메뉴 건너뛰기




Volumn 26, Issue 6, 2008, Pages 688-698

Fuzzy critical chain method for project scheduling under resource constraints and uncertainty

Author keywords

Critical chain method; Fuzzy number; Managing projects; Resource constraints; Uncertainty

Indexed keywords

FUZZY SETS; PROJECT MANAGEMENT; SCHEDULING;

EID: 49349090365     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2007.09.012     Document Type: Article
Times cited : (178)

References (57)
  • 3
    • 0001501655 scopus 로고
    • Application of a technique for research and development program evaluation
    • Malcolm D.G., Roseboom J.H., Clark C.E., and Fazar W. Application of a technique for research and development program evaluation. Operat Res 7 5 (1959) 646-669
    • (1959) Operat Res , vol.7 , Issue.5 , pp. 646-669
    • Malcolm, D.G.1    Roseboom, J.H.2    Clark, C.E.3    Fazar, W.4
  • 4
    • 84868302310 scopus 로고    scopus 로고
    • A practical and accurate alternative to PERT
    • Jozefowska J., and Weglarz J. (Eds), Springer
    • Dodin B. A practical and accurate alternative to PERT. In: Jozefowska J., and Weglarz J. (Eds). Perspectives in modern project scheduling (2006), Springer 3-23
    • (2006) Perspectives in modern project scheduling , pp. 3-23
    • Dodin, B.1
  • 5
    • 0002146440 scopus 로고
    • The use of fuzzy variables in PERT
    • Chanas S., and Kamburowski J. The use of fuzzy variables in PERT. Fuzzy Sets Syst 5 1 (1981) 11-19
    • (1981) Fuzzy Sets Syst , vol.5 , Issue.1 , pp. 11-19
    • Chanas, S.1    Kamburowski, J.2
  • 6
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh L.A. Fuzzy sets. Informat Contr 8 (1965) 338-353
    • (1965) Informat Contr , vol.8 , pp. 338-353
    • Zadeh, L.A.1
  • 9
    • 0020798185 scopus 로고
    • Fuzzy network planning - FNET
    • Gazdik I. Fuzzy network planning - FNET. IEEE Trans Reliab R-32 3 (1983) 304-313
    • (1983) IEEE Trans Reliab , vol.R-32 , Issue.3 , pp. 304-313
    • Gazdik, I.1
  • 10
    • 0024770103 scopus 로고
    • Stochastic and fuzzy PERT
    • Lootsma F.A. Stochastic and fuzzy PERT. Eur J Operat Res 43 2 (1989) 174-183
    • (1989) Eur J Operat Res , vol.43 , Issue.2 , pp. 174-183
    • Lootsma, F.A.1
  • 11
    • 0000732919 scopus 로고    scopus 로고
    • Project network analysis using fuzzy sets theory
    • Lorterapong P., and Moselhi O. Project network analysis using fuzzy sets theory. J Constr Eng Manage ASCE 122 4 (1996) 308-317
    • (1996) J Constr Eng Manage ASCE , vol.122 , Issue.4 , pp. 308-317
    • Lorterapong, P.1    Moselhi, O.2
  • 12
    • 13944250291 scopus 로고    scopus 로고
    • Where do we stand with fuzzy project scheduling?
    • Pierre B., Didier G., and Germain L. Where do we stand with fuzzy project scheduling?. J Constr Eng Manage ASCE 130 1 (2004) 114-123
    • (2004) J Constr Eng Manage ASCE , vol.130 , Issue.1 , pp. 114-123
    • Pierre, B.1    Didier, G.2    Germain, L.3
  • 13
    • 12344320435 scopus 로고    scopus 로고
    • Fuzzy logic approach for activity delay analysis and schedule updating
    • Adriana V.O., and Aminah R.F. Fuzzy logic approach for activity delay analysis and schedule updating. J Constr Eng Manage ASCE 131 1 (2005) 42-51
    • (2005) J Constr Eng Manage ASCE , vol.131 , Issue.1 , pp. 42-51
    • Adriana, V.O.1    Aminah, R.F.2
  • 14
    • 33846382794 scopus 로고    scopus 로고
    • Project schedule management using a fuzzy activity network considering resource and environmental factors
    • Long L.D., and Ohsato A. Project schedule management using a fuzzy activity network considering resource and environmental factors. J Jpn Indus Manage Assoc JIMA 57 4 (2006) 261-271
    • (2006) J Jpn Indus Manage Assoc JIMA , vol.57 , Issue.4 , pp. 261-271
    • Long, L.D.1    Ohsato, A.2
  • 15
    • 0003926816 scopus 로고    scopus 로고
    • The North River Press Publishing Corporation 246p.
    • Goldratt E. Critical chain (1997), The North River Press Publishing Corporation 246p.
    • (1997) Critical chain
    • Goldratt, E.1
  • 16
    • 1542422015 scopus 로고    scopus 로고
    • Critical chain project scheduling: do not oversimplify
    • Herroelen W.S., Leus R., and Demeulemeester E.L. Critical chain project scheduling: do not oversimplify. Project Manage J 33 4 (2002) 48-60
    • (2002) Project Manage J , vol.33 , Issue.4 , pp. 48-60
    • Herroelen, W.S.1    Leus, R.2    Demeulemeester, E.L.3
  • 17
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen W.S., and Leus R. On the merits and pitfalls of critical chain scheduling. J Operat Manage 19 5 (2001) 559-577
    • (2001) J Operat Manage , vol.19 , Issue.5 , pp. 559-577
    • Herroelen, W.S.1    Leus, R.2
  • 18
    • 0035426806 scopus 로고    scopus 로고
    • An investigation into the fundamentals of critical chain project scheduling
    • Herman S. An investigation into the fundamentals of critical chain project scheduling. Int J Project Manage 19 6 (2000) 363-369
    • (2000) Int J Project Manage , vol.19 , Issue.6 , pp. 363-369
    • Herman, S.1
  • 19
    • 0037402599 scopus 로고    scopus 로고
    • Note on the paper "Resource-constrained project management using enhanced theory of constraint by Wei"
    • Elmaghraby S.E.E., Herroelen W., and Leus R. Note on the paper "Resource-constrained project management using enhanced theory of constraint by Wei". Int J Project Manage 21 4 (2002) 301-305
    • (2002) Int J Project Manage , vol.21 , Issue.4 , pp. 301-305
    • Elmaghraby, S.E.E.1    Herroelen, W.2    Leus, R.3
  • 20
    • 33645966496 scopus 로고    scopus 로고
    • Non-delay scheduling as a managerial approach for managing projects
    • Zwikael O., Cohen Y., and Sadeh A. Non-delay scheduling as a managerial approach for managing projects. Int J Project Manage 24 4 (2006) 330-336
    • (2006) Int J Project Manage , vol.24 , Issue.4 , pp. 330-336
    • Zwikael, O.1    Cohen, Y.2    Sadeh, A.3
  • 21
    • 0020193734 scopus 로고
    • Resource constrained project scheduling with time resource trade-offs: The nonpreemptive case
    • Talbot F.B. Resource constrained project scheduling with time resource trade-offs: The nonpreemptive case. Manage Sci 28 10 (1982) 1197-1210
    • (1982) Manage Sci , vol.28 , Issue.10 , pp. 1197-1210
    • Talbot, F.B.1
  • 22
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problem
    • Elsevier Science, Amsterdam
    • Patterson J.H., Slowinski R., Talbot F.B., and Weglarz J. An algorithm for a general class of precedence and resource constrained scheduling problem. Advances in project scheduling (1989), Elsevier Science, Amsterdam 3-28
    • (1989) Advances in project scheduling , pp. 3-28
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 23
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a Simple, general and powerful sequencing Algorithm
    • Sprecher A., and Drexl A. Multi-mode resource-constrained project scheduling by a Simple, general and powerful sequencing Algorithm. Eur J Operat Res 107 2 (1998) 431-450
    • (1998) Eur J Operat Res , vol.107 , Issue.2 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 24
    • 0034311599 scopus 로고    scopus 로고
    • The discrete time/resource trade-off problem in project networks: a branch-and-bound approach
    • Demeulemeester E.L., Reyck B.D., and Herroelen W.S. The discrete time/resource trade-off problem in project networks: a branch-and-bound approach. IIE Trans 32 11 (2000) 1059-1069
    • (2000) IIE Trans , vol.32 , Issue.11 , pp. 1059-1069
    • Demeulemeester, E.L.1    Reyck, B.D.2    Herroelen, W.S.3
  • 25
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • Boctor F.F. Resource-constrained project scheduling by simulated annealing. Int J Prod Res 34 8 (1996) 2335-2352
    • (1996) Int J Prod Res , vol.34 , Issue.8 , pp. 2335-2352
    • Boctor, F.F.1
  • 26
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • Kolisch R., and Drexl A. Local search for nonpreemptive multi-mode resource-constrained project scheduling. IIE Trans 29 11 (1997) 987-999
    • (1997) IIE Trans , vol.29 , Issue.11 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 27
    • 0032166848 scopus 로고    scopus 로고
    • Local search methods for the discrete time/resource trade-off problem in project networks
    • De Reyck B., Demeulemeester E.L., and Herroelen W.S. Local search methods for the discrete time/resource trade-off problem in project networks. Nav Res Log 45 6 (1998) 553-578
    • (1998) Nav Res Log , vol.45 , Issue.6 , pp. 553-578
    • De Reyck, B.1    Demeulemeester, E.L.2    Herroelen, W.S.3
  • 28
    • 0002614325 scopus 로고    scopus 로고
    • A genetic algorithm approach to a general category project scheduling problem
    • Ozdamar L. A genetic algorithm approach to a general category project scheduling problem. IEEE Trans Syst Man Cyber 29 1 (1999) 44-59
    • (1999) IEEE Trans Syst Man Cyber , vol.29 , Issue.1 , pp. 44-59
    • Ozdamar, L.1
  • 29
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: a genetic algorithm
    • Hartman S. Project scheduling with multiple modes: a genetic algorithm. Annals of Operat Res 102 1-4 (2001) 111-135
    • (2001) Annals of Operat Res , vol.102 , Issue.1-4 , pp. 111-135
    • Hartman, S.1
  • 30
    • 0014574409 scopus 로고
    • Multi project scheduling with limited resources: a zero-one programming approach
    • Pritsker A.A.B., Watters L.J., and Wolfe P.M. Multi project scheduling with limited resources: a zero-one programming approach. Manage Sci 16 1 (1969) 93-108
    • (1969) Manage Sci , vol.16 , Issue.1 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 31
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • Patterson J.H., and Huber W.D. A horizon-varying, zero-one approach to project scheduling. Manage Sci 20 6 (1974) 990-998
    • (1974) Manage Sci , vol.20 , Issue.6 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 32
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • Talbot B., and Patterson J. An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems. Manage Sci 24 11 (1978) 1163-1174
    • (1978) Manage Sci , vol.24 , Issue.11 , pp. 1163-1174
    • Talbot, B.1    Patterson, J.2
  • 34
    • 0027609441 scopus 로고
    • The project polyhedron: dimension, facets and lifting theorems
    • Alvarez-Valdes R., and Tamarit J.M. The project polyhedron: dimension, facets and lifting theorems. Eur J Operat Res 67 (1993) 204-220
    • (1993) Eur J Operat Res , vol.67 , pp. 204-220
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 35
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for the resource constrained project scheduling problem based on a new mathematical formulation
    • Mingozzi A., Maniezzo V., Ricciardelli S., and Bianco L. An exact algorithm for the resource constrained project scheduling problem based on a new mathematical formulation. Manage Sci 44 5 (1998) 714-729
    • (1998) Manage Sci , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 36
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester E.L., and Herroelen W.S. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manage Sci 38 12 (1992) 1803-1818
    • (1992) Manage Sci , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 37
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. Eur J Operat Res 90 (1996) 320-333
    • (1996) Eur J Operat Res , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 39
    • 0001303226 scopus 로고
    • Some properties of schedules for large projects with limited resources
    • Wiest J.D. Some properties of schedules for large projects with limited resources. Operat Res 12 3 (1964) 395-418
    • (1964) Operat Res , vol.12 , Issue.3 , pp. 395-418
    • Wiest, J.D.1
  • 40
    • 0001694940 scopus 로고
    • A heuristic model for scheduling large projects with limited resources
    • Wiest J.D. A heuristic model for scheduling large projects with limited resources. Manage Sci 13 6 (1967) B359-B377
    • (1967) Manage Sci , vol.13 , Issue.6
    • Wiest, J.D.1
  • 41
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • David E.W., and Patterson J.H. A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Manage Sci 21 8 (1975) 944-955
    • (1975) Manage Sci , vol.21 , Issue.8 , pp. 944-955
    • David, E.W.1    Patterson, J.H.2
  • 42
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource- constrained projects: an experimental investigation
    • Cooper D.F. Heuristics for scheduling resource- constrained projects: an experimental investigation. Manage Sci 22 11 (1976) 1186-1194
    • (1976) Manage Sci , vol.22 , Issue.11 , pp. 1186-1194
    • Cooper, D.F.1
  • 43
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • Chan W.T., Chua D.K., and Kannan G. Construction resource scheduling with genetic algorithms. J Constr Eng Manage ASCE 122 2 (1996) 125-132
    • (1996) J Constr Eng Manage ASCE , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.T.1    Chua, D.K.2    Kannan, G.3
  • 44
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • Weglarz J. (Ed), Kluwer, Amsterdam, The Netherlands
    • Kolisch R., and Hartmann S. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J. (Ed). Handbook on recent advances in project scheduling (1999), Kluwer, Amsterdam, The Netherlands 147-178
    • (1999) Handbook on recent advances in project scheduling , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 45
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. J Constr Eng Manage ASCE 125 3 (1999) 167-175
    • (1999) J Constr Eng Manage ASCE , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 46
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • Hegazy T., and Petzold K. Genetic optimization for dynamic project control. J Constr Eng Manage ASCE 129 4 (2003) 396-404
    • (2003) J Constr Eng Manage ASCE , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 47
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction project
    • Senouci A.B., and Eldin N.N. Use of genetic algorithms in resource scheduling of construction project. J Constr Eng Manage ASCE 130 6 (2004) 869-877
    • (2004) J Constr Eng Manage ASCE , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 48
    • 34248583136 scopus 로고    scopus 로고
    • Solving the resource-constrained project scheduling problem by genetic algorithm
    • Long L.D., and Ohsato A. Solving the resource-constrained project scheduling problem by genetic algorithm. J Jpn Indus Manage Assoc, JIMA 57 6 (2007) 520-529
    • (2007) J Jpn Indus Manage Assoc, JIMA , vol.57 , Issue.6 , pp. 520-529
    • Long, L.D.1    Ohsato, A.2
  • 49
    • 0032117729 scopus 로고    scopus 로고
    • A Tabu search approach for the resource constrained project scheduling problem
    • Thomas P.R., and Salhi S. A Tabu search approach for the resource constrained project scheduling problem. J Heuristics 4 (1998) 123-139
    • (1998) J Heuristics , vol.4 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2
  • 50
    • 0038522570 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: a critical activity reordering heuristic
    • Valls V., Quintanilla S., and Ballesti{dotless}́n F. Resource-constrained project scheduling: a critical activity reordering heuristic. Eur J Operat Res 149 2 (2003) 282-301
    • (2003) Eur J Operat Res , vol.149 , Issue.2 , pp. 282-301
    • Valls, V.1    Quintanilla, S.2    Ballestín, F.3
  • 51
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • Merkle D., Middendorf M., and Schmeck H. Ant colony optimization for resource-constrained project scheduling. IEEE Trans Evol Comput 6 4 (2002) 333-346
    • (2002) IEEE Trans Evol Comput , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 52
    • 30744437401 scopus 로고    scopus 로고
    • Particle swarm optimization for resource-constrained project scheduling
    • Zhang H., Li H., and Tam C.M. Particle swarm optimization for resource-constrained project scheduling. Int J Project Manage 24 1 (2006) 83-92
    • (2006) Int J Project Manage , vol.24 , Issue.1 , pp. 83-92
    • Zhang, H.1    Li, H.2    Tam, C.M.3
  • 53
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • Tormos P., and Lova A. A competitive heuristic solution technique for resource-constrained project scheduling. Ann Operat Res 102 1-4 (2001) 65-81
    • (2001) Ann Operat Res , vol.102 , Issue.1-4 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 54
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • Hartmann S., and Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. Eur J Operat Res 127 2 (2000) 394-407
    • (2000) Eur J Operat Res , vol.127 , Issue.2 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 55
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch R., and Hartmann S. Experimental investigation of heuristics for resource-constrained project scheduling: An update. Eur J Operat Res 174 1 (2006) 23-37
    • (2006) Eur J Operat Res , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 57
    • 0028528166 scopus 로고
    • Fuzzy multiple choice knapsack problem
    • Shinkoh O., and Mitsuo G. Fuzzy multiple choice knapsack problem. Fuzzy Sets Syst 67 1 (1994) 71-80
    • (1994) Fuzzy Sets Syst , vol.67 , Issue.1 , pp. 71-80
    • Shinkoh, O.1    Mitsuo, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.