael, O.1
Cohen, Y.2
Sadeh, A.3
-
21
-
-
0020193734
-
Resource constrained project scheduling with time resource trade-offs: The nonpreemptive case
-
Talbot F.B. Resource constrained project scheduling with time resource trade-offs: The nonpreemptive case. Manage Sci 28 10 (1982) 1197-1210
-
(1982)
Manage Sci
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.B.1
-
22
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problem
-
Elsevier Science, Amsterdam
-
Patterson J.H., Slowinski R., Talbot F.B., and Weglarz J. An algorithm for a general class of precedence and resource constrained scheduling problem. Advances in project scheduling (1989), Elsevier Science, Amsterdam 3-28
-
(1989)
Advances in project scheduling
, pp. 3-28
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
23
-
-
0032096811
-
Multi-mode resource-constrained project scheduling by a Simple, general and powerful sequencing Algorithm
-
Sprecher A., and Drexl A. Multi-mode resource-constrained project scheduling by a Simple, general and powerful sequencing Algorithm. Eur J Operat Res 107 2 (1998) 431-450
-
(1998)
Eur J Operat Res
, vol.107
, Issue.2
, pp. 431-450
-
-
Sprecher, A.1
Drexl, A.2
-
24
-
-
0034311599
-
The discrete time/resource trade-off problem in project networks: a branch-and-bound approach
-
Demeulemeester E.L., Reyck B.D., and Herroelen W.S. The discrete time/resource trade-off problem in project networks: a branch-and-bound approach. IIE Trans 32 11 (2000) 1059-1069
-
(2000)
IIE Trans
, vol.32
, Issue.11
, pp. 1059-1069
-
-
Demeulemeester, E.L.1
Reyck, B.D.2
Herroelen, W.S.3
-
25
-
-
0030216966
-
Resource-constrained project scheduling by simulated annealing
-
Boctor F.F. Resource-constrained project scheduling by simulated annealing. Int J Prod Res 34 8 (1996) 2335-2352
-
(1996)
Int J Prod Res
, vol.34
, Issue.8
, pp. 2335-2352
-
-
Boctor, F.F.1
-
26
-
-
0031276875
-
Local search for nonpreemptive multi-mode resource-constrained project scheduling
-
Kolisch R., and Drexl A. Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Trans 29 11 (1997) 987-999
-
(1997)
IIE Trans
, vol.29
, Issue.11
, pp. 987-999
-
-
Kolisch, R.1
Drexl, A.2
-
27
-
-
0032166848
-
Local search methods for the discrete time/resource trade-off problem in project networks
-
De Reyck B., Demeulemeester E.L., and Herroelen W.S. Local search methods for the discrete time/resource trade-off problem in project networks. Nav Res Log 45 6 (1998) 553-578
-
(1998)
Nav Res Log
, vol.45
, Issue.6
, pp. 553-578
-
-
De Reyck, B.1
Demeulemeester, E.L.2
Herroelen, W.S.3
-
28
-
-
0002614325
-
A genetic algorithm approach to a general category project scheduling problem
-
Ozdamar L. A genetic algorithm approach to a general category project scheduling problem. IEEE Trans Syst Man Cyber 29 1 (1999) 44-59
-
(1999)
IEEE Trans Syst Man Cyber
, vol.29
, Issue.1
, pp. 44-59
-
-
Ozdamar, L.1
-
29
-
-
0035612930
-
Project scheduling with multiple modes: a genetic algorithm
-
Hartman S. Project scheduling with multiple modes: a genetic algorithm. Annals of Operat Res 102 1-4 (2001) 111-135
-
(2001)
Annals of Operat Res
, vol.102
, Issue.1-4
, pp. 111-135
-
-
Hartman, S.1
-
30
-
-
0014574409
-
Multi project scheduling with limited resources: a zero-one programming approach
-
Pritsker A.A.B., Watters L.J., and Wolfe P.M. Multi project scheduling with limited resources: a zero-one programming approach. Manage Sci 16 1 (1969) 93-108
-
(1969)
Manage Sci
, vol.16
, Issue.1
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
31
-
-
0016028677
-
A horizon-varying, zero-one approach to project scheduling
-
Patterson J.H., and Huber W.D. A horizon-varying, zero-one approach to project scheduling. Manage Sci 20 6 (1974) 990-998
-
(1974)
Manage Sci
, vol.20
, Issue.6
, pp. 990-998
-
-
Patterson, J.H.1
Huber, W.D.2
-
32
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
-
Talbot B., and Patterson J. An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems. Manage Sci 24 11 (1978) 1163-1174
-
(1978)
Manage Sci
, vol.24
, Issue.11
, pp. 1163-1174
-
-
Talbot, B.1
Patterson, J.2
-
34
-
-
0027609441
-
The project polyhedron: dimension, facets and lifting theorems
-
Alvarez-Valdes R., and Tamarit J.M. The project polyhedron: dimension, facets and lifting theorems. Eur J Operat Res 67 (1993) 204-220
-
(1993)
Eur J Operat Res
, vol.67
, pp. 204-220
-
-
Alvarez-Valdes, R.1
Tamarit, J.M.2
-
35
-
-
0032070635
-
An exact algorithm for the resource constrained project scheduling problem based on a new mathematical formulation
-
Mingozzi A., Maniezzo V., Ricciardelli S., and Bianco L. An exact algorithm for the resource constrained project scheduling problem based on a new mathematical formulation. Manage Sci 44 5 (1998) 714-729
-
(1998)
Manage Sci
, vol.44
, Issue.5
, pp. 714-729
-
-
Mingozzi, A.1
Maniezzo, V.2
Ricciardelli, S.3
Bianco, L.4
-
36
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester E.L., and Herroelen W.S. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manage Sci 38 12 (1992) 1803-1818
-
(1992)
Manage Sci
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
37
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: theory and computation
-
Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. Eur J Operat Res 90 (1996) 320-333
-
(1996)
Eur J Operat Res
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
39
-
-
0001303226
-
Some properties of schedules for large projects with limited resources
-
Wiest J.D. Some properties of schedules for large projects with limited resources. Operat Res 12 3 (1964) 395-418
-
(1964)
Operat Res
, vol.12
, Issue.3
, pp. 395-418
-
-
Wiest, J.D.1
-
40
-
-
0001694940
-
A heuristic model for scheduling large projects with limited resources
-
Wiest J.D. A heuristic model for scheduling large projects with limited resources. Manage Sci 13 6 (1967) B359-B377
-
(1967)
Manage Sci
, vol.13
, Issue.6
-
-
Wiest, J.D.1
-
41
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
David E.W., and Patterson J.H. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Manage Sci 21 8 (1975) 944-955
-
(1975)
Manage Sci
, vol.21
, Issue.8
, pp. 944-955
-
-
David, E.W.1
Patterson, J.H.2
-
42
-
-
0016972372
-
Heuristics for scheduling resource- constrained projects: an experimental investigation
-
Cooper D.F. Heuristics for scheduling resource- constrained projects: an experimental investigation. Manage Sci 22 11 (1976) 1186-1194
-
(1976)
Manage Sci
, vol.22
, Issue.11
, pp. 1186-1194
-
-
Cooper, D.F.1
-
43
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan W.T., Chua D.K., and Kannan G. Construction resource scheduling with genetic algorithms. J Constr Eng Manage ASCE 122 2 (1996) 125-132
-
(1996)
J Constr Eng Manage ASCE
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.2
Kannan, G.3
-
44
-
-
0002030301
-
Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
-
Weglarz J. (Ed), Kluwer, Amsterdam, The Netherlands
-
Kolisch R., and Hartmann S. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J. (Ed). Handbook on recent advances in project scheduling (1999), Kluwer, Amsterdam, The Netherlands 147-178
-
(1999)
Handbook on recent advances in project scheduling
, pp. 147-178
-
-
Kolisch, R.1
Hartmann, S.2
-
45
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. J Constr Eng Manage ASCE 125 3 (1999) 167-175
-
(1999)
J Constr Eng Manage ASCE
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
46
-
-
13944255840
-
Genetic optimization for dynamic project control
-
Hegazy T., and Petzold K. Genetic optimization for dynamic project control. J Constr Eng Manage ASCE 129 4 (2003) 396-404
-
(2003)
J Constr Eng Manage ASCE
, vol.129
, Issue.4
, pp. 396-404
-
-
Hegazy, T.1
Petzold, K.2
-
47
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction project
-
Senouci A.B., and Eldin N.N. Use of genetic algorithms in resource scheduling of construction project. J Constr Eng Manage ASCE 130 6 (2004) 869-877
-
(2004)
J Constr Eng Manage ASCE
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
48
-
-
34248583136
-
Solving the resource-constrained project scheduling problem by genetic algorithm
-
Long L.D., and Ohsato A. Solving the resource-constrained project scheduling problem by genetic algorithm. J Jpn Indus Manage Assoc, JIMA 57 6 (2007) 520-529
-
(2007)
J Jpn Indus Manage Assoc, JIMA
, vol.57
, Issue.6
, pp. 520-529
-
-
Long, L.D.1
Ohsato, A.2
-
49
-
-
0032117729
-
A Tabu search approach for the resource constrained project scheduling problem
-
Thomas P.R., and Salhi S. A Tabu search approach for the resource constrained project scheduling problem. J Heuristics 4 (1998) 123-139
-
(1998)
J Heuristics
, vol.4
, pp. 123-139
-
-
Thomas, P.R.1
Salhi, S.2
-
50
-
-
0038522570
-
Resource-constrained project scheduling: a critical activity reordering heuristic
-
Valls V., Quintanilla S., and Ballesti{dotless}́n F. Resource-constrained project scheduling: a critical activity reordering heuristic. Eur J Operat Res 149 2 (2003) 282-301
-
(2003)
Eur J Operat Res
, vol.149
, Issue.2
, pp. 282-301
-
-
Valls, V.1
Quintanilla, S.2
Ballestín, F.3
-
51
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
Merkle D., Middendorf M., and Schmeck H. Ant colony optimization for resource-constrained project scheduling. IEEE Trans Evol Comput 6 4 (2002) 333-346
-
(2002)
IEEE Trans Evol Comput
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
52
-
-
30744437401
-
Particle swarm optimization for resource-constrained project scheduling
-
Zhang H., Li H., and Tam C.M. Particle swarm optimization for resource-constrained project scheduling. Int J Project Manage 24 1 (2006) 83-92
-
(2006)
Int J Project Manage
, vol.24
, Issue.1
, pp. 83-92
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
-
53
-
-
0035617605
-
A competitive heuristic solution technique for resource-constrained project scheduling
-
Tormos P., and Lova A. A competitive heuristic solution technique for resource-constrained project scheduling. Ann Operat Res 102 1-4 (2001) 65-81
-
(2001)
Ann Operat Res
, vol.102
, Issue.1-4
, pp. 65-81
-
-
Tormos, P.1
Lova, A.2
-
54
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
-
Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. Eur J Operat Res 127 2 (2000) 394-407
-
(2000)
Eur J Operat Res
, vol.127
, Issue.2
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
55
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. Eur J Operat Res 174 1 (2006) 23-37
-
(2006)
Eur J Operat Res
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
57
-
-
0028528166
-
Fuzzy multiple choice knapsack problem
-
Shinkoh O., and Mitsuo G. Fuzzy multiple choice knapsack problem. Fuzzy Sets Syst 67 1 (1994) 71-80
-
(1994)
Fuzzy Sets Syst
, vol.67
, Issue.1
, pp. 71-80
-
-
Shinkoh, O.1
Mitsuo, G.2
|