메뉴 건너뛰기




Volumn 57, Issue 6, 2007, Pages 520-529

Solving the resource-constrained project scheduling problem by genetic algorithm

Author keywords

Fixed activity durations; Genetic algorithm; Heuristics; Resource constrained project scheduling problem (RCPSP); Variable activity durations

Indexed keywords

CONSTRAINT THEORY; GENETIC ALGORITHMS; HEURISTIC METHODS; OPTIMIZATION; SCHEDULING;

EID: 34248583136     PISSN: 13422618     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (4)

References (22)
  • 5
    • 4644226546 scopus 로고    scopus 로고
    • Adaptive resource allocation in multimodal activity networks
    • Teresoa A.P., Araujo M.T., and Elmaghraby S.E.: "Adaptive resource allocation in multimodal activity networks", Int. J. Prod. Economics, Vol 92, pp. 1-10 (2004).
    • (2004) Int. J. Prod. Economics , vol.92 , pp. 1-10
    • Teresoa, A.P.1    Araujo, M.T.2    Elmaghraby, S.E.3
  • 6
    • 0035138778 scopus 로고    scopus 로고
    • Resource Scheduling Using Neural Dynamics Model of Adeli and Park"
    • Senouci A.B.and Adeli H.: "Resource Scheduling Using Neural Dynamics Model of Adeli and Park", J.Constr. Engrg. and Mgmt., ASCE, Vol.127, No.1, pp.28-34 (2001).
    • (2001) J.Constr. Engrg. and Mgmt., ASCE , vol.127 , Issue.1 , pp. 28-34
    • Senouci, A.B.1    Adeli, H.2
  • 7
    • 0002907360 scopus 로고
    • A branch and Bound procedure for multiple resource-constrained project scheduling problem
    • Demeulemesster E.L. and Herroelen W.S.: "A branch and Bound procedure for multiple resource-constrained project scheduling problem", Management Science, Vol.38, pp.1803-1818 (1992).
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemesster, E.L.1    Herroelen, W.S.2
  • 8
    • 0032187584 scopus 로고    scopus 로고
    • Calculating Weight Matrix of Neural Network for Resource Leveling
    • Savin D., Alkass S. and Fazio P.: "Calculating Weight Matrix of Neural Network for Resource Leveling", Journal of Computing in Civil Engineering, Vol.12, No.4, pp.241-248 (1998).
    • (1998) Journal of Computing in Civil Engineering , vol.12 , Issue.4 , pp. 241-248
    • Savin, D.1    Alkass, S.2    Fazio, P.3
  • 10
    • 1642436954 scopus 로고    scopus 로고
    • Solving the resource-constrained project scheduling problem by a variable neighbourhood search
    • Fleszar K., Hindi K.S.: "Solving the resource-constrained project scheduling problem by a variable neighbourhood search", European Journal of Operational Research, Vol.155, No.2, pp.402-413 (2004).
    • (2004) European Journal of Operational Research , vol.155 , Issue.2 , pp. 402-413
    • Fleszar, K.1    Hindi, K.S.2
  • 11
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of Resource Allocation and Leveling Using Genetic Algorithms"
    • Tarek Hegazy: "Optimization of Resource Allocation and Leveling Using Genetic Algorithms", J.Constr. Engrg. and Mgmt., ASCE, Vol. 125, No.3, 167-175 (1999).
    • (1999) J.Constr. Engrg. and Mgmt., ASCE , vol.125 , Issue.3 , pp. 167-175
    • Tarek Hegazy1
  • 13
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis E., and Patterson J.H.: "A comparison of heuristic and optimum solutions in resource-constrained project scheduling", Management Science, Vol.21, No.8, pp.944-955 (1975).
    • (1975) Management Science , vol.21 , Issue.8 , pp. 944-955
    • Davis, E.1    Patterson, J.H.2
  • 14
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource- constrained projects: An Experimental Investigation
    • Cooper D.F.: "Heuristics for scheduling resource- constrained projects: An Experimental Investigation", Management Science, Vol.22, No.11, pp.1186-1194 (1976).
    • (1976) Management Science , vol.22 , Issue.11 , pp. 1186-1194
    • Cooper, D.F.1
  • 15
    • 0001303226 scopus 로고
    • Some properties of schedules for large projects with limited resource
    • Wiest J.D.: "Some properties of schedules for large projects with limited resource", Operations Research, Vol.12, pp.395-416 (1964).
    • (1964) Operations Research , vol.12 , pp. 395-416
    • Wiest, J.D.1
  • 16
    • 34248547192 scopus 로고    scopus 로고
    • Kolisch, and Hartmann: Heuristic algorithms for resource-constrained project scheduling: Classification and Computational Analysis in Project Scheduling: Recent Models, Algorithms and Applications, Jan Weglarz (Eds.) (1999).
    • Kolisch, and Hartmann: "Heuristic algorithms for resource-constrained project scheduling: Classification and Computational Analysis" in Project Scheduling: Recent Models, Algorithms and Applications, Jan Weglarz (Eds.) (1999).
  • 17
    • 34248592228 scopus 로고    scopus 로고
    • Goldberg D.E.: Genetic Algorithms in Search, Optimization and Machine Learning, Addison-Wesley (1989).
    • Goldberg D.E.: Genetic Algorithms in Search, Optimization and Machine Learning, Addison-Wesley (1989).
  • 19
    • 1842587322 scopus 로고    scopus 로고
    • Construction Resource Scheduling with Genetic Algorithms"
    • Chan W.T., Chua D.K. and Kannan G.: "Construction Resource Scheduling with Genetic Algorithms", J.Constr. Engrg. and Mgmt., ASCE, Vol.122, No.2, pp.125-132 (1996).
    • (1996) J.Constr. Engrg. and Mgmt., ASCE , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.T.1    Chua, D.K.2    Kannan, G.3
  • 20
    • 13944251756 scopus 로고    scopus 로고
    • Senouci.A.B , and Eldin.N.N: Use of Genetic Algorithms in Resource Scheduling of Construction Project, J.Constr. Engrg. and Mgmt., ASCE, 130, No.6, pp.869-877 (2004).
    • Senouci.A.B , and Eldin.N.N: "Use of Genetic Algorithms in Resource Scheduling of Construction Project", J.Constr. Engrg. and Mgmt., ASCE, Vol.130, No.6, pp.869-877 (2004).
  • 21
    • 34248587917 scopus 로고    scopus 로고
    • Luong Due Long, and Ario Ohsato: An optimization method for determining activity durations in project scheduling management The papers of Technical Meeting on Information Systems, IEE Japan, pp.23-28 (2005).
    • Luong Due Long, and Ario Ohsato: "An optimization method for determining activity durations in project scheduling management" The papers of Technical Meeting on Information Systems, IEE Japan, pp.23-28 (2005).
  • 22
    • 0003926816 scopus 로고    scopus 로고
    • North River Press Publishing Corporation
    • Eliyahu Goldratt: Critical Chain, North River Press Publishing Corporation (1997).
    • (1997) Critical Chain
    • Eliyahu Goldratt1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.