-
5
-
-
4644226546
-
Adaptive resource allocation in multimodal activity networks
-
Teresoa A.P., Araujo M.T., and Elmaghraby S.E.: "Adaptive resource allocation in multimodal activity networks", Int. J. Prod. Economics, Vol 92, pp. 1-10 (2004).
-
(2004)
Int. J. Prod. Economics
, vol.92
, pp. 1-10
-
-
Teresoa, A.P.1
Araujo, M.T.2
Elmaghraby, S.E.3
-
6
-
-
0035138778
-
Resource Scheduling Using Neural Dynamics Model of Adeli and Park"
-
Senouci A.B.and Adeli H.: "Resource Scheduling Using Neural Dynamics Model of Adeli and Park", J.Constr. Engrg. and Mgmt., ASCE, Vol.127, No.1, pp.28-34 (2001).
-
(2001)
J.Constr. Engrg. and Mgmt., ASCE
, vol.127
, Issue.1
, pp. 28-34
-
-
Senouci, A.B.1
Adeli, H.2
-
7
-
-
0002907360
-
A branch and Bound procedure for multiple resource-constrained project scheduling problem
-
Demeulemesster E.L. and Herroelen W.S.: "A branch and Bound procedure for multiple resource-constrained project scheduling problem", Management Science, Vol.38, pp.1803-1818 (1992).
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemesster, E.L.1
Herroelen, W.S.2
-
8
-
-
0032187584
-
Calculating Weight Matrix of Neural Network for Resource Leveling
-
Savin D., Alkass S. and Fazio P.: "Calculating Weight Matrix of Neural Network for Resource Leveling", Journal of Computing in Civil Engineering, Vol.12, No.4, pp.241-248 (1998).
-
(1998)
Journal of Computing in Civil Engineering
, vol.12
, Issue.4
, pp. 241-248
-
-
Savin, D.1
Alkass, S.2
Fazio, P.3
-
10
-
-
1642436954
-
Solving the resource-constrained project scheduling problem by a variable neighbourhood search
-
Fleszar K., Hindi K.S.: "Solving the resource-constrained project scheduling problem by a variable neighbourhood search", European Journal of Operational Research, Vol.155, No.2, pp.402-413 (2004).
-
(2004)
European Journal of Operational Research
, vol.155
, Issue.2
, pp. 402-413
-
-
Fleszar, K.1
Hindi, K.S.2
-
11
-
-
0032642926
-
Optimization of Resource Allocation and Leveling Using Genetic Algorithms"
-
Tarek Hegazy: "Optimization of Resource Allocation and Leveling Using Genetic Algorithms", J.Constr. Engrg. and Mgmt., ASCE, Vol. 125, No.3, 167-175 (1999).
-
(1999)
J.Constr. Engrg. and Mgmt., ASCE
, vol.125
, Issue.3
, pp. 167-175
-
-
Tarek Hegazy1
-
13
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis E., and Patterson J.H.: "A comparison of heuristic and optimum solutions in resource-constrained project scheduling", Management Science, Vol.21, No.8, pp.944-955 (1975).
-
(1975)
Management Science
, vol.21
, Issue.8
, pp. 944-955
-
-
Davis, E.1
Patterson, J.H.2
-
14
-
-
0016972372
-
Heuristics for scheduling resource- constrained projects: An Experimental Investigation
-
Cooper D.F.: "Heuristics for scheduling resource- constrained projects: An Experimental Investigation", Management Science, Vol.22, No.11, pp.1186-1194 (1976).
-
(1976)
Management Science
, vol.22
, Issue.11
, pp. 1186-1194
-
-
Cooper, D.F.1
-
15
-
-
0001303226
-
Some properties of schedules for large projects with limited resource
-
Wiest J.D.: "Some properties of schedules for large projects with limited resource", Operations Research, Vol.12, pp.395-416 (1964).
-
(1964)
Operations Research
, vol.12
, pp. 395-416
-
-
Wiest, J.D.1
-
16
-
-
34248547192
-
-
Kolisch, and Hartmann: Heuristic algorithms for resource-constrained project scheduling: Classification and Computational Analysis in Project Scheduling: Recent Models, Algorithms and Applications, Jan Weglarz (Eds.) (1999).
-
Kolisch, and Hartmann: "Heuristic algorithms for resource-constrained project scheduling: Classification and Computational Analysis" in Project Scheduling: Recent Models, Algorithms and Applications, Jan Weglarz (Eds.) (1999).
-
-
-
-
17
-
-
34248592228
-
-
Goldberg D.E.: Genetic Algorithms in Search, Optimization and Machine Learning, Addison-Wesley (1989).
-
Goldberg D.E.: Genetic Algorithms in Search, Optimization and Machine Learning, Addison-Wesley (1989).
-
-
-
-
19
-
-
1842587322
-
Construction Resource Scheduling with Genetic Algorithms"
-
Chan W.T., Chua D.K. and Kannan G.: "Construction Resource Scheduling with Genetic Algorithms", J.Constr. Engrg. and Mgmt., ASCE, Vol.122, No.2, pp.125-132 (1996).
-
(1996)
J.Constr. Engrg. and Mgmt., ASCE
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.2
Kannan, G.3
-
20
-
-
13944251756
-
-
Senouci.A.B , and Eldin.N.N: Use of Genetic Algorithms in Resource Scheduling of Construction Project, J.Constr. Engrg. and Mgmt., ASCE, 130, No.6, pp.869-877 (2004).
-
Senouci.A.B , and Eldin.N.N: "Use of Genetic Algorithms in Resource Scheduling of Construction Project", J.Constr. Engrg. and Mgmt., ASCE, Vol.130, No.6, pp.869-877 (2004).
-
-
-
-
21
-
-
34248587917
-
-
Luong Due Long, and Ario Ohsato: An optimization method for determining activity durations in project scheduling management The papers of Technical Meeting on Information Systems, IEE Japan, pp.23-28 (2005).
-
Luong Due Long, and Ario Ohsato: "An optimization method for determining activity durations in project scheduling management" The papers of Technical Meeting on Information Systems, IEE Japan, pp.23-28 (2005).
-
-
-
-
22
-
-
0003926816
-
-
North River Press Publishing Corporation
-
Eliyahu Goldratt: Critical Chain, North River Press Publishing Corporation (1997).
-
(1997)
Critical Chain
-
-
Eliyahu Goldratt1
|